Issue date | Title | Topic | |
---|---|---|---|
ML20195J174 | 29 November 1988 | Provides Supplemental Response to Violations Noted in Insp Rept 50-518/87-01.Corrective Actions:Completion of Procedure on Prescribing Preventive Maintenance Requirements Rescheduled for 890301 | |
ML20151E751 | 14 July 1988 | Responds to NRC Re Violations Noted in Insp Repts 50-518/87-01 & 50-520/87-01.Corrective Actions:Reviewed Vendors Storage & Preventive Maint Instructions Against Tech Spec 01.00.15.14.03 & Revised Topical Rept TVA-TR75-1A | Coatings |
ML20235B362 | 25 August 1987 | FOIA Request for Listed Documents for Specified Dockets | |
ML20133N732 | 24 October 1985 | Forwards Proposed Cancellation Plans for Plants Officially Canceled on 840829.Requests Withdrawal of CPPR-150,CPPR-152, CPPR-172 & CPPR-173.W/two Oversize Drawings | |
ML18029A398 | 27 February 1985 | Responds to RM Diggs 850117 & 0211 Ltrs Re Determination of Fees for Const Extension Requests.Util Supports NRC Determination & Will Submit Fees | |
ML20096F847 | 5 September 1984 | Forwards Motion to Terminate Appellate Jurisdiction.W/O Encl.Related Correspondence | |
ML20090B355 | 22 May 1984 | Forwards Response to Unresolved Items in IE Insp Repts 50-518/84-01 & 50-520/84-01.Corrective Actions:Util Prepared Preventive Maint Document Establishing Guidance for Protection,Preservation & Periodic Insp of Matls | |
ML20093F092 | 22 May 1984 | Responds to NRC Re Violations Noted in IE Insp Repts 50-518/84-01 & 50-520/84-01.Corrective Actions:Matl & Equipment Will Be Maintained Per Requirement Documents & Permanent Structures Will Be Thoroughly Inspected Annually | |
ML20073S859 | 5 May 1983 | Forwards Details of Deferral Plans for Hartsville Nuclear Plant A. Yellow Creek Plan Submittal Delayed Until 830513 | |
ML20071B974 | 24 February 1983 | Reiterates 830121 Request for CP Extension Until 870901 to Permit Final Decision Re Future of Nuclear Units Based on Load Growth/Demand.Deferral Plan Details to Be Submitted by 830506 | |
ML20069Q366 | 30 November 1982 | Forwards Socioeconomic Monitoring & Mitigation Rept, & Const Employee Monitoring Errata Rept | |
ML20065S379 | 26 October 1982 | Informs of Discussions Re Leasing Portions of Site to Lansdowne Steel & Iron Co for 10 Yrs.Description of Site Portions Under Consideration Encl.Cp for Sites Withdrawn | |
ML20065F837 | 13 September 1982 | Forwards Response to NRC Re Violations Noted in IE Insp Repts 50-518/82-08 & 50-520/82-08.Corrective Actions:Qc Investigation Rept Written to Prevent Use of Protective Coatings & PVC Conduit Covered & Stored | Coatings |
ML20069D516 | 10 September 1982 | Forwards Socioeconomic Monitoring & Mitigating Rept,Sept 1981 | |
ML20055C061 | 6 August 1982 | Forwards Info Re QA for Deferred Plants,In Response to NRC .Possible Cancellation of Some Units Will Be Discussed at Future Meeting of TVA Board of Directors | |
ML20054K153 | 23 June 1982 | Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects | |
ML20054D650 | 19 February 1982 | Submits Final Response Re IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. No Westinghouse Type Switches Used in Facilities | |
ML20041C109 | 18 February 1982 | Forwards Hartsville Nuclear Plants Socioeconomic Monitoring & Mitigation Rept,Hnp SMR-10,810331, as Required by Cps. Continuing Info Will Be Provided on Semiannual Basis | |
ML20040G815 | 4 February 1982 | Forwards Revision 2 to, Geologic Foundation Rept,Fault Descriptions, Per 780531 Meeting Request | |
ML20040E838 | 6 January 1982 | Ack Receipt of IE Insp Repts 50-518/81-20,50-519/81-20, 50-520/81-20 & 50-521/81-20.Corrective Actions:Insp & Const Personnel Instructed to Begin Lightly Scarifying Layers on All Backfill | |
ML20040C136 | 29 December 1981 | Responds to NRC 811117 Ltr Re Violations Noted in IE Insp Repts 50-518/81-18,50-519/81-18,50-520/81-18 & 50-521/81-18. Corrective Actions:Preventive Maint Requirements for RHR Pumps Will Be Performed Quarterly | Coatings |
ML20039A281 | 4 December 1981 | Notifies That Environ Const Noise Monitoring Procedures Will Be Revised at Hartsville & Yellow Creek & Terminated at Phipps Bend.Changes Caused by Slowdown & Cessation of Const. Summary of Const Noise Monitoring Program History Encl | |
ML20040C265 | 16 November 1981 | Submits Final Response to IE Bulletin 81-02,Suppl 1,re Potentially Deficient Valves.No Subj Valves Installed at Plants | |
ML20010H348 | 14 August 1981 | Responds to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. No Subj Switches Have Been Identified at Facilities.Util Awaits Info from GE for Final Resolution.Next Response by 811030 | |
ML20010A329 | 30 July 1981 | Forwards HNP SMR - 9, Socioeconomic Monitoring & Mitigation Rept for Apr-Sept 1980 | |
ML20009G329 | 23 July 1981 | Submits Final Response to IE Bulletin 80-21,per NRC 801106 Ltr.Ge & Valve Vendors Indicate No safety-related Valves Have Parts Mfg by Malcolm Foundry Co,Inc | |
ML20009E987 | 21 July 1981 | Advises That Planned Start of Excavation for Intake & Discharge in Cumberland River Will Be Delayed Until Aug 1982,per Attachment C of CP | |
ML20009G127 | 15 July 1981 | Interim Deficiency Rept Re High Pressure Core Spray Component Wiring Discrepancies.Corrective Action Date for Hardware & Software Will Be 810730 Instead of 810630. Revised Vendor Drawings Have Not Been Received | |
ML20009D931 | 8 July 1981 | Forwards Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). | Biofouling |
ML20009D732 | 8 July 1981 | Responds to IE Bulletin 81-02, Failure of Gate Type Valves to Close Against Differential Pressure. No Deficient Valves Are Being Supplied for Use at Facility.Addl Rept Will Be Provided by 811016 | |
ML20009G757 | 6 July 1981 | Responds to NRC 810604 Ltr Re Violations Noted in IE Insp Repts 50-518/81-08,50-519/81-08,50-520/81-08 & 50-521/81-08. Corrective Actions:Procedure Revised to Include Requirement for Writing Notification of Change Rept within Three Days | |
ML20009A488 | 2 July 1981 | Forwards Info Re Implementation of NUREG-0313,Revision 1,in Response to NRC 810226 Ltr.Addl Info for Hartsville & Phipps Bend Will Be Provided in Respective FSARs Tentatively Scheduled for Sept 1983 Submittal | Dissimilar Metal Weld |
ML20009D946 | 15 June 1981 | Submits Third Interim Response to IE Bulletin 80-20 Re Failure of Westinghouse W-2 Control Switches.Work Continuing W/Westinghouse on Resolution of Control Switches. GE Collecting Requested Info.Final Rept Ready by 810814 | |
ML20004E938 | 27 May 1981 | Submits Second Interim Response to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. No Valves W/Vendor Parts Found at Plants.Final Rept,Including GE Input on NSSS Valves, Will Be Filed by 810731 | |
ML20004E712 | 22 May 1981 | Forwards Final Supplemental Response to NRC 810114 Ltr Re Violations Noted in IE Insp Repts 50-518/80-24 & 50-520/80-24.Corrective Actions:Mod to Be Encircled on ECN to Improve Visual Identification of Affected Change Areas | |
ML20004E628 | 22 May 1981 | Responds to NRC 810114 Ltr Re Violations Noted in IE Insp Repts 50-518/80-24 & 50-520/80-24.Corrective Actions:Mods Will Be Enriched on Engineering Change Notifications to Improve Visual Identifications | |
ML20126L016 | 22 May 1981 | Forwards Addl Info Re Flammability of Suspended Ceiling Tile in Control Rooms & Replacement Panels to Be Used at Browns Ferry.Interim Rept on Hartsville & Phipps Bend Sent 810114. Info Constitutes Final Response to | |
ML19346A115 | 15 May 1981 | Responds to NRC 810320 Ltr Re Violations Noted in IE Insp Repts 50-518/81-04,50-519/81-04,50-520/81-04 & 50-521/81-04. Corrective Actions:Qcirs Will Be Reviewed & Upgraded as Required & Audit Will Be Conducted by QA Unit | |
ML20004F499 | 7 May 1981 | Responds to NRC 810410 Ltr Re Violations Noted in IE Insp Repts 50-553/81-03 & 50-554/81-02.Corrective Actions: Computer Program Developed to Control Receipt & Issuance of Drawings & Other Documents | |
ML19346A116 | 17 April 1981 | Responds to NRC 810320 Ltr Re Violations Noted in IE Insp Repts 50-518/81-04,50-519/81-04,50-520/81-04 & 50-521/81-04. Corrective Actions:Welders Restricted to Limits of Qualifications | |
ML19347E091 | 3 April 1981 | Forwards Justification for Delay in Meeting 821001 Date for Having Operational Upgraded Emergency Response Facility,As Required by Item III.A.1.2 of NUREG-0737.Response for Hartsville & Phipps Bend Will Be Provided by 811009 | |
ML19347E005 | 1 April 1981 | Forwards Response to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Valcor Valves Cited in Bulletin Are Not in Use at Plants | |
ML20004E631 | 31 March 1981 | Responds to NRC 810114 Ltr Re Violations Noted in IE Insp Repts 50-518/80-24 & 50-520/80-24.Corrective Actions:Ge Has Been Requested to Document Mods Re Engineering Change Notifications & Drawings | |
ML20004E717 | 31 March 1981 | Suppls Response to NRC 810114 Ltr Re Violations Noted in IE Insp Repts 50-518/80-24 & 50-520/80-24.Final Response to Be Submitted Before 810531 | |
ML20003J399 | 27 March 1981 | Forwards Supplemental Response Re Violations Noted in IE Insp Repts 50-553/80-18 & 50-554/80-16.Corrective Actions: Rebar Verification Group Established to Work Directly W/Const Forces During Installation Processes | |
ML19352A260 | 16 March 1981 | Responds to NRC 810211 Ltr Re Violations Noted in IE Insp Repts 50-518/80-27,50-519/80-25,50-520/80-27 & 50-521/80-23. Corrective Actions:Procedures Re Concrete Placement Initiated | |
ML19350B460 | 13 March 1981 | Forwards Plan for Implementing Mussel Monitoring Program Requirements in Cp.Excavation for Discharge Diffuser Tentatively Scheduled for Oct 1981.Prediffuser Const Monitoring Will Be Initiated in Near Future | |
ML20003J402 | 26 February 1981 | Responds to NRC 810203 Ltr Re Violations Noted in IE Insp Repts 50-553/80-18 & 50-554/80-16.Corrective Actions: Personnel Instructed to Utilize Necessary Drawings & Make Detailed Drawing Reviews | |
ML19341C286 | 24 February 1981 | Forwards Info Re Faults 26 & 27 in Foundation Piers 34 & 19 of Unit 1 Cooling Tower,Initially Reported on 810113 & 22. Neither Fault Is Capable within Meaning of App a to 10CFR100 | |
ML19341D041 | 10 February 1981 | Provides Addl Response to IE Bulletin 80-20 Re Westinghouse Type W-2 Switches.Info from GE Re Stride Portion of Facilities Has Not Been Received.Info Anticipated by 810615 |