ML20140B285
ML20140B285 | |
Person / Time | |
---|---|
Site: | Black Fox |
Issue date: | 09/01/1981 |
From: | Fate M PUBLIC SERVICE CO. OF OKLAHOMA |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML20140B281 | List: |
References | |
6212DIN5-023-02, 6212DIN5-23-2, NUDOCS 8109140140 | |
Download: ML20140B285 (1) | |
Similar Documents at Black Fox | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20094K9541992-03-13013 March 1992
[Table view]Forwards Supplemental Info Addressing Reasons for Delays Which Have Occurred in Schedule for Const of fossil-fueled Electric Generating Facility at Inola Station Site ML20092M4001992-02-20020 February 1992 Submits Addresses for DM Saunders & Jg Aronson,Per Request in Connection w/920226 Meeting.Addresses for R Butkin & M Graham W/Ok State Government Also Listed ML20092K4941992-02-14014 February 1992 Confirms 920205 Telcon Requesting Meeting Between NRC & Util on 920226 for Util to Present Matl Re Status of Inola Station Site to Demonstrate That Owner Have Satisfied Conditions Contained in 830307 Order ML20209H1221987-02-0202 February 1987 Final Response to FOIA Request.App I Documents Encl & Available in Pdr.App J Documents Withheld (Ref FOIA Exemption 5) ML20207L1381986-11-10010 November 1986 FOIA Request for Info Between Connelly & Officials at NRC Technical Training Ctr in Chattanooga,Tn Re Requirements for Training of NRC Inspectors & for Info Re IE Investigation Into NRC Inspector Training Requirements ML20199E4721986-02-0606 February 1986 Responds to FOIA Request for SECY-85-367A & SECY-85-371. Forwards Portions of Documents Listed in App.Info Also Available in Pdr.App Documents Partially Withheld (Ref FOIA Exemption 5) CY-85-367, FOIA Request for SECY-85-367A & SECY-85-3711985-12-13013 December 1985 FOIA Request for SECY-85-367A & SECY-85-371 ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20132C1621985-09-18018 September 1985 Responds to 850612 & 14 Requests for Waiver of 10CFR170 Fees for Withdrawal of CP Application & for Informal Hearings.Requests Denied.Util Not Denied Opportunity in 1981 to Withdraw Application ML20134E3211985-08-14014 August 1985 Advises of Corporate Approval of Change in Planned Dates for Commercial Operation for coal-fired Inola Station,To Be Built on Site of Canceled Black Fox Station.Units 1 & 2 Scheduled for Completion in Dec 1996 & 1998,respectively ML20127A9961985-06-14014 June 1985 Forwards Application for Waiver of Withdrawal Fees Under 10CFR170.12(b) & Brief in Support of Application,Per 850129 Meeting ML20132B4151985-06-12012 June 1985 Forwards Application for Waiver of Withdrawal Fees Under 10CFR170.12(b).NRC Delays in Issuance of CPs Deprived Util of Opportunity to Effect Withdrawal Before 1981 Operative Date of Regulation Charging Withdrawal Fees ML20097C3231984-08-0909 August 1984 Responds to Questions Re Beam Stops ML20091R5721984-06-0808 June 1984 Requests Precise Delineation of Applicable Regulations & Accounting of Prof Staff Hours Expended Re Review Costs Charged for Withdrawal of CP Application.Waiver of Any Interest Penalty Requested ML20088A1641984-04-10010 April 1984 Reiterates 840322 Request for Return of Reed Rept Under 10CFR2.790(b)(5).Reconsideration of Positions Taken in Oct 1980 Split Vote Re Release of GE Repts Requested. Certificate of Svc Encl ML20087K0001984-03-22022 March 1984 Requests Reconsideration of 801009 Split Vote to Release Reed Rept & Sub-Task Force Repts.Return of Repts Requested. Separate Views of Commissioner Hendrie & Certificate of Svc Encl ML20080F8011984-02-0303 February 1984 Requests Deletion of Gw Muench & Rl Range from Address Label ML20136E5971983-10-28028 October 1983 Advises of 831110 Site Visit to Observe Implementation of 820830 Soil Stabilization & Erosion Control Plan ML20069D8691982-09-20020 September 1982 Forwards Black Fox Station Soil Stabilization & Erosion Control Program, Per ASLB 820618 Memorandum & Order.Plan Addresses Concerns Raised in NRC 820602 Submittal ML20054K1531982-06-23023 June 1982 Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects ML20054J0181982-06-22022 June 1982 Ack Receipt of Re Withdrawal of CP Application. NRC Responded in Timely Manner to Util Given TMI Accident & Need to Ensure Implementation of Lessons Learned from Accident ML20053D1821982-05-28028 May 1982 Forwards JB West 820527 Affidavit on NRC Concerns Expressed During 820517 Site Visit Re Potential Offsite Environ Impact of Erosion & Siltation in Areas of Inclined Reactor Pressure Vessel Haul Road from Barge Slip Facilities ML20041A5611982-02-16016 February 1982 Announces Cancellation of Black Fox Station,Confirming 820216 Verbal Notification.Site Will Be Preserved for Const of Future Power Generation Projects ML20040A9621982-01-18018 January 1982 Forwards Ok Corporation Commission 820115 Decision in Cause 27068 Re Util Application for Rate Increase ML20039E8561982-01-0606 January 1982 Forwards DF Guyot Affidavit & Interim Containment Loads Rept,Mark III Containment, Revisions 3 & 4.Matls Pertinent to Contentions 3 & 16 Litigated in Dec 1978 & Feb 1979 ML20039B7051981-12-11011 December 1981 Forwards Response to NRC 811203 Ltr Requesting Updated Info on Generic Issues A-10,A-31,A-36,A-42,A-43,A-44,A-45,A-46, A-47 & A-48 for SER Suppl.Svc List Encl ML20039C6051981-12-0909 December 1981 Suppls Response to 810912 & 0603 Ltrs Re Nonconformance Noted in QA Program Insp Rept 99900526/80-01.Revised Drawing List for Black Fox Facility Will Not Be Completed Until Apr 1982 ML20005C1001981-11-0505 November 1981 Forwards Amend 18 to Psar.Amend Contains Matl Responsive to Two Hydrogen Control Requirements of near-term Cp/Mfg License Regulations Which Were Adopted by NRC on 810827. Related Correspondence ML20140B2771981-09-0909 September 1981 Forwards Amend 16 to Psar.Review Copies Forwarded w/810901 Ltr ML20010H4021981-09-0808 September 1981 Forwards Ok Corp Commission,Black Fox Station Economic Viability Study. Related Correspondence ML20140B2851981-09-0101 September 1981 Forwards Amend 16 to Psar.Remaining Copies Forthcoming.Amend Begins New Vol of Psar,Designated as Addendum I ML20010D1641981-08-18018 August 1981 Requests Svc List Be Revised Per Encl ML20009D9311981-07-0808 July 1981 Forwards Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). ML20005A2541981-05-25025 May 1981 Responds to NRC 810423 Ltr Re Nonconformance Noted in QA Program Insp Rept 99900039/81-01.Corrective Actions:Quality Procedures Established to Ensure Control of Insp Activities in Accordance W/Ansi Requirements ML20005A2301981-05-18018 May 1981 Responds to NRC 810416 Ltr Requesting Info Re Status of Black Fox Unit 2 Reactor Vessel.No Activities Performed Since Last Visit ML20003E2571981-03-0202 March 1981 Forwards Ok Association of Electric Cooperatives 810122 Ltr Re Streamlining of Nuclear Plant Licensing & Development of Nuclear Power.Doe 810302 Response Encl ML20126E6991981-02-10010 February 1981 Opposes Facility ML20002D3261980-12-10010 December 1980 FOIA Request for Extracts of 27 safety-related Issues Identified by GE in Reed Rept ML20151B1111980-11-14014 November 1980 Suppls 800116 Response to FOIA Request for GE Reed Rept, & Excerpt Re 27 safety-related Issues.Forwards Commission Memo Re Release of Rept.Rept Cannot Be Released Pending Resolution of Claims.W/O Encl ML19345C2711980-10-29029 October 1980 Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants ML19343A9241980-10-21021 October 1980 Petition Urging Support for Wide Use of Solar & Wind Power, & Phasing Out of Nuclear Power Plants,Especially Black Fox, as Soon as Possible ML19340B8331980-10-21021 October 1980 Petitions Govt Representatives to Promote Use of Solar & wind-powered Energy & Phase Out Operation of Nuclear Plants as Quickly as Possible ML19347B5701980-10-10010 October 1980 Demands,On Behalf of Ge,That NRC Return GE Reed Rept Immediately Due to NRC Denial of Request That Rept Be Withheld from Disclosure Under 10CFR2.790.Rept Must Not Be Placed in PDR ML19318B9751980-06-20020 June 1980 Advises That List of Matls to Be Used in Const of Fire Stops & Characteristics Re Flammability & Fire Retardancy Will Be Provided 1 Yr Subsequent to Receipt of CP ML19326D6371980-05-0505 May 1980 Opposes Const of Facilities Until Adequate Emergency Response Plan Can Be Developed.Recommends Responsibility for Emergency Response Plan Be Placed W/Independent Consulting Svc,Not State of Ok ML20126D3201980-04-0404 April 1980 Forwards Corp Commission of State of Ok 800403 Order Denying Request for Approval to Sell Bonds.Psc of Ok Presently Reviewing Order W/View of Filing Appeal W/Ok Supreme Court ML19309G5071980-04-0202 April 1980 Notifies That Representative of Intervenor State of Ok Will Attend NRC 800403 Meeting W/Cp Owners Group.Deplores Fact That Meeting Is First Interaction Between NRC & Applicants Re Development of Generic Policy ML20126D4031980-03-26026 March 1980 Forwards D Plant Expressing Concern Re Possible Meltdown at Facilities.Requests Response ML19309H4781980-03-26026 March 1980 Requests Response to Encl D&D Plant Request That Environ & Site Suitability Hearings in Licensing Proceeding Be Reopened to Address Class 9 Accidents ML18082A1641980-03-24024 March 1980 Forwards Licensee Supplemental Brief Re Motion for Directed Certification & for Stay.Pendency of Class 9 Issue Before Commission Noted in Licensee Motion for Directed Certification & for Stay.Discussed on Pages 7-10 1992-03-13 Category:INCOMING CORRESPONDENCE MONTHYEARML20094K9541992-03-13013 March 1992
[Table view]Forwards Supplemental Info Addressing Reasons for Delays Which Have Occurred in Schedule for Const of fossil-fueled Electric Generating Facility at Inola Station Site ML20092M4001992-02-20020 February 1992 Submits Addresses for DM Saunders & Jg Aronson,Per Request in Connection w/920226 Meeting.Addresses for R Butkin & M Graham W/Ok State Government Also Listed ML20092K4941992-02-14014 February 1992 Confirms 920205 Telcon Requesting Meeting Between NRC & Util on 920226 for Util to Present Matl Re Status of Inola Station Site to Demonstrate That Owner Have Satisfied Conditions Contained in 830307 Order ML20207L1381986-11-10010 November 1986 FOIA Request for Info Between Connelly & Officials at NRC Technical Training Ctr in Chattanooga,Tn Re Requirements for Training of NRC Inspectors & for Info Re IE Investigation Into NRC Inspector Training Requirements CY-85-367, FOIA Request for SECY-85-367A & SECY-85-3711985-12-13013 December 1985 FOIA Request for SECY-85-367A & SECY-85-371 ML20134E3211985-08-14014 August 1985 Advises of Corporate Approval of Change in Planned Dates for Commercial Operation for coal-fired Inola Station,To Be Built on Site of Canceled Black Fox Station.Units 1 & 2 Scheduled for Completion in Dec 1996 & 1998,respectively ML20127A9961985-06-14014 June 1985 Forwards Application for Waiver of Withdrawal Fees Under 10CFR170.12(b) & Brief in Support of Application,Per 850129 Meeting ML20132B4151985-06-12012 June 1985 Forwards Application for Waiver of Withdrawal Fees Under 10CFR170.12(b).NRC Delays in Issuance of CPs Deprived Util of Opportunity to Effect Withdrawal Before 1981 Operative Date of Regulation Charging Withdrawal Fees ML20097C3231984-08-0909 August 1984 Responds to Questions Re Beam Stops ML20091R5721984-06-0808 June 1984 Requests Precise Delineation of Applicable Regulations & Accounting of Prof Staff Hours Expended Re Review Costs Charged for Withdrawal of CP Application.Waiver of Any Interest Penalty Requested ML20088A1641984-04-10010 April 1984 Reiterates 840322 Request for Return of Reed Rept Under 10CFR2.790(b)(5).Reconsideration of Positions Taken in Oct 1980 Split Vote Re Release of GE Repts Requested. Certificate of Svc Encl ML20087K0001984-03-22022 March 1984 Requests Reconsideration of 801009 Split Vote to Release Reed Rept & Sub-Task Force Repts.Return of Repts Requested. Separate Views of Commissioner Hendrie & Certificate of Svc Encl ML20080F8011984-02-0303 February 1984 Requests Deletion of Gw Muench & Rl Range from Address Label ML20069D8691982-09-20020 September 1982 Forwards Black Fox Station Soil Stabilization & Erosion Control Program, Per ASLB 820618 Memorandum & Order.Plan Addresses Concerns Raised in NRC 820602 Submittal ML20054K1531982-06-23023 June 1982 Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects ML20053D1821982-05-28028 May 1982 Forwards JB West 820527 Affidavit on NRC Concerns Expressed During 820517 Site Visit Re Potential Offsite Environ Impact of Erosion & Siltation in Areas of Inclined Reactor Pressure Vessel Haul Road from Barge Slip Facilities ML20041A5611982-02-16016 February 1982 Announces Cancellation of Black Fox Station,Confirming 820216 Verbal Notification.Site Will Be Preserved for Const of Future Power Generation Projects ML20040A9621982-01-18018 January 1982 Forwards Ok Corporation Commission 820115 Decision in Cause 27068 Re Util Application for Rate Increase ML20039E8561982-01-0606 January 1982 Forwards DF Guyot Affidavit & Interim Containment Loads Rept,Mark III Containment, Revisions 3 & 4.Matls Pertinent to Contentions 3 & 16 Litigated in Dec 1978 & Feb 1979 ML20039B7051981-12-11011 December 1981 Forwards Response to NRC 811203 Ltr Requesting Updated Info on Generic Issues A-10,A-31,A-36,A-42,A-43,A-44,A-45,A-46, A-47 & A-48 for SER Suppl.Svc List Encl ML20039C6051981-12-0909 December 1981 Suppls Response to 810912 & 0603 Ltrs Re Nonconformance Noted in QA Program Insp Rept 99900526/80-01.Revised Drawing List for Black Fox Facility Will Not Be Completed Until Apr 1982 ML20005C1001981-11-0505 November 1981 Forwards Amend 18 to Psar.Amend Contains Matl Responsive to Two Hydrogen Control Requirements of near-term Cp/Mfg License Regulations Which Were Adopted by NRC on 810827. Related Correspondence ML20140B2771981-09-0909 September 1981 Forwards Amend 16 to Psar.Review Copies Forwarded w/810901 Ltr ML20010H4021981-09-0808 September 1981 Forwards Ok Corp Commission,Black Fox Station Economic Viability Study. Related Correspondence ML20140B2851981-09-0101 September 1981 Forwards Amend 16 to Psar.Remaining Copies Forthcoming.Amend Begins New Vol of Psar,Designated as Addendum I ML20010D1641981-08-18018 August 1981 Requests Svc List Be Revised Per Encl ML20009D9311981-07-0808 July 1981 Forwards Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). ML20005A2541981-05-25025 May 1981 Responds to NRC 810423 Ltr Re Nonconformance Noted in QA Program Insp Rept 99900039/81-01.Corrective Actions:Quality Procedures Established to Ensure Control of Insp Activities in Accordance W/Ansi Requirements ML20005A2301981-05-18018 May 1981 Responds to NRC 810416 Ltr Requesting Info Re Status of Black Fox Unit 2 Reactor Vessel.No Activities Performed Since Last Visit ML20003E2571981-03-0202 March 1981 Forwards Ok Association of Electric Cooperatives 810122 Ltr Re Streamlining of Nuclear Plant Licensing & Development of Nuclear Power.Doe 810302 Response Encl ML20126E6991981-02-10010 February 1981 Opposes Facility ML20002D3261980-12-10010 December 1980 FOIA Request for Extracts of 27 safety-related Issues Identified by GE in Reed Rept ML19345C2711980-10-29029 October 1980 Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants ML19340B8331980-10-21021 October 1980 Petitions Govt Representatives to Promote Use of Solar & wind-powered Energy & Phase Out Operation of Nuclear Plants as Quickly as Possible ML19343A9241980-10-21021 October 1980 Petition Urging Support for Wide Use of Solar & Wind Power, & Phasing Out of Nuclear Power Plants,Especially Black Fox, as Soon as Possible ML19347B5701980-10-10010 October 1980 Demands,On Behalf of Ge,That NRC Return GE Reed Rept Immediately Due to NRC Denial of Request That Rept Be Withheld from Disclosure Under 10CFR2.790.Rept Must Not Be Placed in PDR ML19318B9751980-06-20020 June 1980 Advises That List of Matls to Be Used in Const of Fire Stops & Characteristics Re Flammability & Fire Retardancy Will Be Provided 1 Yr Subsequent to Receipt of CP ML19326D6371980-05-0505 May 1980 Opposes Const of Facilities Until Adequate Emergency Response Plan Can Be Developed.Recommends Responsibility for Emergency Response Plan Be Placed W/Independent Consulting Svc,Not State of Ok ML20126D3201980-04-0404 April 1980 Forwards Corp Commission of State of Ok 800403 Order Denying Request for Approval to Sell Bonds.Psc of Ok Presently Reviewing Order W/View of Filing Appeal W/Ok Supreme Court ML19309G5071980-04-0202 April 1980 Notifies That Representative of Intervenor State of Ok Will Attend NRC 800403 Meeting W/Cp Owners Group.Deplores Fact That Meeting Is First Interaction Between NRC & Applicants Re Development of Generic Policy ML20126D4031980-03-26026 March 1980 Forwards D Plant Expressing Concern Re Possible Meltdown at Facilities.Requests Response ML19309H4781980-03-26026 March 1980 Requests Response to Encl D&D Plant Request That Environ & Site Suitability Hearings in Licensing Proceeding Be Reopened to Address Class 9 Accidents ML18082A1641980-03-24024 March 1980 Forwards Licensee Supplemental Brief Re Motion for Directed Certification & for Stay.Pendency of Class 9 Issue Before Commission Noted in Licensee Motion for Directed Certification & for Stay.Discussed on Pages 7-10 ML19344D6921980-03-18018 March 1980 Submits Addl Info in Support of 800206 Request for Extension to Review ALAB-573 Class 9 Accident Issue.Lack of NRC Opposition to Ok Request & Recent Proliferation of Info Support Extension ML19309B5141980-03-15015 March 1980 Suggests Hearings on Const of Reactor Did Not Address Meltdown Issues.Tulsa Should Not Be Made Site for Potential Nuclear Mistake.Utils Should Build Plants Away from Populated Areas.Requests Reopening of Hearings ML19309B5241980-03-15015 March 1980 Requests That NRC Hold Meetings in Tulsa,Ok Re Emergency Evacuation Zone Around Nuclear Plants.Plans Should Be More Thorough to Protect People If Meltdown Should Occur ML20126C6161980-03-15015 March 1980 Expresses Concern Re NRC Refusal to Address Meltdown Issue at Hearings.Class 9 Accident Is Distinct Possibility & Should Be Thoroughly Examined.Environ & Site Suitablity Hearings Should Be Reopened ML20126C5581980-03-15015 March 1980 Suggests Local self-reliant,self-sufficient Communities Are Solution to Present Problems.Opposes All Forms of Nuclear Power.Min Amount of Energy from Coal & Gas Should Be Needed for Mfg Useful Tools,Bicycles & Efficient Tractors ML19312D4881980-02-29029 February 1980 Requests Reopening of Environ & Site Suitability Hearings for Facilities to Explore Issue of Meltdown ML20126C0301980-02-29029 February 1980 Urges Meetings in Tulsa,Ok Re Emergency Evacuation Area Around Facility.Current Plans Are Inadequate 1992-03-13 Category:UTILITY TO NRC MONTHYEARML20134E3211985-08-14014 August 1985
[Table view]Advises of Corporate Approval of Change in Planned Dates for Commercial Operation for coal-fired Inola Station,To Be Built on Site of Canceled Black Fox Station.Units 1 & 2 Scheduled for Completion in Dec 1996 & 1998,respectively ML20132B4151985-06-12012 June 1985 Forwards Application for Waiver of Withdrawal Fees Under 10CFR170.12(b).NRC Delays in Issuance of CPs Deprived Util of Opportunity to Effect Withdrawal Before 1981 Operative Date of Regulation Charging Withdrawal Fees ML20091R5721984-06-0808 June 1984 Requests Precise Delineation of Applicable Regulations & Accounting of Prof Staff Hours Expended Re Review Costs Charged for Withdrawal of CP Application.Waiver of Any Interest Penalty Requested ML20080F8011984-02-0303 February 1984 Requests Deletion of Gw Muench & Rl Range from Address Label ML20069D8691982-09-20020 September 1982 Forwards Black Fox Station Soil Stabilization & Erosion Control Program, Per ASLB 820618 Memorandum & Order.Plan Addresses Concerns Raised in NRC 820602 Submittal ML20054K1531982-06-23023 June 1982 Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects ML20041A5611982-02-16016 February 1982 Announces Cancellation of Black Fox Station,Confirming 820216 Verbal Notification.Site Will Be Preserved for Const of Future Power Generation Projects ML20039B7051981-12-11011 December 1981 Forwards Response to NRC 811203 Ltr Requesting Updated Info on Generic Issues A-10,A-31,A-36,A-42,A-43,A-44,A-45,A-46, A-47 & A-48 for SER Suppl.Svc List Encl ML20140B2771981-09-0909 September 1981 Forwards Amend 16 to Psar.Review Copies Forwarded w/810901 Ltr ML20140B2851981-09-0101 September 1981 Forwards Amend 16 to Psar.Remaining Copies Forthcoming.Amend Begins New Vol of Psar,Designated as Addendum I ML20009D9311981-07-0808 July 1981 Forwards Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). ML19318B9751980-06-20020 June 1980 Advises That List of Matls to Be Used in Const of Fire Stops & Characteristics Re Flammability & Fire Retardancy Will Be Provided 1 Yr Subsequent to Receipt of CP ML19294C2701980-02-28028 February 1980 Requests Opportunity to Discuss Priority of NRC CP Activities in post-TMI Period.Utils Are Concerned About Availability of NRC Resources in Coming Yr to Deal W/Related Hearings.Nrc Resources Can Be Optimized ML19305B4681980-02-0707 February 1980 Responds to NRC 800122 Ltr Re Deviation Noted in IE Insp Repts 50-556/80-01 & 50-557/80-01.Corrective Actions: Training Session on Fppm Procedures Will Be Presented to Employees Involved W/Matl Control Activities ML19290C6401979-12-12012 December 1979 Submits Analyses of Unit 2 Excavation Seal Involving Assessment of Mass Fill Strength of Lean Concrete as Foundation Matl.Fulfills Util 791019 Commitment.Requests Prompt Review & Authorization to Proceed Under LWA ML19260C1021979-12-12012 December 1979 Forwards Analyses Re Excavation Seal.Analyses Involve Assessment of Strength of Mass Fill of Lean Concrete Vs Natural Rock Structure & Effect on Dynamic Response of safety-related Structures ML19260A6201979-11-0101 November 1979 Responds to NRC 791016 Ltr Re Violations Noted in IE Insp Repts 50-556/79-04 & 50-557/79-04.Corrective Actions: Preventative Maint Record Forms Revised & Approved 791030 ML19210C3241979-10-19019 October 1979 Discusses Overexcavation of Unit 2 Foundation.Overexcavation Necessary to Remove Underlying Soft Siltstone Matl.Area Will Be Filled W/Concrete to Bring Excavation Surface Up to Design Grade ML19290C6451979-10-19019 October 1979 Updates & Confirms Conversations Re Unit 2 Excavation Authorized Under Amend 2 of Lwa.Moss Fill of Lean Concrete Will Be Required in Order to Comply W/Design Base Foundation Elevation.Analyses Will Be Submitted Upon Completion ML19260C1071979-10-19019 October 1979 Informs NRC of Delay in Preparation of Analyses Re Excavation Seal.Excavation Authorized Under Amend 3 of Lwa. to Bring Entire Structure Up to Design Base Elevation, Mass Fill of Lean Concrete Will Be Required ML19250A7341979-10-19019 October 1979 Updates & Confirms Conversations Re Excavation of Unit 2. Mass Fill of Lean Concrete Will Be Required to Bring Entire Excavation Up to Design Base Foundation Elevation.Analyses Will Be Provided for NRC Prior to Taking Action ML19250A4681979-10-12012 October 1979 Responds to 791010 Ltr Re NRC Position Re Status of TMI Review Efforts to Pending CP Applications.Commitments to NUREG-0578 Will Be Documented by Amend to PSAR Prior to Reopening of Hearings on Radiological Health & Safety ML19249B7851979-08-24024 August 1979 Responds to HR Denton 790820 Request & Clarifies 790727 & 0808 Submittals Re TMI Licensing Requirements ML19248D2711979-08-0808 August 1979 Clarifies Util 790727 Response to CP Requirements Re TMI-2. Analysis of Accidents & Anticipated Operational Occurrences Will Use Reg Guide 1.70,Revision 2.Util Will Maintain as-built Drawings ML19249F0191979-08-0808 August 1979 Discusses Util Intent Re SER Suppl.Util Analysis of Accidents & Anticipated Operational Occurences Will Use Reg Guide 1.70,Revision 2.TMI-related Commitments Will Be Included in Fsar.Certificate of Svc Encl ML19208D6721979-07-27027 July 1979 Forwards Supplemental, Response to NUREG-0578,App.A,TMI-2 Lessons Learned Task Force Short Term Recommendations. Certificate of Svc Encl ML19225C6281979-07-27027 July 1979 Responds to NUREG-0578, TMI-2 Lessons Learned Task Force Status Rept & Short-Term Recommendations, IE Bulletin 79-08 & Selected Emergency Preparedness Issues.Reiterates 790615 Analyses in New Format.Certificate of Svc Encl ML19225A8061979-07-11011 July 1979 Discusses Two Items of Concern in Connection w/780925 & 26 IE Insp of Station Environ Impact Control Procedures. Describes Method of Compliance Re Hydrological Monitoring Program & Transmission of Ecological Review ML19254B2651979-07-10010 July 1979 Requests Addl Const Activities Under 10CFR50.10(e)(1) Be Authorized at Site During Delay in Licensing Procedures Due to Tmi.Work Will Keep Onsite Forces Active & Help Avoid Costs of Const Demobilization & Restart ML19254B2701979-07-10010 July 1979 Supplements 790607 Ltr Re Status of Containment Vessel Design Alternatives.Forwards Black & Veatch 790706 Recommendation for Reducing Dynamic Loads on Piping Due to Containment Vessel Response ML19246B5411979-07-10010 July 1979 Requests Authorization for Certain Const Activities Not Usually Permitted Under Lwa,In Order to Take Up Slack Caused by Licensing Delay After TMI-2 Accident.Forwards List of Requested Const Activities ML19253A2201979-07-0303 July 1979 Discusses Contents of Overview Program for safety-related Concrete Activities ML19224C3501979-06-22022 June 1979 Forwards Two Oversized Engineering Drawings Showing Coordinates & Elevations of Water Transport Sys ML19254B2711979-06-0707 June 1979 Forwards Black & Veatch 790605 Ltr Re Status of Evaluation of Dynamic Loads Imposed Upon Piping Sys by Containment Vessel Responses ML19274E4751979-03-21021 March 1979 Forwards Loan Guarantee Commitments & Station Ownership Agreement in Response to NRC Request.Asks Receipt of Documents Be Noted in SER Suppl 2 & That No Financial Qualification Conditions Be Imposed on Const Permits ML19263C4341979-02-16016 February 1979 Submits Copies of Errata & Addendum Sheets of Amend 15 to PSAR & Responds to NRC Questions Re Amend.Areas Discussed Include Automatic Depressurization Sys & Results of Transient Analyses ML19263C3851979-02-13013 February 1979 Applicants Will Use square-root-sum-of-the-square Load Combination Methodology in Component Design & Use of Absolute Summation Method for Structures Design.Requests This Be Reflected in FSAR Suppl.W/Encl Suppl Matl ML19269C6111979-02-0202 February 1979 Forwards Amend 14 to PSAR to Update Various Areas of Operations ML19270F3401979-01-25025 January 1979 Ack Receipt of NRC 790116 Ltr Clarifying NRC Concern Over Completeness of Documentation.Forwards Copy of Ltr to Make Docket Complete ML19274D1361979-01-0505 January 1979 Submits Info Re Qualification & Training of pre-operational & Startup Testing Personnel.Info Submitted to Clarify Matl in Amend 13 & Will Be Incorporated Into Amend 14 to PSAR ML19259A7561979-01-0202 January 1979 Responds to 781206 Reminder to Provide NRC W/Accurate & Complete Info.Feels Ltr of Reprimand & Insinuation Is Unjustified & Insists on Clarification ML19305A1051978-12-29029 December 1978 Forwards Page 2 of Criteria for Combination of Earthquake &/Or Other Transient Responses Inadvertently Left Out of Some Copies Transmitted on 781220 from M Fate to SA Varga ML20148A7401978-12-21021 December 1978 Forwards Info Re Status of Excavation & Geomapping Effort for the Bfs Unit 1 Found.Compaction & Moisture Tests Will Be Performed Until 781229 ML19322A0671978-12-20020 December 1978 Forwards Newark-Kennedy Criteria for Combinations of Earthquake &/Or Other Transients Responses. Believes Criteria Justify Use of Square Root of the Sum of the Squares Methodology for Generic Nuclear Power Station Design ML20147H3511978-12-18018 December 1978 Repts Assessing Feasibility of Pursuing Initial Safety Related Constr Under LWA Ii.Should It Be Requested Various Activities Would Need to Be Performed Such as Installation of Underdrain Trenches in Excavation Seal ML20150E9091978-12-18018 December 1978 Forwards Results of an Analysis Performed to Investigate the Effects of LPCI Diversion on ECCS Performance.Rept Was Incl as Part of Amend 13 Originally Submitted in .Encl Analysis Will Be Submitted in Amend 14 ML20150E3491978-12-0707 December 1978 Responds to 781201 Request.Provides Sched for Excavating & Geomapping at Subj Facil.Requests Notification of Which Phases NRC Wishes to Observe ML19256A2921978-11-17017 November 1978 Submits amend#13 to Preliminary Safety Analysis Rept.Subj Covered:Ability of Ultimate Heat Sink to Withstand Tornado Missiles,Lpci Diversion Effects on ECCS Performance & Rev PSAR Figure 14.16a.W/cert of Svc ML20150C2061978-11-10010 November 1978 Forwards Copies of PSAR Figure 14.16a Showing Containment Elevator Pit Framing.Drawing Represents Current Design.Also Encl Is PSAR p.9.2-11 Showing Current Psok Position Re UHS Cooling Tower Design.Cert of Svc Encl ML20148J7321978-11-0707 November 1978 Responds to Informing NRC That Util Will Mod Design of UHS Cooling Tower to Provide Tornado Missile Protec to Fans & Discharge Nozzles.Design Mod Req Change in PSAR Sections 1.9 & 9.2 1985-08-14 |
Text
6212 DIN 5-023-029 PUBLIC SERVICE COMPANY OF OKLAHOMA A CENTRAL AND SOUTH WEST COMPANY PO BOX 201/ TULSA. OKLAHOMA 74102/(918)583 3611
$",f[y'[j%,,,,, File: 6212.213.6513.31L September 1, 1981 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Connnission Washington, D.C. 20555 Re: Public Service Company of Oklahoma Black Fox Station Units 1 and 2 Docket Nos. 50-556 and 50-557 Preliminary Safety Analysis Report Amendment 16 Gentlemen:
Public Service Company of Oklahoma herewith dockets three (3) official copies of Amendment No. 16 to its Preliminary Safety Analysis Report for the Black Fox Station Unitt 1 and 2. The remaining fifty-seven (57) copies will be forwarded to you upon receipt from the printer. These official copies were forwarded to you upon the request of Mr. Steve Ramos, Chief of the Emergency Preparedness Branch. Mr. Ramos stated he could begin his review of our emergency plan with the enclosed copies.
This amendment meets the requirements of Appendix E, 10 CFR Part 50 -
Emergency Planning and Preparedness for Production and Utilization Facilities. This amendment will begin a nev volume of the Preliminary Safety Analysis Report hereby designated Addendum I.
Instructions for it. .?rporating the material into the PSAR are provided.
Very truly yours, Mar' in E ate, .
Exe utive Vice President l
MEF/lg Enclosure xc: Steve L. Ramos 8109140140 810409 PDR ADOCK 05000556 B PDR CENTRAL AND SOUTH WEST SYSTEM got al Pgergn,d, Light gegege, Company of Oklahoma guthw torn Electnc Power ggt Tegs Ut;hties