ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
ML17146B174 | 3 August 1999 | GL 96-06 Risk Assessment for Sses. | Packing leak Mission time Stroke time Probabilistic Risk Assessment Large early release frequency Weak link |
ML20206D333 | 27 April 1999 | SER of Individual Plant Examination of External Events Submittal on Susquehanna Steam Electric Station,Units 1 & 2. Staff Notes That Licensee IPEEE Complete with Regard to Info Requested by Suppl 4 to GL 88-20 | Hot Short Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Tornado-Generated Missile Seismically rugged Earthquake Fire Protection Program Scaffolding |
ML20195B238 | 31 March 1999 | Redacted Version for 10CFR2.790 Request for Decommissioning Status Rept for Sses,Units 1 & 2 | |
ML17164A845 | 31 October 1998 | SSES Unit 1 Tenth Refueling & Insp Outage ISI Outage Summary Rept. | Hydrostatic Anchor Darling Squib VT-2 FLEX |
ML20236N675 | 9 July 1998 | Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps | |
ML20217Q489 | 21 April 1998 | Rev 1 to Draft LDCN 2482, FSAR Chapter 13.4 & FSAR Chapter 17.2 Changes to Support ITS Implementation | Offsite Dose Calculation Manual Nondestructive Examination Emergency Lighting Process Control Program Annual Radiological Effluent Release Report Fire Protection Program |
ML18026A493 | 30 March 1998 | LER 97-007-01:on 971017,entry Into TS 3.0.3 Occurred to Allow Completion of Surveillance Testing of One Channel of Rbm.Caused by Failure of Components in LPRM Output to Rbm. Submitted TS Change Request to Extend LCO Action Statement | |
ML18026A540 | 28 February 1998 | Monthly Operating Repts for Feb 1998 for Susquehanna Steam Electric Station.W/980313 Ltr | Safe Shutdown Offsite Dose Calculation Manual Anticipated operational occurrence Process Control Program Power change |
ML18026A489 | 17 November 1997 | LER 97-007-00:on 971017,TS 3.0.3 Entry Voluntarily Made. Caused by Inadequate Post Maint Testing Following Earlier Work Associated W/Components.Failed Components Repaired, Replaced & Testing Completed | Safe Shutdown Enforcement Discretion |
ML18017A292 | 28 October 1997 | 1997 Nrc/Fema Observed Exercise. | Safe Shutdown Reactor Vessel Water Level Half scram Squib Scram Discharge Volume Fuel cladding Fire Watch |
ML17158C186 | 5 June 1997 | Proceedings of Intl Topical Meeting on Advanced Reactors Safety Vol II, on 970601-05 | |
ML20140A966 | 29 May 1997 | Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum | Finite Element Analysis |
ML18026A478 | 28 March 1997 | Rev 1 to Application of Anfb to ATRIUM-10 for Susquehanna Reloads. | Anticipated operational occurrence |
ML20137G626 | 25 March 1997 | Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber | Finite Element Analysis |
ML20155F766 | 25 July 1996 | Partially Deleted Job Number 739619-96, Investigation of E Diesel Breaker Misalignment | |
ML20155F749 | 24 July 1996 | Independent Safety Evaluation Svcs Project Rept 3-96, Investigation of E Diesel Generator In-Operability Event | Safe Shutdown |
ML20117G464 | 14 May 1996 | Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs | |
ML18026A596 | 2 January 1996 | LER 95-013-00:on 951119,thermally Induced Pressure Locking of HPCI Valve Occurred Under Bonnet Pressure of 3,000-7,000 Psig.Damaged HPCI Injection Valve repaired.W/960102 Ltr | Anchor Darling |
ML18017A051 | 30 November 1995 | Monthly Operating Repts for Nov 1995 for SSES Units 1 & 2. W/951215 Ltr | Offsite Dose Calculation Manual |
ML20092H764 | 31 August 1995 | Monthly Operating Repts for Aug 1995 for Susquehanna Ses | Offsite Dose Calculation Manual |
ML17158A877 | 15 August 1995 | Exercise Manual. | Squib Scram Discharge Volume Earthquake Fuel cladding |
ML17158A806 | 14 July 1995 | Books 1 & 2 of ISI Outage Summary Rept SSES Unit 1 8th Refuel Outage. | Packing leak Hydrostatic Anchor Darling VT-2 FLEX |
ML18017A046 | 7 July 1995 | LER 95-008-00:on 950609,shift Average Licensed Core Thermal Power Was Exceeded.Caused by Failed Instrumentation Drift. Repaired & Recalibrated Subject Instrumentation | |
ML17164A663 | 11 April 1995 | Impact of Extending T-10 AOT from 3 to 7 Days. | High winds |
ML17164A587 | 31 January 1995 | Monthly Operating Repts for Jan 1995 for Susquehanna Ses | Offsite Dose Calculation Manual |
ML18026A535 | 31 October 1994 | SSES Unit 1 & 2 MSIV Leakage Alternate Treatment Method Seismic Evaluation. W/One Oversize Drawing | Seismically rugged Design basis earthquake Earthquake |
ML17158A482 | 23 August 1994 | ISI Outage Summary Rept Unit 2 6th Refueling Outage, Books 1 & 2 of 2 | Hydrostatic Coatings VT-2 |
ML17158A239 | 5 April 1994 | Books 1 & 2 of SSES Unit 1 Seventh Refueling & Insp Outage ISI Outage Summary Rept. | Hydrostatic Coatings VT-2 |
ML17158A265 | 31 December 1993 | Allegheny Electric Cooperative,Inc Annual Rept 1993. | |
ML18017A270 | 31 December 1993 | PP&L Annual Rept 1993. | Fatality |
ML17158A163 | 9 December 1993 | Remote Indication of Spent Fuel Pool Level & Temperature. | Safe Shutdown |
ML18026A428 | 16 August 1993 | PP&L Response to NRC Concerns Re Loss of Spent Fuel Pool Cooling Following Loca,Sses,Units 1 & 2. | Ultimate heat sink Time to boil |
ML18026A426 | 9 June 1993 | LER 90-007-01:on 900705,primary Power Supply to RPS a Power Distribution Panel Lost When One Electrical Protection Assembly (EPA) Breaker Tripped.Epa Logic Cards Reviewed & RPS Power Supply Will Be redesigned.W/930609 Ltr | |
ML17157C244 | 28 February 1993 | Monthly Operating Rept for Feb 1993 for Susquehanna Steam Electric Station,Units 1 & 2 | |
ML18017A203 | 1 February 1993 | Books 1 & 2 of Unit 2 Fifth Refueling & Insp Outage,Isi Outage Summary Rept. | Hydrostatic Anchor Darling Squib VT-2 FLEX |
ML20044C274 | 31 January 1993 | Corrected Monthly Operating Rept for Jan 1993 for Susquehanna Steam Electric Station,Unit 2,consisting of Info on Unit Shutdowns & Power Reductions | |
ML17157C369 | 31 December 1992 | PP&L Annual Rept 1992. | Systematic Assessment of Licensee Performance |
ML20056C394 | 31 December 1992 | Allegheny Electric Cooperative,Inc Annual Rept 1992 | |
ML18017A042 | 14 December 1992 | Suppl to 921127 Part 21 Rept Re High Air Concentration in Reactor Bldg Making Area Uninhabitable for Retrieving Air Filters,Per NUREG-0737,Item II.F.1.Util Current Position Re Fuel Pool Cooling Issues Contrary to Reg Guide 1.3 | |
ML18026A248 | 27 November 1992 | Part 21 Rept Re Substantial Safety Hazard in Design of Facility for Loss of Normal Spent Fuel Pool Cooling | Safe Shutdown Unanalyzed Condition Ultimate heat sink Anticipated operational occurrence Time to boil Safe Shutdown Earthquake Emergency Lighting Operability Determination Power Uprate |
ML18026A423 | 17 November 1992 | LER 92-016-00:on 920416,discovered That Existing Analysis for Two Spent Fuel Storage Pools Did Not Reflect Current Fuel Design & Plant Operation.Caused by Failure to Modify FSAR Analysis.Fsar Will Be revised.W/921117 Ltr | Shutdown Margin |
ML17157C142 | 21 October 1992 | Engineering Assessment of Fuel Pool Cooling Piping EDR-G20020. | Safe Shutdown Unanalyzed Condition Ultimate heat sink Time to boil Safe Shutdown Earthquake Earthquake Fuel cladding Operability Assessment Power Uprate |
ML17157C140 | 31 August 1992 | Review of Fuel Pool Cooling During Postulated Off-Normal & Accident Events SSES Units 1 & 2. | Safe Shutdown Unanalyzed Condition Ultimate heat sink Time to boil Safe Shutdown Earthquake Operability Determination Spent Fuel Pool Instrumentation Earthquake Fuel cladding Power Uprate |
ML17157C141 | 31 August 1992 | Loss of Fuel Pool Cooling Event Evaluation. | Ultimate heat sink Time to boil Earthquake Fuel cladding |
ML20082C494 | 14 August 1992 | Evaluation of Unit 1 & Unit 2 Derating of Power Cables in Raceways Wrapped W/Thermo-Lag Matl | |
ML17157C138 | 27 July 1992 | Safety Consequences of Boiling Spent Fuel Pool at Susquehanna Steam Electric Station. | Safe Shutdown Unanalyzed Condition Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Emergency Lighting Condition Adverse to Quality Earthquake Power Uprate Overexposure |
ML17157B933 | 24 July 1992 | Sixth Refueling & Insp Outage Inservice Insp Outage Summary Rept, Books 1 & 2 | Hydrostatic VT-2 FLEX |
ML20097D468 | 31 December 1991 | Pennsylvania Power & Light Company,1991 Annual Rept | |
ML18017A039 | 26 July 1991 | LER 91-010-00:on 910628,RWCU Isolated on Two Occassions Due to Actuations of Steam Leak Detection Instrumentation. Caused by Design Deficiency & Elevated Ambient Penetration Room Temps.Temp Modules replaced.W/910726 Ltr |