ML23062A649

From kanterella
Jump to navigation Jump to search
Submittal of Revision OL-26 to Final Safety Analysis Report and Revision 18 to Technical Specification Bases
ML23062A649
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/29/2022
From: Witt T
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML23067A139 List: ... further results
References
ULNRC-06782
Download: ML23062A649 (1)


Text

~rt:- '

WAmeren Callaway Plant MISSOURI
                                    • .. *---******-*-**ooWu .. ,,,_,_,_, ...... ..., ** ' ..., .......... ' *-******--***-*--**

.....-..... ,, ********** ,.. *** ,.,.,.,.,,,,..,.,._.,,,000000100000 ************-**********-****** *h*********** .. *** .. ..*-*-*-*** .. * .. ***************************'***'* *h******Ohooooo****ooo

                        • .. ************ .. ***---*******,-*"1'****-********* * .. *-* .. **** .. *-*o-oo,,....,., .. ,*************** .. ********V****************v**** *****---**** 0 ************* .. ****HO :******...,*-****-*** .. **** ...... * .. .-....,,,...,,.,_,, .. ,.., ...................... ..,,._. ,** * ***t**,-.****-*******-***

December 29, 2022 ULNRC-0678 2 U.S. Nuclear Regulatory Commission Attn: Document CPntrol Desk Washington, DC 20555-0001 10 CFR 2.390(d)(l) 10 CFR 50.71(e) 10 CFR 50.4(b)(6) 10 CFR 54.37(b)

Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC co~

  • RENEWED FACILITY OPERATING LICENSE NPF-30 FINAL SAFETY ANALYSIS REPORT REVISION OL-26 AND TECHNICAL SPECIFICATION BASES REVISION 18 In accordance with:the requirements of 10 CFR 50.7l(e) and 10 CFR 50.4(b)(6), Union Electric Company (Ameren Missouri) herewith submits Revision OL-26 to the Callaway Plant Final Safety Analysis Report (FSAR) (Standard Plant and Site Addendum), as well as Revision 18 to the Callaway Plant Technical Specification Bases (TS Bases). Pursuant to 10 CPR, 50.71(e), these revisions reflect all of the changes :r;nade to the plant during the period from submittal *of the last FSAR and TS Bases update (June 22, 2021) to 6 months prior to the date of this filing.

These documents are being transmitted in electronic format in accordance with the guidance of Regulatory Issue Summary (RIS) 2001-05, dated January 25, 2001. With respect to the FSAR, redacted ~d non-redacted v~ions are maintained due to the inclusion of sensfrive unclassified, non-safeguards information (SUNsn in the FSAR (as identified and affirmed in response to RIS 2015-17,

.*dated December 23, 2015). Two CD-ROMs ~e therefore provided with this submittal. One *CD-ROM provides a public/redacte d copy of the Callaway Plant FSAR. A second CD-ROM provides a copy of the nonpublic/redacted portions of the Callaway Plant FSAR, which includes SUNSI material that should be ~thheld from public disclosure in accordance with 10 CFR 2.390(d)(l).

In addition,to the updated FSAR and TS Bases, the enclosed CD-ROM includes the-Callaway Plant Operating License, and Technicaj Specifications for Callaway Plant updated through December 27,

~.D-5)

    • -****---****...,***-******* ****-*******--* .... *******--* .. **-***-*-*-*ea*---**--*- ******

......... ~---~-"""-*-*************-******

    • -*****-**ou,,,.....,**** .. ****-**************-**-******* **********-*******---**-****** .. *-*-****

' *~(<_(Z ..... ,_

, ~

-***--**--*****. 8315 County Road 459 : Steedman, MO 65077 AmerenMissouri.com }\j

-~ IB,,NRC~06782 December 29, 2022

  • Page 2 of 4 2022. Also included are "FSAR Change Log" and "TS Bases Change Log" files that provide information on the PSAR Change Notices that were incorporated into PSAR Revision OL-26 and the TS Bases Change Notices that were incorporated into TS Bases Revision 18 respectively.

In connection with this update, and in light of Callaway Plant's renewed Operating License, a review of changes subject to inclusion per 10 CPR 54.3 7(b) was performed for the. period of December :22, 2020, through May 30, 2022: The review did not find any newly identified systems, structures, or components that would have been subject to an aging management review or evaluation of time- .

Ameren Missouri recognizes* that the due date for this submittal per 10 CPR 50. 71 (e), .based upon

  • startup from Callaway's most recent refueling outage, was November 30, 2022. The discrepancy in submittal timeliness has been entered into the plant's corrective action program.

This letter contains no new commitments. Please contact Mr. Tom Elwood.at 314-225-1905 for any questions you may have regarding this submittal.

I declare under penalty of perjury that the foregoing is true and correct Sincerely, Executed on: /Z- 'Z zoz.:z...

Todd A. Witt Manager, Regulatory Affairs

Enclosures:

1. CD I -Callaway Licensing Basis Documents-December 27, 2022 -Public/Redacted 2, CD 2-Callaway Licensing Basis I;>ocuments-December 27, 2022-Nonpublic/Unred.a cted- Withhold per RIS 2015-17

,-***************......,,.,.,,,, ... ,,, ... , .............. ..., ........ , ......................... ..,. ................... .._,,...,,,_... ................................. ,.... ......................... , ... ,...,,...,, ......... ..., .... u .. ,,, *****************************-****oo*U**********

.. ****-*******-* .. *******u

, ................................................................. - .................................................... 0-4..,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..............................................................

                  • -*"**"-""" ...
  • oo *
  • ooo-.o-o***,....-*******---***oo*,o-*" """"**"********oo"**** .. .,* .. **** .. oo"******"******oo***""****--*...,****oooo*"" .. **.,, .. "4***** .. ****---* ............................ uO'o*OOo-.* .. * .... *-..oo* .. *-** .. *** .. ***-* .,.., .... . ................... ..

-:~ ULNRC-06782 December 29, 2022 Page 3 of 4 cc: Mr. Scott A. Morris Regional Administrator .

U.S. Nuclear Regulatory Commissiop.*

Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office

. U.S. Nuclear Regulatory Commission

.8201 NRC Road. .

Steedman, MO 65077 Mr. M. Chawla Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08B1A Washington, DC 20555-0001

.......... **** .. ******-*-****-************* .. * .. ********n************************-*"-""****-***** .. *oe-**--**...,********** .. * ... *******-***********ao .. ***********---************...,******* .. *-*-*******-** .. **** .. ****** .. *-** .. ********* .. ...,*****-*-**---************-*****

................................................... _.......................................... -*-**** .. *---* .. ******o-o***** .................................................................................... _.. ,........................................................ ........................ - ...... .

,- , ULNRC~06782 December 29, 2022 Page 4 of 4

  • Inde:x and send hardcopy to QA File A160,0761 Hardcopy:

Certrec Corporation 6500 West Freeway, Suite 400 Fort Worth, TX 76116 (Certrec receives A:I,L attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic . distribution. for the following can be made via Other Situations ULNRC Distribution:

F.M.Diya B. L. Cox

-D. E. Farnsworth B. L. Jungmann W. A. Witt T. A. Witt T. B. Elwoqd NSRB Secretary STARS Regulatory Affairs Mr. Aaron Schmidt (DNR)

Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)

Ms. Claire Eubanks (Public Service Commission)

--*---****n** .. ***.,.********** .. **********-*******-**********---*-o****-***** *******************-*...,*-***-********* ************-** ..... ..., ..... ..., ************ *************************-*-**-*********-******* .. ******---**************---****************-*******-*-*********

.