ML20134E321 | 14 August 1985 | Advises of Corporate Approval of Change in Planned Dates for Commercial Operation for coal-fired Inola Station,To Be Built on Site of Canceled Black Fox Station.Units 1 & 2 Scheduled for Completion in Dec 1996 & 1998,respectively | |
ML20132B415 | 12 June 1985 | Forwards Application for Waiver of Withdrawal Fees Under 10CFR170.12(b).NRC Delays in Issuance of CPs Deprived Util of Opportunity to Effect Withdrawal Before 1981 Operative Date of Regulation Charging Withdrawal Fees | |
ML20091R572 | 8 June 1984 | Requests Precise Delineation of Applicable Regulations & Accounting of Prof Staff Hours Expended Re Review Costs Charged for Withdrawal of CP Application.Waiver of Any Interest Penalty Requested | |
ML20080F801 | 3 February 1984 | Requests Deletion of Gw Muench & Rl Range from Address Label | |
ML20069D869 | 20 September 1982 | Forwards Black Fox Station Soil Stabilization & Erosion Control Program, Per ASLB 820618 Memorandum & Order.Plan Addresses Concerns Raised in NRC 820602 Submittal | |
ML20054K153 | 23 June 1982 | Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects | |
ML20041A561 | 16 February 1982 | Announces Cancellation of Black Fox Station,Confirming 820216 Verbal Notification.Site Will Be Preserved for Const of Future Power Generation Projects | |
ML20039B705 | 11 December 1981 | Forwards Response to NRC 811203 Ltr Requesting Updated Info on Generic Issues A-10,A-31,A-36,A-42,A-43,A-44,A-45,A-46, A-47 & A-48 for SER Suppl.Svc List Encl | |
ML20140B277 | 9 September 1981 | Forwards Amend 16 to Psar.Review Copies Forwarded w/810901 Ltr | |
ML20140B285 | 1 September 1981 | Forwards Amend 16 to Psar.Remaining Copies Forthcoming.Amend Begins New Vol of Psar,Designated as Addendum I | |
ML20009D931 | 8 July 1981 | Forwards Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). | Biofouling |
ML19318B975 | 20 June 1980 | Advises That List of Matls to Be Used in Const of Fire Stops & Characteristics Re Flammability & Fire Retardancy Will Be Provided 1 Yr Subsequent to Receipt of CP | |
ML19294C270 | 28 February 1980 | Requests Opportunity to Discuss Priority of NRC CP Activities in post-TMI Period.Utils Are Concerned About Availability of NRC Resources in Coming Yr to Deal W/Related Hearings.Nrc Resources Can Be Optimized | |
ML19305B468 | 7 February 1980 | Responds to NRC 800122 Ltr Re Deviation Noted in IE Insp Repts 50-556/80-01 & 50-557/80-01.Corrective Actions: Training Session on Fppm Procedures Will Be Presented to Employees Involved W/Matl Control Activities | |
ML19290C640 | 12 December 1979 | Submits Analyses of Unit 2 Excavation Seal Involving Assessment of Mass Fill Strength of Lean Concrete as Foundation Matl.Fulfills Util 791019 Commitment.Requests Prompt Review & Authorization to Proceed Under LWA | |
ML19260C102 | 12 December 1979 | Forwards Analyses Re Excavation Seal.Analyses Involve Assessment of Strength of Mass Fill of Lean Concrete Vs Natural Rock Structure & Effect on Dynamic Response of safety-related Structures | |
ML19260A620 | 1 November 1979 | Responds to NRC 791016 Ltr Re Violations Noted in IE Insp Repts 50-556/79-04 & 50-557/79-04.Corrective Actions: Preventative Maint Record Forms Revised & Approved 791030 | |
ML19210C324 | 19 October 1979 | Discusses Overexcavation of Unit 2 Foundation.Overexcavation Necessary to Remove Underlying Soft Siltstone Matl.Area Will Be Filled W/Concrete to Bring Excavation Surface Up to Design Grade | |
ML19290C645 | 19 October 1979 | Updates & Confirms Conversations Re Unit 2 Excavation Authorized Under Amend 2 of Lwa.Moss Fill of Lean Concrete Will Be Required in Order to Comply W/Design Base Foundation Elevation.Analyses Will Be Submitted Upon Completion | |
ML19260C107 | 19 October 1979 | Informs NRC of Delay in Preparation of Analyses Re Excavation Seal.Excavation Authorized Under Amend 3 of Lwa. to Bring Entire Structure Up to Design Base Elevation, Mass Fill of Lean Concrete Will Be Required | Earthquake |
ML19250A734 | 19 October 1979 | Updates & Confirms Conversations Re Excavation of Unit 2. Mass Fill of Lean Concrete Will Be Required to Bring Entire Excavation Up to Design Base Foundation Elevation.Analyses Will Be Provided for NRC Prior to Taking Action | |
ML19250A468 | 12 October 1979 | Responds to 791010 Ltr Re NRC Position Re Status of TMI Review Efforts to Pending CP Applications.Commitments to NUREG-0578 Will Be Documented by Amend to PSAR Prior to Reopening of Hearings on Radiological Health & Safety | |
ML19249B785 | 24 August 1979 | Responds to HR Denton 790820 Request & Clarifies 790727 & 0808 Submittals Re TMI Licensing Requirements | |
ML19248D271 | 8 August 1979 | Clarifies Util 790727 Response to CP Requirements Re TMI-2. Analysis of Accidents & Anticipated Operational Occurrences Will Use Reg Guide 1.70,Revision 2.Util Will Maintain as-built Drawings | Anticipated operational occurrence |
ML19249F019 | 8 August 1979 | Discusses Util Intent Re SER Suppl.Util Analysis of Accidents & Anticipated Operational Occurences Will Use Reg Guide 1.70,Revision 2.TMI-related Commitments Will Be Included in Fsar.Certificate of Svc Encl | |
ML19208D672 | 27 July 1979 | Forwards Supplemental, Response to NUREG-0578,App.A,TMI-2 Lessons Learned Task Force Short Term Recommendations. Certificate of Svc Encl | |
ML19225C628 | 27 July 1979 | Responds to NUREG-0578, TMI-2 Lessons Learned Task Force Status Rept & Short-Term Recommendations, IE Bulletin 79-08 & Selected Emergency Preparedness Issues.Reiterates 790615 Analyses in New Format.Certificate of Svc Encl | Safe Shutdown Anticipated operational occurrence Backfit |
ML19225A806 | 11 July 1979 | Discusses Two Items of Concern in Connection w/780925 & 26 IE Insp of Station Environ Impact Control Procedures. Describes Method of Compliance Re Hydrological Monitoring Program & Transmission of Ecological Review | |
ML19254B265 | 10 July 1979 | Requests Addl Const Activities Under 10CFR50.10(e)(1) Be Authorized at Site During Delay in Licensing Procedures Due to Tmi.Work Will Keep Onsite Forces Active & Help Avoid Costs of Const Demobilization & Restart | |
ML19254B270 | 10 July 1979 | Supplements 790607 Ltr Re Status of Containment Vessel Design Alternatives.Forwards Black & Veatch 790706 Recommendation for Reducing Dynamic Loads on Piping Due to Containment Vessel Response | |
ML19246B541 | 10 July 1979 | Requests Authorization for Certain Const Activities Not Usually Permitted Under Lwa,In Order to Take Up Slack Caused by Licensing Delay After TMI-2 Accident.Forwards List of Requested Const Activities | |
ML19253A220 | 3 July 1979 | Discusses Contents of Overview Program for safety-related Concrete Activities | |
ML19224C350 | 22 June 1979 | Forwards Two Oversized Engineering Drawings Showing Coordinates & Elevations of Water Transport Sys | |
ML19254B271 | 7 June 1979 | Forwards Black & Veatch 790605 Ltr Re Status of Evaluation of Dynamic Loads Imposed Upon Piping Sys by Containment Vessel Responses | |
ML19274E475 | 21 March 1979 | Forwards Loan Guarantee Commitments & Station Ownership Agreement in Response to NRC Request.Asks Receipt of Documents Be Noted in SER Suppl 2 & That No Financial Qualification Conditions Be Imposed on Const Permits | New Project Manager Earthquake |
ML19263C434 | 16 February 1979 | Submits Copies of Errata & Addendum Sheets of Amend 15 to PSAR & Responds to NRC Questions Re Amend.Areas Discussed Include Automatic Depressurization Sys & Results of Transient Analyses | |
ML19263C385 | 13 February 1979 | Applicants Will Use square-root-sum-of-the-square Load Combination Methodology in Component Design & Use of Absolute Summation Method for Structures Design.Requests This Be Reflected in FSAR Suppl.W/Encl Suppl Matl | Earthquake |
ML19269C611 | 2 February 1979 | Forwards Amend 14 to PSAR to Update Various Areas of Operations | |
ML19270F340 | 25 January 1979 | Ack Receipt of NRC 790116 Ltr Clarifying NRC Concern Over Completeness of Documentation.Forwards Copy of Ltr to Make Docket Complete | |
ML19274D136 | 5 January 1979 | Submits Info Re Qualification & Training of pre-operational & Startup Testing Personnel.Info Submitted to Clarify Matl in Amend 13 & Will Be Incorporated Into Amend 14 to PSAR | |
ML19259A756 | 2 January 1979 | Responds to 781206 Reminder to Provide NRC W/Accurate & Complete Info.Feels Ltr of Reprimand & Insinuation Is Unjustified & Insists on Clarification | |
ML19305A105 | 29 December 1978 | Forwards Page 2 of Criteria for Combination of Earthquake &/Or Other Transient Responses Inadvertently Left Out of Some Copies Transmitted on 781220 from M Fate to SA Varga | Earthquake |
ML20148A740 | 21 December 1978 | Forwards Info Re Status of Excavation & Geomapping Effort for the Bfs Unit 1 Found.Compaction & Moisture Tests Will Be Performed Until 781229 | |
ML19322A067 | 20 December 1978 | Forwards Newark-Kennedy Criteria for Combinations of Earthquake &/Or Other Transients Responses. Believes Criteria Justify Use of Square Root of the Sum of the Squares Methodology for Generic Nuclear Power Station Design | Earthquake |
ML20147H351 | 18 December 1978 | Repts Assessing Feasibility of Pursuing Initial Safety Related Constr Under LWA Ii.Should It Be Requested Various Activities Would Need to Be Performed Such as Installation of Underdrain Trenches in Excavation Seal | |
ML20150E909 | 18 December 1978 | Forwards Results of an Analysis Performed to Investigate the Effects of LPCI Diversion on ECCS Performance.Rept Was Incl as Part of Amend 13 Originally Submitted in .Encl Analysis Will Be Submitted in Amend 14 | Operator Manual Action |
ML20150E349 | 7 December 1978 | Responds to 781201 Request.Provides Sched for Excavating & Geomapping at Subj Facil.Requests Notification of Which Phases NRC Wishes to Observe | |
ML19256A292 | 17 November 1978 | Submits amend#13 to Preliminary Safety Analysis Rept.Subj Covered:Ability of Ultimate Heat Sink to Withstand Tornado Missiles,Lpci Diversion Effects on ECCS Performance & Rev PSAR Figure 14.16a.W/cert of Svc | Safe Shutdown Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Operator Manual Action Tornado Generated Missile Turbine Missile |
ML20150C206 | 10 November 1978 | Forwards Copies of PSAR Figure 14.16a Showing Containment Elevator Pit Framing.Drawing Represents Current Design.Also Encl Is PSAR p.9.2-11 Showing Current Psok Position Re UHS Cooling Tower Design.Cert of Svc Encl | |
ML20148J732 | 7 November 1978 | Responds to Informing NRC That Util Will Mod Design of UHS Cooling Tower to Provide Tornado Missile Protec to Fans & Discharge Nozzles.Design Mod Req Change in PSAR Sections 1.9 & 9.2 | Ultimate heat sink Tornado Generated Missile Tornado Missile Protection |