Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217E33830 September 1999Monthly Operating Repts for Sept 1999 for Songs,Units 2 & 3
ML20217E26930 September 1999Monthly Operating Rept for Sept 1999 for Callaway Plant,Unit 1.With
ML20217A99330 September 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data
ML20217G44630 September 1999Monthly Operating Repts for Sept 1999 for Pingp.With
ML20217A16922 September 1999Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers
ML20212A33614 September 19991999 Biennial RERP Exercise, for Callaway Plant. Pages 7,8 & 9 (of 9) in Mini Scenario 1 Section of Incoming Submittal Not Included
ML20212D07114 September 1999Safety Evaluation Re GL 88-20, Individual Plant Exam for Severe Accident VulnerabilitiesHot Short
Safe Shutdown
High winds
Fire Barrier
Safe Shutdown Earthquake
Earthquake
ML20212A14713 September 1999Special Rept:On 990904,condenser Monitor Was Declared Inoperable.Difficulties Encountered During Component Replacement Precluded SCE from Restoring Monitor to Service within 72 H.Alternate Method of Monitoring Was Established
ML20211N0513 September 1999SER Approving Exemption from Certain Requirements of 10CFR50.44 & 10CFR50 App A,General Design Criterion 41 to Remove Requirements from Hydrogen Control Systems from SONGS Units 2 & 3 Design BasisSevere Accident Management Guideline
Exemption Request
Fuel cladding
ML20211N0452 September 1999Safety Evaluation Concluding That Util Has Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant That Are Susceptible to Pressure Locking & BindingSafe Shutdown
Power-Operated Valves
Backfit
ML20216E71531 August 1999Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with
ML20212A02031 August 1999Monthly Operating Rept for Aug 1999 for Callaway Plant,Unit 1.With
ML20211Q82031 August 1999Monthly Operating Repts for Aug 1999 for Songs,Units 2 & 3. with
ML20211D39824 August 1999Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectivelyPower-Operated Valves
Backfit
ML20211H86223 August 1999Safety Evaluation Accepting Licensee Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI IntervalCoatings
ML20210P47911 August 1999COLR Cycle 10 Songs,Unit 3Shutdown Margin
Anticipated operational occurrence
Fuel cladding
ML20210P47311 August 1999COLR Cycle 10 Songs,Unit 2Shutdown Margin
Anticipated operational occurrence
Fuel cladding
ML20210P04410 August 1999Safety Evaluation Granting Licensee Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code,For Second 10-year Interval ISI at Plant,Unit 1VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML20210Q8335 August 1999Rev 4 to Callaway Cycle 10 Colr
ML20211C2534 August 1999Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526Boric Acid
Hydrostatic
Nondestructive Examination
VT-2
ML20210T9483 August 1999Informs Commission Re Status of Issues Related to Risk Informed Decision Making That Were Raised During Staff Review of License Amend Approving Electrosleeve SG Tube Repair Method for Ue Callaway Plant,Unit 1Probabilistic Risk Assessment
Large early release frequency
ML20210T44531 July 1999Monthly Operating Rept for July 1999 for Callaway Plant,Unit 1.With
ML20216D87931 July 1999Rev 3 to Callaway Cycle 10 Colr
ML20211B59731 July 1999Cycle 20 Voltage-Based Repair Criteria 90-Day Rept
ML20210Q48931 July 1999Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with
ML20210Q65231 July 1999Monthly Operating Repts for July 1999 for Songs,Units 2 & 3
ML20210H65330 July 1999SER Accepting Relief Request to Second Ten Year Inservice Insp Plant for Plant,Unit 1Boric Acid
High Radiation Area
Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Scaffolding
ML20210L27730 July 1999SONGS Unit 3 ISI Summary Rept 2nd Interval,2nd Period Cycle 10 Refueling Outage U3C10 Site Technical ServicesNondestructive Examination
VT-2
Liquid penetrant
ML20209J11315 July 1999Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing ActionsShutdown Margin
ML20209H08830 June 1999Monthly Operating Rept for June 1999 for Callaway Plant,Unit 1.With
ML20196H86230 June 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 ReptHigh Radiation Area
Power change
ML20209C92830 June 1999Monthly Operating Repts for June 1999 for Songs,Units 2 & 3. with
ML20209F98130 June 1999Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With
ML20196F40823 June 1999Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI UnitsShutdown Margin
ML20195D3062 June 1999Safety Evaluation of TR SCE-9801-P, Reload Analysis Methodology for San Onofre Nuclear Generating Station,Units 2 & 3. Rept AcceptableShutdown Margin
Job Performance Measure
ML20195H54931 May 1999Monthly Operating Rept for May 1999 for Songs,Units 2 & 3
ML20195G51831 May 1999Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not IncludedHydrostatic
ML20195H48331 May 1999Monthly Operating Rept for May 1999 for Callaway Plant,Unit 1.With
ML20207B59326 May 1999SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMsHigh Radiation Area
Hydrostatic
VT-2
Liquid penetrant
ML20196L25013 May 1999Rev 0 to PINGP Unit 1 COLR Cycle 20
ML20196L32211 May 1999SONGS Unit 2 ISI Summary Rept 2nd Interval,2nd Period Cycle-10 Refueling OutageBoric Acid
Fire Barrier
Hydrostatic
Nondestructive Examination
VT-2
Code Reconciliation
Maintenance Rule Program
Liquid penetrant
Scaffolding
ML20206H2615 May 1999Part 21 Rept Re Defect Found in Potter & Brumfield Relays. Sixteen Relays Supplied in Lot 913501 by Vendor as Commercial Grade Items.Caused by Insufficient Contact Pad Welding.Relays Replaced with New Relays
ML20206S72830 April 1999Monthly Operating Repts for Apr 1999 for Songs,Units 2 & 3
ML20206L61930 April 1999Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with
ML20206R71130 April 1999Monthly Operating Rept for Apr 1999 for Callaway Plant Unit 1.With
ML20205Q62219 April 1999Safety Evaluation Authorizing Proposed Alternative to Use Wire Penetrameters for ISI Radiography in Place of ASME Code RequirementIncorporated by reference
ML20205Q55619 April 1999Safety Evaluation Accepting Relief for Request from Certain ASME Section Requirements for Containment Insp
ML20205R03716 April 1999SER Approving Proposed Deviation from Approved Fire Protection Program Incorporating Technical Requirements of 10CFR50,App R,Section III.0 That Applies to RCP Oil Fill PipingSafe Shutdown
Fire Protection Program
ML20205G2611 April 1999Special Rept:On 990328,3RT-7865 Was Removed from Service. Monitor Is Scheduled to Be Returned to Service Prior to Mode 4 Entry (Early May 1999) Which Will Exceed 72 H Allowed by LCS 3.3.102.Alternate Method of Monitoring Will Be Used
ML20205Q09831 March 1999Monthly Operating Repts for Mar 1999 for Songs,Units 2 & 3