Category:Quality Assurance Program
MONTHYEARULNRC-06822, FSAR Markup for FSAR Site Addendum (SA) Sections 13.1.3.1, 13.1.3.1.18, and 13.1.3.1.192023-06-14014 June 2023 FSAR Markup for FSAR Site Addendum (SA) Sections 13.1.3.1, 13.1.3.1.18, and 13.1.3.1.19 ML23156A6722023-06-0505 June 2023 Quality Assurance Program Section 2 Markup ML23156A6732023-06-0505 June 2023 Quality Assurance Program Appendix a Markup ML23062A6532022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 17, Quality Assurance ML23067A1352022-12-29029 December 2022 Site Addendum, Chapter 17, Quality Assurance ULNRC-06588, Proposed Revision to Operating Quality Assurance Manual (Rev. 34b)2020-07-0808 July 2020 Proposed Revision to Operating Quality Assurance Manual (Rev. 34b) ULNRC-06562, Operating Quality Assurance Manual (Oqam) Interim Revision 34a2020-01-23023 January 2020 Operating Quality Assurance Manual (Oqam) Interim Revision 34a ULNRC-06539, Operating Quality Assurance Manual, Revision 342019-10-24024 October 2019 Operating Quality Assurance Manual, Revision 34 ML19302G4272019-10-24024 October 2019 Operating Quality Assurance Manual (Oqam) Revision 33a Mark-up, Identifying Changes Through the Use of Strikeovers and Inserts ML19302G4282019-10-24024 October 2019 Updated Pages Which Constitute Operating Quality Assurance Manual (Oqam) Revision 34 ML18164A0892018-06-11011 June 2018 Attachment 1 to ULNRC-06443, Operating Quality Assurance Manual (Oqam), Revision 33, Description and Justification for Changes ML18164A0922018-06-11011 June 2018 Attachment 3, Updated Pages Which Constitute Oqam, Revision 33 ULNRC-06327, Operating Quality Assurance Manual (Oqam) Revision 322016-09-28028 September 2016 Operating Quality Assurance Manual (Oqam) Revision 32 ML16089A1672016-04-0101 April 2016 Review and Approval of Quality Assurance Plan Change Per Nuclear Energy Institute (NEI) 14-05A, Revision 1 ML15035A2742015-02-0404 February 2015 Operating Quality Assurance Manual, Rev. 031 ML15035A2732015-02-0404 February 2015 Operating Quality Assurance Manual, Rev. 030c ULNRC-06177, Callaway Nuclear Plant - Operating Quality Assurance Manual, Rev. 030c2015-02-0404 February 2015 Callaway Nuclear Plant - Operating Quality Assurance Manual, Rev. 030c ULNRC-06177, Callaway Nuclear Plant - Operating Quality Assurance Manual, Rev. 0312015-02-0404 February 2015 Callaway Nuclear Plant - Operating Quality Assurance Manual, Rev. 031 ULNRC-06051, Callaway, Unit 1, Operating Quality Assurance Manual (Oqam) Revision 302013-10-29029 October 2013 Callaway, Unit 1, Operating Quality Assurance Manual (Oqam) Revision 30 ULNRC-06051, Operating Quality Assurance Manual (Oqam) Revision 302013-10-29029 October 2013 Operating Quality Assurance Manual (Oqam) Revision 30 ULNRC-06051, Callaway, Unit 1, Attachment 2 to ULNRC-06051, Operating Quality Assurance Manual (Oqam), Revision 302013-10-28028 October 2013 Callaway, Unit 1, Attachment 2 to ULNRC-06051, Operating Quality Assurance Manual (Oqam), Revision 30 ML13303B6882013-10-28028 October 2013 Attachment 2 to ULNRC-06051, Operating Quality Assurance Manual (Oqam), Revision 30 ULNRC-05961, Re-Transmittal of Operating Quality Assurance Manual, Revision 24 (Superseded) Submittal2013-02-20020 February 2013 Re-Transmittal of Operating Quality Assurance Manual, Revision 24 (Superseded) Submittal ML12150A1712012-05-25025 May 2012 Attachment 2 to ULNRC-05852, Operating Quality Assurance Manual (Oqam), Revision 29 ML13303B6892012-05-25025 May 2012 Attachment 3 to ULNRC-06051, Oqam Revision 29 mark-up, Identifying Changes Through the Use of Strikeovers and Inserts ML0915400992009-05-13013 May 2009 Callaway - Operating Quality Assurance Manual (Oqam), Rev. 027 ULNRC-05615, Callaway - Operating Quality Assurance Manual (Oqam), Rev. 0272009-05-13013 May 2009 Callaway - Operating Quality Assurance Manual (Oqam), Rev. 027 ULNRC-05615, Operating Quality Assurance Manual (Oqam), Rev. 0262008-07-0303 July 2008 Operating Quality Assurance Manual (Oqam), Rev. 026 ULNRC-05473, Operating Quality Assurance Manual (Oqam), Revision 262008-07-0303 July 2008 Operating Quality Assurance Manual (Oqam), Revision 26 ML0631201322006-10-30030 October 2006 Operating Quality Assurance Manual (Oqam), Revision 25 ML0502501422005-01-10010 January 2005 Transmittal of Quality Assurance Manuals Oqam 04-004 & 04-005 ULNRC-04943, Quality Assurance Program for Packaging and Transportation of Radioactive Materials2004-01-30030 January 2004 Quality Assurance Program for Packaging and Transportation of Radioactive Materials ULNRC-04844, Operating Quality Assurance Manual, Revision 232003-05-20020 May 2003 Operating Quality Assurance Manual, Revision 23 2023-06-05
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23318A1082023-12-28028 December 2023 FSAR Chapter 1, Figures Redacted ULNRC-06822, FSAR Markup for FSAR Site Addendum (SA) Sections 13.1.3.1, 13.1.3.1.18, and 13.1.3.1.192023-06-14014 June 2023 FSAR Markup for FSAR Site Addendum (SA) Sections 13.1.3.1, 13.1.3.1.18, and 13.1.3.1.19 ML23062A6062022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 8, Electric Power ML23062A6072022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Figure 5.2-2, Primary Coolant Leak Detection Response Time ML23062A6082022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Figures ML23062A6092022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23062A6112022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Sections ML23062A6122022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figures ML23062A6132022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Tables ML23062A6152022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 2, Figures ML23062A6162022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-1, Revision 17, Nuclear Power and DNBR Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6172022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 14, Initial Test Program ML23062A6182022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23062A6192022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, General Table of Contents ML23062A6202022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 4, Figures ML23062A6212022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Figure 18.2-12, Functional Diagram Reactor Core Subcooling Monitor ML23062A6222022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23062A6232022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Index to NRC Questions and Responses ML23062A6242022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 19, License Renewal Supplement ML23062A6252022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Figures ML23062A6262022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 11, Figures ML23062A6272022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 7, Figures ML23062A6282022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 3, Figures ML23062A6292022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 9, Figures ML23062A6302022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 2, Site Characteristics ML23062A6312022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 4, Reactor ML23062A6322022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 12, Figures ML23062A6332022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23062A6342022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 10, Figures ML23062A6352022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Accident Analysis ML23062A6362022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23062A6372022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Change Notice Log ML23062A6382022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Figures ML23062A6392022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 8, Figures ML23062A6402022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant ML23062A6412022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 12, Radiation Protection ML23062A6422022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23062A6432022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-2, Revision 17, Pressurizer Pressure and Vessel Average Temperature Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6442022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML23062A6452022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23062A6472022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 6, Figures ML23062A6502022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Clarification of TMI Action Plan Requirements ML23062A6512022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 16, Technical Requirements ML23062A6522022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 16, Figures ML23062A6532022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 17, Quality Assurance ML23062A6542022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Figures ML23062A6492022-12-29029 December 2022 Submittal of Revision OL-26 to Final Safety Analysis Report and Revision 18 to Technical Specification Bases ML22335A5102022-12-0101 December 2022 Attachment 1 - Proposed FSAR Change (Markups) ML21348A7492021-12-16016 December 2021 FSAR Revision 25 Chapter 1 Figures Redacted ML21335A4582021-12-0101 December 2021 Enclosure 6: Proposed Final Safety Analysis Report Changes (Mark-up - for Info Only) 2023-06-14
[Table view] |