Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20064A71718 September 1990Comments on SALP Board Repts 50-277/89-99 & 50-278/89-99. Author Pledges Continued Mgt Support of & Attention to Rate of Improvement,Achievement of Goals & Performance of Routine Activities
ML18095A48817 September 1990Requests Regional Waiver of Compliance from Tech Spec 3.6.2.3, Containment Cooling Sys. Waiver Requested in Order to Allow Replacement of Containment Fan Cooler Unit Motor #22 W/O Requiring Plant ShutdownShutdown Margin
Probabilistic Risk Assessment
ML20065D44214 September 1990Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. Proposed Schedules for Operator Licensing Exams, Requalification Exams & Generic Fundamental Exams Encl
ML18095A49013 September 1990Provides Supplemental Info Applicable to Clarification of 10CFR50,App R Exemption Request Re Fire Suppression Sys for Panel 335,per NRC RequestExemption Request
ML20064A77513 September 1990Advises That Ba Stambauth No Longer Maintains Need to Hold Senior Operator License
ML20065D37411 September 1990Forwards Rev to Relief Request 10-VRR-2 Re RHR stay-fill Supply Check Valves,Per
ML20059H53910 September 1990Forwards Data Re Bailey Solid State Logic Modules (Sslm) Reliability Program for Period Ending June 1990.Quarterly Summaries of Sslm Data Will Be Provided to End of June 1991
ML20059E6794 September 1990Forwards Security Upgrade Project Status Rept,Per Regulatory Effectiveness Review.Rept Withheld (Ref 10CFR73.21)
ML20059E6824 September 1990Forwards Info Re Temporary Mod to Security Plan Concerning Protected Area.Info Withheld
ML18095A46231 August 1990Provides Revised Response to Generic Ltr 89-13, Svc Water Problems Affecting Safety-Related Equipment. Only HXs Exhibiting Unsatisfactory Test Results Will Be Inspected & Possibly Cleaned
ML18095A46431 August 1990Forwards Revised Response to NRC Bulletin 88-004 Re Potential pump-to-pump Interaction.Util Pursuing Permanent Solution to Issue & Will Implement Appropriate Permanent Field Change by End of Unit 1 10th Refueling Outage
ML20059F05431 August 1990Responds to NRC Re Violations Noted in Safety Insp Repts 50-277/90-13 & 50-278/90-13.Corrective Actions: Training Will Be Provided for Personnel Re Requirements of Drawing E1317 & Administrative Procedures A-2 & A-6
ML18095A44330 August 1990Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept,Jan-June 1990 & Rev 6 to Odcm.Offsite Dose Calculation Manual
ML18095A45330 August 1990Forwards RERR-28, Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Revised Odcm.W/O Revised ODCMOffsite Dose Calculation Manual
ML20059E70230 August 1990Forwards RERR-9, Hope Creek Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Rev 11 to Odcm.Summary of Change to ODCM & Rationale Provided in Part G of RERR-9.W/o Rev 11 to ODCM
ML20059D25330 August 1990Forwards Hope Creek Generating Station Semiannual Radioactive Effluent Release Rept RERR-9 for Jan-June 1990 & Rev 11 to ODCM for Hope Creek Generating Station
ML18095A43929 August 1990Forwards Semiannual Rept Re fitness-for-duty Performance Data for 6-month Period Ending 900630,per 10CFR26.71(d).Rept Includes Testing Results,Random Testing Program Results & Confirmed Positive Tests for Specific SubstancesFitness for Duty
ML18095A44228 August 1990Clarifies 900710 Request for Amends to Licenses DPR-70 & DPR-75,changing Sections I & M.Under Proposed Change,Section I Should Be Changed to Read Section 2.J for License DPR-70 & Section M Changed to Read Section 2.N for License DPR-75
ML20028G81827 August 1990Forwards Peach Bottom Atomic Power Station Semiannual Effluent Release Rept,Jan-June 1990. No Revs Made to ODCM During Rept Period
ML20059D21927 August 1990Provides Change to Schedule for Implementing Generic Ltr 88-11.Revised pressure-temp Curves Will Be Submitted Prior to Completion of Second Refueling Outage.Existing pressure- Temp Curves Conservative to 32 EFPY
ML20059D24924 August 1990Requests Regional Waiver of Compliance from Tech Specs 4.0.3 & 4.8.1.1.2.f.2.Waiver Allows Sufficient Time to Perform Surveillance Requirement W/O Requiring Unit Shutdown.Request Involves No Irreversible Environ Consequencies
ML20059C30524 August 1990Notifies of Minor Structural Enhancements to Spent Fuel Racks Issued by Util 891101 Proposed Change to Tech Spec 5.6.3
ML20059B66122 August 1990Confirms That 10 Anchor/Darling Model S350W Swing Check Valves Installed at Plant,Per NRC Bulletin 89-002.All 18 Valves Inspected & Retaining Block Studs Replaced W/Upgraded Matl.No Crack Noted on Any Studs Which Were ReplacedAnchor Darling
ML20059C28621 August 1990Provides Correction to 900810 Response to Request for Addl Info Re Util Request for Restatement of OL Expiration Dates
ML20059A64615 August 1990Responds to Violation Noted in Insp Repts 50-277/90-200, 50-278/90-200,50-277/90-06 & 50-278/90-06 & Payment of Civil Penalty in Amount of $75,000.Corrective Actions:Emergency Svc Water Sys Restored to Operable StatusUnanalyzed Condition
Condition Adverse to Quality
ML18095A41510 August 1990Forwards Response to Request for Addl Info Re Reinstatement of OL Expiration Dates Based on Original Issuance of Ols. Advises That Correct Expiration Date for OL Proposed to Be 200418NJPDES
Biofouling
ML18095A4099 August 1990Forwards Responses to NRC Comments Re Plant Simulator Certification for 10CFR55.45(b)(2),per 891228 LtrBoric Acid
Shutdown Margin
Loop seal
Fire Barrier
Stroke time
Locked High Radiation Area
Missed surveillance
Fire Watch
Power change
ML20058N1999 August 1990Advises of Change of Address for Correspondence Re Util Operations.All Incoming Correspondence Must Be Directed to One of Listed Addresses
ML18095A4068 August 1990Forwards Corrected marked-up Pages for Tech Spec Table 3.3-11 Re Subcooling Margin Monitor & Reactor Vessel Level Instrumentation Sys,Per 900223 Ltr.Administrative Changes Made as Indicated
ML20058Q4056 August 1990Forwards Public Version of Revised Emergency Response Procedures,Including Rev 12 to ERP-140,App 2,Rev 13 to ERP-140,App 3,Rev 4 to ERP-230,Rev 3 to ERP-305 & Rev 3 to ERP-660
ML20058M6633 August 1990Responds to NRC 890406 Integrated Assessment Team Insp Repts 50-277/89-81 & 50-278/89-81.Based on Encl Schedule,Overall Projected Implementation Date Will Be 901119
ML20056A9613 August 1990Notifies That Be Saxman Terminated Employment & Operating Responsibilities W/Util on 900706
ML18095A38630 July 1990Forwards Listing of Station Blackout Major Audit Items Resolution Scope,Per Station Blackout Schedule Commitment
ML20081E15830 July 1990Forwards List of 1990 QA Program Changes for Plant.List Identifies Page & Paragraph Number,Brief Description & Type of Change
ML20056A04227 July 1990Forwards Updated Human Resource Status Rept for Jan-Jul 1990 for Areas Identified in Integrated Assessment Team Insp Repts 50-277/89-81 & 50-278/89-81
ML18095A36626 July 1990Forwards Decommissioning Repts for Hope Creek,Peach Bottom & Salem Nuclear Generating Stations
ML18095A37626 July 1990Forwards Decommissioning Repts & Certification of Financial Assurance for Plants
ML18095A37224 July 1990Forwards Rept & Certification of Financial Assurance for Decommissioning for Plants,Per 10CFR50.75
ML20055H83320 July 1990Submits Change of Addresses for Correspondence Re Util Nuclear Operations
ML18095A36118 July 1990Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount.
ML18095A36218 July 1990Forwards Corrected Tech Spec Page 3/4 3-5 for License Change Request 89-12 Submitted on 891227 & 900521
ML18095A37418 July 1990Provides Supplemental Info Re Facility sub-cooling Margin Monitor
ML18095A37518 July 1990Provides Status of Commitments Made to NRC by Util in 900109 Ltr Re NUREG-0737,Item II.D.1,per 900628 Telcon
ML20055G15717 July 1990Requests Waiver of Compliance from Tech Spec 6.3.1 Re Requirement That Facility General Manager (Gm) Hold Senior Operator License.Waiver Will Temporarily Allow Individual to Fill Position While Gm Attends off-site Mgt Program
ML18095A35913 July 1990Corrects Typo in 900702 Response to Generic Ltr 90-04 Re Schedule for Completion of Remaining Open Items
ML20044B26212 July 1990Forwards Annual Progress Rept on Implementation of Control Room Enhancements,Per NUREG-0737.Corrective Actions for All Priority 1 Human Engineering Discrepancies Completed for Unit.Remaining Priority 2 Discrepancies Under Reevaluation
ML18095A34711 July 1990Responds to NRC 900611 Ltr Re Violations Noted in Insp Repts 50-272/90-14 & 50-311/90-14.Corrective Actions:Directive from Radiation Protection Mgt to All Radiation Protection Personnel Issued Re Control of Compliance Agreement Sheets
ML20055G54811 July 1990Forwards Public Version of Revised Epips,Including Rev 12 to ERP-140,App 3 & Revs 3 to ERP-310 & ERP-317
ML20055G47211 July 1990Requests Extension Until Sept 1990 to Submit Level 1 Analysis,Per Generic Ltr 88-20 Re Individual Plant Exam Completion
ML18095A34510 July 1990Forwards Addl Info Re License Change Request 89-03 Re Reactor Trip Sys Instrumentation