Category:Drawing
MONTHYEARML23062A6282022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 3, Figures ML23067A1272022-12-29029 December 2022 Site Addendum, Chapter 8, Figures ML23067A1242022-12-29029 December 2022 Site Addendum, Chapter 9, Figure 9.2-3, Demineralized Water Makeup System ML23067A1232022-12-29029 December 2022 Site Addendum, Chapter 12, Figures ML23067A1092022-12-29029 December 2022 Site Addendum, Chapter 8, Figure 8.3-1, Site Single Line Diagram ML23062A6542022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Figures ML23062A6522022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 16, Figures ML23062A6472022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 6, Figures ML23062A6392022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 8, Figures ML23062A6342022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 10, Figures ML23062A6322022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 12, Figures ML23062A6292022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 9, Figures ML23062A6272022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 7, Figures ML23062A6262022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 11, Figures ML23062A6252022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Figures ML23062A6212022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Figure 18.2-12, Functional Diagram Reactor Core Subcooling Monitor ML23067A1372022-12-29029 December 2022 Site Addendum, Chapter 2, Figures ML23062A6202022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 4, Figures ML23062A6152022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 2, Figures ML23062A6122022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figures ML23062A6072022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Figure 5.2-2, Primary Coolant Leak Detection Response Time ML21194A3862021-06-22022 June 2021 Revision OL-25 to Final Safety Analysis Report, Chapter 9, Figures ML21195A1772021-06-22022 June 2021 Revision OL-25 to Final Safety Analysis Report, Chapter 10, Figures ML21194A3422021-06-22022 June 2021 Revision OL-25 to Final Safety Analysis Report, Chapter 3, Figures ML21195A2862021-06-22022 June 2021 Revision OL-25 to Final Safety Analysis Report, Chapter 15, Figures ML21195A2882021-06-22022 June 2021 Revision OL-25 to Final Safety Analysis Report, Chapter 18, Figures ML21194A3382021-06-22022 June 2021 Site Addendum, Chapter 2, Figures ML21194A3812021-06-22022 June 2021 Revision OL-25 to Final Safety Analysis Report, Chapter 8, Figures ML21194A3802021-06-22022 June 2021 Revision OL-25 to Final Safety Analysis Report, Chapter 7, Figures ML21194A3782021-06-22022 June 2021 Revision OL-25 to Final Safety Analysis Report, Chapter 6, Figures ML21194A3492021-06-22022 June 2021 Site Addendum, Chapter 13, Figures ML20317A2572020-11-12012 November 2020 Rev. OL-24 to Final Safety Analysis Report, Chapter 1, Figures - Redacted ML20209A0312019-11-13013 November 2019 Rev. OL-24 to Final Safety Analysis Report, Chapter 5, Figures ML20209A0992019-11-13013 November 2019 Rev. OL-24 to Final Safety Analysis Report, Chapter 9, Figures ML20209A0782019-11-13013 November 2019 Site Analysis, Chapter 2, Figures ML20209A0482019-11-13013 November 2019 Rev. OL-24 to Final Safety Analysis Report, Chapter 7, Figures ML20209A0462019-11-13013 November 2019 Rev. OL-24 to Final Safety Analysis Report, Chapter 18, Figures ML20209A0122019-11-13013 November 2019 Rev. OL-24 to Final Safety Analysis Report, Index to NRC Questions and Reponses, Figures ML20209A0162019-11-13013 November 2019 Rev. OL-24 to Final Safety Analysis Report, Chapter 11, Figures ML20209A0242019-11-13013 November 2019 Rev. OL-24 to Final Safety Analysis Report, Chapter 12, Figures ML20209A0252019-11-13013 November 2019 Rev. OL-24 to Final Safety Analysis Report, Chapter 4, Figures ML20209A0262019-11-13013 November 2019 Rev. OL-24 to Final Safety Analysis Report, Chapter 8, Figures ML20209A0282019-11-13013 November 2019 Rev. OL-24 to Final Safety Analysis Report, Chapter 6, Figures ML20209A0382019-11-13013 November 2019 Rev. OL-24 to Final Safety Analysis Report, Chapter 3, Figures ML20209A0412019-11-13013 November 2019 Rev. OL-24 to Final Safety Analysis Report, Chapter 10, Figures ML20209A0452019-11-13013 November 2019 Rev. OL-24 to Final Safety Analysis Report, Chapter 16, Figures ML18207A5722018-06-19019 June 2018 Revision OL-23 to Final Safety Analysis Report, Chapter 11, Figures ML18207A5872018-06-19019 June 2018 Revision OL-23 to Final Safety Analysis Report, Chapter 16, Figures ML18207A5842018-06-19019 June 2018 Revision OL-23 to Final Safety Analysis Report, Chapter 15, Figures ML18207A5492018-06-19019 June 2018 Revision OL-23 to Final Safety Analysis Report, Chapter 2.0, Figures 2.3-1 Through 2.5-7 2022-12-29
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23318A1082023-12-28028 December 2023 FSAR Chapter 1, Figures Redacted ULNRC-06822, FSAR Markup for FSAR Site Addendum (SA) Sections 13.1.3.1, 13.1.3.1.18, and 13.1.3.1.192023-06-14014 June 2023 FSAR Markup for FSAR Site Addendum (SA) Sections 13.1.3.1, 13.1.3.1.18, and 13.1.3.1.19 ML23062A6062022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 8, Electric Power ML23062A6072022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Figure 5.2-2, Primary Coolant Leak Detection Response Time ML23062A6082022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Figures ML23062A6092022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23062A6112022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Sections ML23062A6122022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figures ML23062A6132022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Tables ML23062A6152022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 2, Figures ML23062A6162022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-1, Revision 17, Nuclear Power and DNBR Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6172022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 14, Initial Test Program ML23062A6182022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23062A6192022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, General Table of Contents ML23062A6202022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 4, Figures ML23062A6212022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Figure 18.2-12, Functional Diagram Reactor Core Subcooling Monitor ML23062A6222022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23062A6232022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Index to NRC Questions and Responses ML23062A6242022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 19, License Renewal Supplement ML23062A6252022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Figures ML23062A6262022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 11, Figures ML23062A6272022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 7, Figures ML23062A6282022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 3, Figures ML23062A6292022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 9, Figures ML23062A6302022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 2, Site Characteristics ML23062A6312022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 4, Reactor ML23062A6322022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 12, Figures ML23062A6332022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23062A6342022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 10, Figures ML23062A6352022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Accident Analysis ML23062A6362022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23062A6372022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Change Notice Log ML23062A6382022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Figures ML23062A6392022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 8, Figures ML23062A6402022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant ML23062A6412022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 12, Radiation Protection ML23062A6422022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23062A6432022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-2, Revision 17, Pressurizer Pressure and Vessel Average Temperature Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6442022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML23062A6452022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23062A6472022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 6, Figures ML23062A6502022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Clarification of TMI Action Plan Requirements ML23062A6512022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 16, Technical Requirements ML23062A6522022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 16, Figures ML23062A6532022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 17, Quality Assurance ML23062A6542022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Figures ML23062A6492022-12-29029 December 2022 Submittal of Revision OL-26 to Final Safety Analysis Report and Revision 18 to Technical Specification Bases ML22335A5102022-12-0101 December 2022 Attachment 1 - Proposed FSAR Change (Markups) ML21348A7492021-12-16016 December 2021 FSAR Revision 25 Chapter 1 Figures Redacted ML21335A4582021-12-0101 December 2021 Enclosure 6: Proposed Final Safety Analysis Report Changes (Mark-up - for Info Only) 2023-06-14
[Table view] |
Text
j
TO CONTAINMENT t t
SEE NOTE 1
REACTOR VESSEL HEAD
NOTES:
- 1. EXISTING VENT LINE
CALLAWAY PLANT
FIGURE 18.2-1 REACTOR HEAD VENT SYSTEM
REV. 15 5/15 FSAR Figure 18.2-2 is withheld per RIS 2015-17
REVOL-8 11/95
CALLAWAY PLANT
FIGURE 18.2-2 FSAR Figure 18.2-2 is withheld per RIS 2015-17 POST-ACCIDENT RADIATION ZONES ELEVATION 1974' FSAR Figure 18.2-3 is withheld per RIS 2015-17
Rev. OL-0 6/86 CALLAWAY PLANT
FIGURE 18.2-3 FSAR Figure 18.2-3 is withheld per RIS 2015-17 POST-ACCIDENT RADIATION ZONES ELEVATION 1988' FSAR Figure 18.2-4 is withheld per RIS 2015-17
REV OL-11 5/00 CALLAWAY PLANT
FIGURE 18.2-4 FSAR Figure 18.2-4 is withheld per RIS 2015-17 POST-ACCIDENT RADIATION ZONES ELEVATION 2000' FSAR Figure 18.2-5 is withheld per RIS 2015-17
Rev. OL-0 6/86 CALLAWAY PLANT
FIGURE 18.2..S FSAR Figure 18.2-5 is withheld per RIS 2015-17 POST-ACCIDENT RADIATION ZONES ELEVATION 2026' FSAR Figure 18.2-6 is withheld per RIS 2015-17
REV. OL-10 11/98 CALLAWAY PLANT FSAR Figure 18.2-6 is withheld per RIS 2015-17 FIGURE 18.2-6
POST-ACCIDENT RADIATION ZONES ELEVATION 2047'-6" FSAR Figure 18.2-7 is withheld per RIS 2015-17
REVOL-12 11/01 CALLAWAY PLANT
FIGURE 18.2-7 POST-ACCTDENT RADIATION ZONE'S CONTROL BLIXi. &
COMMUNICATION CORRIDOR ELEVATIONS 1974' & 1984'
FSAR Figure 18.2-7 is withheld per RIS 2015-17 FSAR Figure 18.2-8 is withheld per RIS 2015-17
Rev. OL-0 6/86 CALLAWAY PLANT
FIGURE 18.2-8 POST-ACCIDENT RADIATION ZONES CONTROL & DIESEL GENERATOR BUILDINGS AND COMMUNICATION CORRIDOR ELEVATIONS 2000' & 2016'
FSAR Figure 18.2-8 is withheld per RIS 2015-17 FSAR Figure 18.2-9 is withheld per RIS 2015-17
CALLAWAY PLANT POST*ACCIDENT RADIATION ZONES FIGURE 18.2-9 CONTROL & DIESEL GENERATOR ANO COMMUNICATION CORRIDOR BUILDINGS
ELEVATIONS 2032' & 2047'-6" REVOL-11 5/00
FSAR Figure 18.2-9 is withheld per RIS 2015-17 100....-----------.---------"""T""---------r----------.---------
0
w I
<(
er:
w (f) 0 0
10*6.__ _______ _,J. ________ -..L. ________....__ _______ __J ________....J 10*1 101 102 103 104 TIME (HOURS) Rev. OL-0 6/86 CALLAWAY PLANT
FIGURE 18.2-10
NORMALIZED DOSE RATE DECAY CURVE FOR AIRBORNE SOURCE (SOURCE A) 10° ----------,,----------"T-----------.---------,-----------,
0 *
! 10-1 f-
<(
UJ.....,,.....
()
a:.....,
UJ :::.:>
0 f-Cl) ----.....
<( (/)...... _
a: () ----.....
UJ f-Cl) z 10-2 -- -- ---
0 UJ Cl ()
a:
UJ a..
UJ
~
a:
UJ Cl) 0 10- 3 0
0 i==
<(
a:
1 o-4 '---------___,J'--- _______ __._ ________ __._ ________ _._ _______ ______
10*1 102 103 104 LEGEND: TIME (HOURS) Rev. OL-0 1 PERCENT Cs SOURCE 6/86
- - - - 50 PERCENT Cs SOURCE CALLAWAY PLANT
FIGURE 18.2-11 NORMALIZED DOSE RATE DECAY CURVES FOR SUMP SOURCE (SOURCE C) WITH 1 PERCENT Cs AND 50 PERCENT Cs TERM IN ATION 1-----------+ ----- -1 MARGIN DI SPLAY MCB SATURATION BOARDS BB TI1390A
DISPLAY BBUU' 390A P3 2 TCOLD TEMP SIGNA LS P1 & P2 2 THO T TEMP SIGNA LS REACTOR TR I P BREAKER PC NODE BOX
REF ERENC E T/C S I GNALS MED I A RU101 TIC JUNCTION ALS I CONVERTER Non-Class 1E BOX RTD S I GNALS TC/CCM RACK ~ _ B~X! 1 _:~ ~ _________ i l ___ I ANNUNCIATOR OUTPUTS
ALTERNATE CET Class 1E INDICATIONS BBE l1 390A 1E 120VAC TCCM CONSOLE RP081A
TRAIN A
TERMINATION>---------+- -- MARG I N DISPLAY MCB SATURA TIO N BOARDS BB T I 1390B
BBUU I 390B DISPLAY
P3 P1 & P2 2 TCOLD TE MP SIGNALS 2 THO T TEMP SIGNALS REACTOR TR I P BREAKER PC NOD E BOX
REFERENCE T/C SIGNALS ALS Non-Class 1E JUNC TION BOX RTD SIGNALS TC/CCM RACK
PO WER I NPUT PANEL Class 1E ALTER NA TE CET I ND I CA TIO NS BBE I 1390B 1E 120VAC TCCM CO NSO LE RP08 1B
TRAIN B
Notes :
- 1. P1 is a w ide range loop p ressure. CALLAWAY PLANT 2. P2 and P3 are narrow range pressur izer pressures. FIGURE 18.2-12
- 3. Material type for T / C is shown below. Type K extension wire ii mineral insulated chromel/olwnei wire.
FUNCTIONAL DIAGRAM
~ Chrome ! REACTORCORE SUBCOOLING MONITOR
~ Alumel REV. OL-26 11/22 l
RVLIS HEAD ~--
PENETRATION
OUTLET OUTLET
WIDE RANGE NARROW RANGE
MOVABLE DETECTOR CONDUIT
TRAIN A TRAIN B
CALLAWAY PLANT
FIGURE 18.2-13
REACTOR VESSEL LEVEL INSTRUMENTATION SYSTEM REV. 1 5/15 100
90
80
NO PORV ACTUATION 70 (REACTOR TRIP DUE TO P-9)
~ 60 a:
w s:
0 Q. 50 a:
0 I-u PORV ACTUATED
<(
w 40 a:
30
20 NO PORV ACTUATION (SPRAY ADEQUATE TO CONTROL OVERPRESSURE)
10
BOL MOL EOL Rev. OL-0 CORE HISTORY 6/86 CALLAWAY PLANT
FIGURE 18.2-14
PORV OPENING BAND - TURBINE TRIP WITH CONDENSER UNAVAILABLE 8 7 6 5 4 3 2 1
<Olvorszz-v-i REV. DATE DRAWN 2 9/3/91 SBR B [D B0 CHKD. SUPV. APPD. RLW T JM N/A
~ ~ REDRAWN FOR I yo11 ~ ~~ I 129 11 CLARITY 0----L [1]~ I I REV. DATE DRAWN 3 101 095 DLBc I CIS-A L A BCB BCD I cis-A2-1) BCB BCD CHKD. SUPV. APPD.
Q yo11~ I CLOSESC-y RLW AMR N/A L. C. I CLOSES I.,..------..,,.,..-------..,. 1 II INCORP. H
\\~4~,?,4) I rzs ~ ~ 1" I ~ J TEST _ ZS r---..+--..14--] TEST RFR-16448 LOOP 3 HOT u;u__s__I__N__G l_SJ - -\\1_2_8, I 0 V106 V107 1 CONN. 129 0 JN....... CONN. V108 V109 REV. DATE DRAWN
LEG SAMPLE 1-4 010396 RLW 0 I NOTE 9 I ~ L 021-BCB-1" 021-BCB-1" ~ CHKD. SUPV. APPD.
> M - 2 2 BB O 1 >- - - C0'.1_.l-,.----,---'V'--------.-----f I E-4 I ' '. ' ' DLBc AMR NIA I B-7 I F. C. BB-V046 T DE~AY I COIL V102 F.C. F.C. V103 V100 RFR-1651 DA. INCORP.
I 021 -BCB-1 "
~ TUBING I NOTE 9 l-~1 ---~ 6 PLCS. I I BCB REV. DATE DRAWN IE-41 TUBING aJ V104 VIOS 5 112697 RLW TUBING u CHKD. SUPV. APPD.
aJ I.c-:--.:r. ~ 1 l-... eillllf--.. ~-] TEST CONN. DLBc AMR N/A N - & VENT INCORP.
0 BCB BCD NOTES: DEC-1478 REV. DATE DRAWN Gv-----L-~
- V101 1. SEE DRAWING M-22SJ01 FOR NOTES. 6 072501 RLW CHKD. SUPY. APP.
ZS yo11~ V894 ~ 0CD -[1]-0--1 m - EWM AMR N/A I 20 ?,20) ' ' J~ I w " INCORP.
r I RFR-21026A.
'. "'00 D U REV. DATE DRAWN LIQUID SAMPLE "V PRESSURIZER l.,l;UBING l_SJ V8931 X l \\!2§/011 I I I TO HV-21 z - 7 080502 SKC
'. ' V070
~ 1,,
> M-226602 >- - -toQ::: __,f---;,-"v-/'-7-Q-.. (-:J---__:lc::N~IOE~T";E4~)9:.C1L_ __ L_ _ __J I 6 o 11 021-BCB-1" -. 021 -BCB-1 11 - -----2 M-22EJ01 IE -7 I CHKD. SUPY. APP. DJB TWS N/A G CONN.. TEST~,---.., ~ ~
I A-71 COIL BB-V112 DELAY I F.C. I ~ F.C. I NOTE 19 I-INCORP.
0 MP Ol-1002A u
aJ I PARTIAL I I cis-A2-1)
I NOTE 9 1-~---~ I CLOSES I REV. DATE DRAWN I E-4 I TUBING TUBING \\(1/ aJ u V069 ( L.c.1_q ~ 8 082102 RLW aJ.,.-----...,..,..-------..,, 1 " BCB TUBING CHKD. SUPY. APP.
s ::) r----l*t-----l*t---] TEST CONN. EWM AMR N/A VOSS V056 MP 01-1002A INCDRP.
001-BCB-1" 001-BCB-1".c=-::,, * 'f--~0~0~1~-~B~C~B_-~1_"_---,-[]-_:_1~"xc:__3~~~" _______ __:_:IN~O~T~E~9~1 _______ __J IPARTIALI 0----L [4_]~ "-..i 1 (C-4) V054 VI 1 6 REV. DATE DRAWN 9 082702 RLW I ZS y 11~ CHKD. SUPY. APP.
~
3 ~,"3") co I 8-L_~Is BW~ TWS N/A u Q 133 011~ INCORP.
LOOP 1 HOT IJ;UBING s L co I \\i"3°3. I,133) MP 01-1002A LEG SAMPLE m IPARTIALI N REV. DATE DRAWN
) M-226B01 >- - - Ccx:'.f~, ~ 'v' I I NOTE 9 I 0 ~ 0 NUCLEAR 10 091302 RLW BB-V007 DELAY F. C. IE-41 V053 I -F.C. "'/ SAMPLE STATION CHKD. SUPY. APP.
I G-4 I COIL 1 "x 3,,,, EWM TWS N/A 1,,,---..,,---..,. 1 "x 3/a" \\_ ~ ~~~~SIJ01 INCORP.
( NOTE 9 )-~; ____ ~ TEST CONN. ~--I. '.... ' 001-BCB-1" I F. C. MP 01-1002A F IE-41 voos & VENT V007 en u IPARTIALI aJ I -m&-1 BCB TUBING REV. DATE
--t---- I NOTE 9 I 11 1 00202 BCD BCB 0 J~ I I C-4 I DRAWN CHKD. SUPV.
0 RLW EWM TWS TUBING TUBING ~011 I INCORPORATE
~ I I TD HV-22 ------2 M-22EJ01 MP 01-1002A 001 -BCB-1" ID-7 I I PARTIAL I F. C. REV. DATE I NOTE 1 9 I I 2 103102 DRAWN CHKD. SUPV. RLW MAL DLB
MP 01-1002A INCORPORATE I PARTIAL I REV. DATE I 3 111 002
DRAWN CHKD. SUPV. EWM DJB JDW
MP 01-1002A. INCORPORATE
REV. DATE 1 4 041905 DRAWN CHKD. SUPV. MAL RLW TWS E
INCORP.
RFR 22941A
D
C
B
~--1" S.W. CAP---~
~24-~
L* -J
BCB BCB
AS-BUILT CLASS 1
DRAWN (DATE I N/A PIPING AND A
CHKD. WA TE J INSTRUMENTATION DIAGRAM
~,=upv_.N_IA_,=oAT~El NUCLEAR SAMPLIN_Q_ SYSTEM N/A l FSAR FIGURE 18.2 15.T"'"'I APPD. (DATEJ LOCATION CLASS N/A CALLAWAY PLANT A 4\\
UNION ELECTRIC COMPANY ST. LOUIS, MO M-22SJ04(0) REV.
1 4 8 7 6 5 f 4 3 2 1