Category:Letter
MONTHYEARIR 05000483/20240032024-10-23023 October 2024 Integrated Inspection Report 05000483/2024003 IR 05000483/20240132024-10-21021 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2024013 IR 05000483/20244012024-10-0909 October 2024 Material Control and Accounting Program Inspection Report 05000483/2024401 Public ULNRC-06901, Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter)2024-10-0101 October 2024 Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter) ML24247A3042024-09-11011 September 2024 Regulatory Audit Questions for License Renewal Commitments 34 and 35 (EPID L-2024-LRO-0009) - Non-Proprietary IR 05000483/20244032024-08-28028 August 2024 Security Baseline Inspection 05000483-2024-403 IR 05000483/20240052024-08-14014 August 2024 Updated Inspection Plan for Callaway Plant (Report 05000483/2024005) IR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 ML24212A2822024-08-0202 August 2024 Regulatory Audit Summary Concerning Review of Request No. C3R-01 for Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections IR 05000483/20240022024-07-18018 July 2024 And Independent Spent Fuel Storage Installation Integrated Inspection Report 05000483/2024002 and 07201045/2024001 ML24185A1032024-07-16016 July 2024 2024 Biennial Problem Identification and Resolution Inspection Report ULNRC-06892, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00062024-06-26026 June 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0006 ULNRC-06891, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00052024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0005 ULNRC-06884, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00022024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0002 ULNRC-06886, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00042024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0004 ULNRC-06885, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00032024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0003 ML24144A0492024-06-11011 June 2024 Requests for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML24158A5222024-06-0606 June 2024 Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008) ML24178A1132024-06-0606 June 2024 Ameren Missouris Intent to Adopt Revision 1 to Amendment 0 of Certificate of Compliance No. 1040 as Applicable to the ISFSI at the Callaway Plant Site ML24143A1632024-05-23023 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Storage Canister HGMPC0001 ULNRC-06882, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00122024-05-16016 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0012 ML24137A2342024-05-16016 May 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Canister HGMPC0011 ML24122A1502024-05-0707 May 2024 Audit Plan to Support Review of Steam Generator License Renewal Response to Commitment Nos 34 and 35 ULNRC-06877, Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 252024-05-0606 May 2024 Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25 IR 05000483/20244022024-05-0606 May 2024 Security Baseline Inspection Report 05000483/2024402 (Full Report) IR 05000483/20240112024-05-0101 May 2024 NRC Post-Approval Site Inspection for License Renewal (Phase 2) Report 05000483/2024011 ULNRC-06856, CFR 50.59 and 10 CFR 72.48 Summary Report2024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report ML24122A1132024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radioactive Effluent Release Report ULNRC-06876, Registration of Dry Spent Fuel Storage Canister HGMPC00102024-04-25025 April 2024 Registration of Dry Spent Fuel Storage Canister HGMPC0010 ML24108A1082024-04-17017 April 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0009 ULNRC-06871, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00072024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0007 ULNRC-06872, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00082024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0008 ULNRC-06866, Submittal of Cycle 26 Commitment Change Summary Report2024-04-17017 April 2024 Submittal of Cycle 26 Commitment Change Summary Report IR 05000483/20240012024-04-16016 April 2024 Integrated Inspection Report 05000483/2024001 IR 05000483/20244042024-04-0909 April 2024 Cyber Security Inspection Report 05000483/2024404 ML24088A3212024-04-0101 April 2024 Notification of Commercial Grade Dedication Inspection (05000483/2024013) and Request for Information ML24086A5132024-03-26026 March 2024 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06863, Submittal of Annual Exposure Report for 20232024-03-20020 March 2024 Submittal of Annual Exposure Report for 2023 ML24079A1622024-03-19019 March 2024 Re Nuclear Property Insurance Reporting ML24066A1932024-03-0707 March 2024 2024 Callaway Plant Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ULNRC-06852, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 262024-03-0505 March 2024 Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 26 IR 05000483/20230062024-02-28028 February 2024 Annual Assessment Letter for Callaway Plant Report 05000483/2023006 ML24052A3662024-02-26026 February 2024 Regulatory Audit Plan in Support of Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ULNRC-06858, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-02-21021 February 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ML24036A1712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0079 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) IR 05000483/20230042024-01-19019 January 2024 – Integrated Inspection Report 05000483/2023004 ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 2024-09-11
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23318A1082023-12-28028 December 2023 FSAR Chapter 1, Figures Redacted ULNRC-06822, FSAR Markup for FSAR Site Addendum (SA) Sections 13.1.3.1, 13.1.3.1.18, and 13.1.3.1.192023-06-14014 June 2023 FSAR Markup for FSAR Site Addendum (SA) Sections 13.1.3.1, 13.1.3.1.18, and 13.1.3.1.19 ML23062A6062022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 8, Electric Power ML23062A6072022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Figure 5.2-2, Primary Coolant Leak Detection Response Time ML23062A6082022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Figures ML23062A6092022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23062A6112022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Sections ML23062A6122022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figures ML23062A6132022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Tables ML23062A6152022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 2, Figures ML23062A6162022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-1, Revision 17, Nuclear Power and DNBR Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6172022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 14, Initial Test Program ML23062A6182022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23062A6192022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, General Table of Contents ML23062A6202022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 4, Figures ML23062A6212022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Figure 18.2-12, Functional Diagram Reactor Core Subcooling Monitor ML23062A6222022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23062A6232022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Index to NRC Questions and Responses ML23062A6242022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 19, License Renewal Supplement ML23062A6252022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Figures ML23062A6262022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 11, Figures ML23062A6272022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 7, Figures ML23062A6282022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 3, Figures ML23062A6292022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 9, Figures ML23062A6302022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 2, Site Characteristics ML23062A6312022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 4, Reactor ML23062A6322022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 12, Figures ML23062A6332022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23062A6342022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 10, Figures ML23062A6352022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Accident Analysis ML23062A6362022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23062A6372022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Change Notice Log ML23062A6382022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Figures ML23062A6392022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 8, Figures ML23062A6402022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant ML23062A6412022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 12, Radiation Protection ML23062A6422022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23062A6432022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-2, Revision 17, Pressurizer Pressure and Vessel Average Temperature Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6442022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML23062A6452022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23062A6472022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 6, Figures ML23062A6502022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Clarification of TMI Action Plan Requirements ML23062A6512022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 16, Technical Requirements ML23062A6522022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 16, Figures ML23062A6532022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 17, Quality Assurance ML23062A6542022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Figures ML23062A6492022-12-29029 December 2022 Submittal of Revision OL-26 to Final Safety Analysis Report and Revision 18 to Technical Specification Bases ML22335A5102022-12-0101 December 2022 Attachment 1 - Proposed FSAR Change (Markups) ML21348A7492021-12-16016 December 2021 FSAR Revision 25 Chapter 1 Figures Redacted ML21335A4582021-12-0101 December 2021 Enclosure 6: Proposed Final Safety Analysis Report Changes (Mark-up - for Info Only) 2023-06-14
[Table view] |
Text
- WAmeren Callaway Plant ~rt:- '
MISSOURI
- .. *---******-*-**ooWu..,,,_,_,_,........., ** ' '...,...............-.....,, **********,.. ***,.,.,.,.,,,,..,.,._.,,,000000100000 ************-**********-*******h***********.. ***.. *-******--***-*--**
- .. ************.. ***---*******,-*"1'****-**********.. *-*.. ****.. *-*o-oo,,....,.,..,***************.. ********V****************v*********---****0 *************.. *-*-*-***.. *.. ***************************'***'**h******Ohooooo****ooo
.. ****HO :******...,*-****-***.. ****...... *...-....,,,...,,.,_,,..,..,........................,,._.,**
- ***t**,-.****-*******-***
December 29, 2022
ULNRC-06782
U.S. Nuclear Regulatory Commission Attn: Document CPntrol Desk Washington, DC 20555-0001
10 CFR 2.390(d)(l) 10 CFR 50.71(e) 10 CFR 50.4(b)(6) 10 CFR 54.37(b)
Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC co~
- RENEWED FACILITY OPERATING LICENSE NPF-30 FINAL SAFETY ANALYSIS REPORT REVISION OL-26 AND TECHNICAL SPECIFICATION BASES REVISION 18
In accordance with:the requirements of 10 CFR 50.7l(e) and 10 CFR 50.4(b)(6), Union Electric Company (Ameren Missouri) herewith submits Revision OL-26 to the Callaway Plant Final Safety Analysis Report (FSAR) (Standard Plant and Site Addendum), as well as Revision 18 to the Callaway Plant Technical Specification Bases (TS Bases). Pursuant to 10 CPR, 50.71(e), these revisions reflect all of the changes :r;nade to the plant during the period from submittal *of the last FSAR and TS Bases update (June 22, 2021) to 6 months prior to the date of this filing.
These documents are being transmitted in electronic format in accordance with the guidance of Regulatory Issue Summary (RIS) 2001-05, dated January 25, 2001. With respect to the FSAR, redacted ~d non-redacted v~ions are maintained due to the inclusion of sensfrive unclassified, non safeguards information (SUNsn in the FSAR (as identified and affirmed in response to RIS 2015-17,
.
- dated December 23, 2015). Two CD-RO Ms ~e therefore provided with this submittal. One *CD ROM provides a public/redacted copy of the Callaway Plant FSAR. A second CD-ROM provides a copy of the nonpublic/redacted portions of the Callaway Plant FSAR, which includes SUNSI material that should be ~thheld from public disclosure in accordance with 10 CFR 2.390(d)(l).
In addition,to the updated FSAR and TS Bases, the enclosed CD-ROM includes the-Callaway Plant Operating License, and Technicaj Specifications for Callaway Plant updated through December 27,
~.D-5)
- -****---****...,***-***********-*******--*.... *******--*.. **-***-*-*-*ea*---**--*-******
- -*****-**ou,,,.....,****.. ****-**************-**-*****************-*******---**-******.. *-*-**** ' *~(<_(Z.....,_
......... ~---~-,............................. ~... -----*-*******"********----************-*""'****
....................................................... ___,........................................ -............. 8315 County Road 459 : Steedman, MO 65077 AmerenMissouri.com }\\j
-~ IB,,NRC~06782 December 29, 2022
2022. Also included are "FSAR Change Log" and "TS Bases Change Log" files that provide information on the PSAR Change Notices that were incorporated into PSAR Revision OL-26 and the TS Bases Change Notices that were incorporated into TS Bases Revision 18 respectively.
In connection with this update, and in light of Callaway Plant's renewed Operating License, a review of changes subject to inclusion per 10 CPR 54.3 7(b) was performed for the. period of December :22, 2020, through May 30, 2022: The review did not find any newly identified systems, structures, or components that would have been subject to an aging management review or evaluation of time-.
Ameren Missouri recognizes* that the due date for this submittal per 10 CPR 50. 71 ( e ),.based upon
- startup from Callaway's most recent refueling outage, was November 30, 2022. The discrepancy in submittal timeliness has been entered into the plant's corrective action program.
This letter contains no new commitments. Please contact Mr. Tom Elwood.at 314-225-1905 for any questions you may have regarding this submittal.
I declare under penalty of perjury that the foregoing is true and correct
Sincerely,
Executed on: /Z- 'Z zoz.:z...
Todd A. Witt Manager, Regulatory Affairs
Enclosures:
- 1. CD I -Callaway Licensing Basis Documents-December 27, 2022 -Public/Redacted 2, CD 2-Callaway Licensing Basis I;>ocuments-December 27, 2022-Nonpublic/Unred.acted-Withhold per RIS 2015-17
,-***************......,,.,.,,,,...,,,...,.................,........,...........................,......................_,,...,,,_....................................,.............................,...,...,,...,,............,.... u..,,, *****************************-****oo*U**********.. ****-*******-*.. *******u
,................................................................. -.................................................... 0-4..,...............................................................................................................................................................................,............
- ooo-.o-o***,.... -*******---***oo*,o-*" """"**"********oo"****...,*.. ****.. oo"******"******oo***""****--*...,****oooo*"".. **.,,.. "4*****.. ****---*............................ uO'o*OOo-.*.. *.... *-..oo*.. *-**.. ***.. ***-*.,..,.....
-:~ ULNRC-06782 December 29, 2022 Page 3 of 4
cc: Mr. Scott A. Morris Regional Administrator.
U.S. Nuclear Regulatory Commissiop.*
Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511
Senior Resident Inspector Callaway Resident Office
..8201 NRC Road.. U.S. Nuclear Regulatory Commission
Steedman, MO 65077
Mr. M. Chawla Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08B1A Washington, DC 20555-0001
.......... ****.. ******-*-****-*************.. *.. ********n************************-*"-""****-*****.. *oe-**--**...,**********.. *... *******-***********ao.. ***********---************...,*******.. *-*-*******-**.. ****.. ******.. *-**.. *********.....,*****-*-**---************-*****
................................................... _.......................................... -*-****.. *---*.. ******o-o*****.................................................................................... _..,................................................................................ -.......
,-, ULNRC~06782 December 29, 2022 Page 4 of 4
- Inde:x and send hardcopy to QA File A160,0761
Hardcopy:
Certrec Corporation 6500 West Freeway, Suite 400 Fort Worth, TX 76116 (Certrec receives A:I,L attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following.. can be made via Other Situations ULNRC Distribution:
F.M.Diya B. L. Cox
- D. E. Farnsworth B. L. Jungmann W. A. Witt T. A. Witt T. B. Elwoqd NSRB Secretary STARS Regulatory Affairs Mr. Aaron Schmidt (DNR)
Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)
Ms. Claire Eubanks (Public Service Commission)
--*---****n**.. ***.,.**********.. **********-*******-**********---*-o****-***** *******************-*...,*-***-********* ************-**........,........, ************ *************************-*-**-*********-*******.. ******---**************---****************-*******-*-*********
......................................................................................................................................................................,........................................................................................................................................................