Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20059H53910 September 1990Forwards Data Re Bailey Solid State Logic Modules (Sslm) Reliability Program for Period Ending June 1990.Quarterly Summaries of Sslm Data Will Be Provided to End of June 1991
ML20059E6824 September 1990Forwards Info Re Temporary Mod to Security Plan Concerning Protected Area.Info Withheld
ML20059E6794 September 1990Forwards Security Upgrade Project Status Rept,Per Regulatory Effectiveness Review.Rept Withheld (Ref 10CFR73.21)
ML20059E70230 August 1990Forwards RERR-9, Hope Creek Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Rev 11 to Odcm.Summary of Change to ODCM & Rationale Provided in Part G of RERR-9.W/o Rev 11 to ODCM
ML20059D25330 August 1990Forwards Hope Creek Generating Station Semiannual Radioactive Effluent Release Rept RERR-9 for Jan-June 1990 & Rev 11 to ODCM for Hope Creek Generating Station
ML18095A43929 August 1990Forwards Semiannual Rept Re fitness-for-duty Performance Data for 6-month Period Ending 900630,per 10CFR26.71(d).Rept Includes Testing Results,Random Testing Program Results & Confirmed Positive Tests for Specific SubstancesFitness for Duty
ML20059D21927 August 1990Provides Change to Schedule for Implementing Generic Ltr 88-11.Revised pressure-temp Curves Will Be Submitted Prior to Completion of Second Refueling Outage.Existing pressure- Temp Curves Conservative to 32 EFPY
ML20059D24924 August 1990Requests Regional Waiver of Compliance from Tech Specs 4.0.3 & 4.8.1.1.2.f.2.Waiver Allows Sufficient Time to Perform Surveillance Requirement W/O Requiring Unit Shutdown.Request Involves No Irreversible Environ Consequencies
ML20059C30524 August 1990Notifies of Minor Structural Enhancements to Spent Fuel Racks Issued by Util 891101 Proposed Change to Tech Spec 5.6.3
ML18095A38630 July 1990Forwards Listing of Station Blackout Major Audit Items Resolution Scope,Per Station Blackout Schedule Commitment
ML18095A36626 July 1990Forwards Decommissioning Repts for Hope Creek,Peach Bottom & Salem Nuclear Generating Stations
ML18095A37224 July 1990Forwards Rept & Certification of Financial Assurance for Decommissioning for Plants,Per 10CFR50.75
ML18095A36118 July 1990Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount.
ML20055G15717 July 1990Requests Waiver of Compliance from Tech Spec 6.3.1 Re Requirement That Facility General Manager (Gm) Hold Senior Operator License.Waiver Will Temporarily Allow Individual to Fill Position While Gm Attends off-site Mgt Program
ML18095A35913 July 1990Corrects Typo in 900702 Response to Generic Ltr 90-04 Re Schedule for Completion of Remaining Open Items
ML20055G47211 July 1990Requests Extension Until Sept 1990 to Submit Level 1 Analysis,Per Generic Ltr 88-20 Re Individual Plant Exam Completion
ML20055E5183 July 1990Suppls Request for Noncode Temporary Repair of Svc Water Sys.Ultrasonic Exam of Area Surrounding Patch Will Include Samples,In Accessible Areas,Out to Diameter of 14 Inches
ML18095A3302 July 1990Responds to Generic Ltr 90-04 Re Status of Licensee Implementation of Generic Safety Issues.Table Describing Status of Generic Safety Issue Implementation EnclScram Discharge Volume
ML18095A32328 June 1990Responds to NRC 900518 Ltr Re Violations Noted in Insp Repts 50-272/90-10,50-311/90-10 & 50-354/90-07.Two Noncited Violations Disputed.Util fitness-for-duty Program Exceeds Part 26 Requirements for Positive Blood Alcohol Limits
ML18095A32126 June 1990Requests 30-day Extension Until 900730 to Provide Completion Schedule to Resolve Audit Findings Re Station Blackout
ML20055D03526 June 1990Forwards Addl Info Re Svc Water Sys Noncode Temporary Repair,Per 900621 Application.Util Will Perform Ultrasonic Testing of Pipe Wall Adjacent to Fillet Weld Repair & on Patch.Insps Will Be Performed at 90-day IntervalsSafe Shutdown
Ultimate heat sink
ML20044A62521 June 1990Requests Approval of Temporary Noncode Repair of ASME Code Class III Piping Flaw.Flaw Located in 30-inch Diameter Moderate Energy Svc Water Line.Svc Water Sys Will Be Evaluated for Other Flaws,Per Generic Ltr 90-05Ultimate heat sink
ML20043F33031 May 1990Advises That Contrary to 891223 Commitment,Testing Procedures to Demonstrate Full Safety Function Flow for Certain Check Valves Have Not Been Revised.Failure to Comply to Commitment Due to Administrative Error
ML20043B36322 May 1990Forwards Revised Response to Request for Addl Info Re Bailey Solid State Logic Module (Sslm) Reliability for 1988 & 1989. Criteria Used to Monitor & Trend Bailey Model 862 Sslm Failure Rates Described in 900419 Ltr Modified
ML20043B72321 May 1990Forwards Revised Page 8 to Semiannual Radioactive Effluent Release Rept Forwarded on 900228.LER Being Prepared to Provide Details Re Liquid Radioactive Effluent Release Monitor Out of Svc for Greater than 30 Days
ML18095A22616 May 1990Forwards 1989 Annual Financial Repts of Pse&G,Atlantic City Electric Co,Delmarva Power & Light Co & Philadelphia Electric Co
ML20043A12214 May 1990Forwards Monthly Operating Rept for Apr 1990 & Corrected Mar 1990 Rept for Hope Creek Generating Station,Unit 1
ML20042G65210 May 1990Forwards Attachment 1,Plan Figure 4i for Incorporation Into Security Plan,Per 900212 Commitment.Encl Withheld (Ref 10CFR73.21)
ML20042F9134 May 1990Responds to Generic Ltr 89-19 Re Resolution of USI A-47 on Overfill Protection for Steam Generators in PWRs & Reactor Vessels in Bwrs.Operability of Overfill Protection Sys Assured by Performing Channel Checks Every 12 HReactor Vessel Water Level
ML20042F12730 April 1990Advises of Change to Licensing Basis Commitment Re High/Low Pressure Interface Valves,Per 10CFR50.59.Util Intends to Restore Electric Power to Solenoid Operated Pilot Valves Associated W/High/Low Pressure Interfacing Sys
ML18094B44530 April 1990Responds to 900404 Request Re Station Blackout.Licensee Presently Reconstituting Station Blackout Project Team in Order to Fully Assess Third Party Audit Findings & Establish Scope & Schedule for Rework Activities
ML20042F13127 April 1990Provides Required Certification for Rev 2 to Updated FSAR for Hope Creek Generating Station.Through Administrative Oversight,Std Affidavit Transmitted in Lieu of Required Certification
ML18094B42717 April 1990Forwards Policy Statement on fitness-for-duty,in Response to Insp Repts 50-272/90-10,30-311/90-10 & 50-354/90-07.Policy Statement Will Be Disseminated to All Site Personnel as Attachment to Paychecks & Included as Part of Bid SpecFitness for Duty
ML18094B4079 April 1990Forwards Corrected Pages to Rept Entitled, Assessment of Impacts of Salem & Hope Creek Generating Stations on Kemp'S Ridley & Loggerhead Sea Turtles. Addl Mitigating Measures Will Be Incorporated to Minimize Effects on Turtle Species
ML18094B3884 April 1990Forwards Annual Rept for 1989 & Summary of Owners 1990 Projected Internal Cash Flow Statements
ML18094B40520 March 1990Provides List of Sources & Amounts of Financial Protection Carried on Plants,Per 10CFR50.54(w)
ML18094B36420 March 1990Responds to Generic Ltr 89-19 Re Overfill Protection for Steam Generators in PWRs & Reactors in Bwrs.Overfill Protection Sys Sufficiently Separate from Control Sys & Not Powered from Same Power Source
ML20012D1369 March 1990Responds to NRC 900207 Ltr Re Violations Noted in Insp Rept 50-354/89-80.Corrective Actions:Periodic Mgt Evaluation of Procedure Writing Effort Will Be Conducted to Ensure That No Recurrence of Backlog Problems OccurTemporary Modification
Scaffolding
ML20012B6398 March 1990Provides Addl Info in Response to Generic Ltr 88-11 Re Radiation Embrittlement of Reactor Vessel Matls,Including Comparison of Irradiation Embrittlement Predictions of Reg Guide 1.99,Revs 1 & 2 for Plant
ML18094B32228 February 1990Forwards Executed Amend 14 to Indemnity Agreement B-74
ML20006F38316 February 1990Forwards 1989 Inservice Exam of Selected Class 1 & Class 2 Piping & Components at Hope Creek Generating Station & Sept/Oct 1989 Inservice Exam of Selected Class 1 & Class 2 Components at Hope Creek Generating Station.Hydrostatic
VT-2
Pressure Boundary Leakage
ML20011E61512 February 1990Forwards Revs 1 to Security Plan & Security Training & Qualification Plan & Rev 2 to Security Contingency Plan. Salem Switchyard Project Delayed.Revs Withheld (Ref 10CFR73.21)
ML20006B87226 January 1990Forwards Progress Rept on Project to Upgrade Nuclear Site Physical Security Features.Encl Withheld (Ref 10CFR73.21)
ML18094B28626 January 1990Forwards Response to Generic Ltr 89-13, Svc Water Problems Affecting Safety-Related Equipment. Aggressive Program of Monitoring,Insp & Matl Replacement Initiated in Advance of Generic Ltr 89-13 IssuanceCoatings
Biofouling
ML20006A80019 January 1990Forwards Response to NRC 891220 Ltr Re Violations Noted in Plant Insps.Response Withheld (Ref 10CFR73.21)
ML19354E79619 January 1990Responds to NRC Bulletin 89-002 Re Anchor Darling Model S350W Swing Check Valves W/Type 410 Stainless Steel Internal Bolting.No Subj Anchor Darling Valves Installed at Facility. Valves of Similar Design Installed at FacilityAnchor Darling
ML18094B2333 January 1990Certifies Util Implementation of fitness-for-duty Program, Per 10CFR26.Training Element Required by Rule Completed on 891215.Chemical Testing for Required Substances Performed at Min Prescribed cut-off Levels,Except for MarijuanaFitness for Duty
ML18094B22927 December 1989Requests to Apply ASME Section XI Code Case N-460 to Facilities Re Reduction in Exam Coverage on Class 1 & 2 Welds.Fee Paid
ML18094B22027 December 1989Advises of Intent to Provide follow-up Response to Generic Ltr 89-10 by 900831 to Describe Status of Program, Recommendation Exceptions & Any Schedule Adjustments
ML19332F3607 December 1989Provides Clarification on Status of Rev 9 to Facility Odcm. Rev 10 Superceeds Rev 9 to ODCM Per 890320 ApprovalOffsite Dose Calculation Manual