Text

CALLAWAY - SP

TABLE OF CONTENTS

CHAPTER 17.0

QUALITY ASSURANCE

Section Page

17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION........... 17.0-1

17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE.................. 17.0-1

17.0-i CALLAWAY - SP

CHAPTER 17.0

QUALITY ASSURANCE

17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION

This section is not applicable to an FSAR.

17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE

The Operational Quality Assurance Program for the Union Electric Company's Callaway Plant is described in the Operational Quality Assurance Manual (OQAM). The Quality Assurance Program description, formerly maintained in this section of the FSAR, is now maintained in the OQAM as a separate licensing document. The OQAM will be maintained in accordance with the requirements of 10 CFR 50.54.

17.0-1 Rev. OL-13 5/03