Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217E338 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Songs,Units 2 & 3 | |
ML20217E269 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Callaway Plant,Unit 1.With | |
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
ML20217G446 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Pingp.With | |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20212A336 | 14 September 1999 | 1999 Biennial RERP Exercise, for Callaway Plant. Pages 7,8 & 9 (of 9) in Mini Scenario 1 Section of Incoming Submittal Not Included | |
ML20212D071 | 14 September 1999 | Safety Evaluation Re GL 88-20, Individual Plant Exam for Severe Accident Vulnerabilities | Hot Short Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Earthquake |
ML20212A147 | 13 September 1999 | Special Rept:On 990904,condenser Monitor Was Declared Inoperable.Difficulties Encountered During Component Replacement Precluded SCE from Restoring Monitor to Service within 72 H.Alternate Method of Monitoring Was Established | |
ML20211N051 | 3 September 1999 | SER Approving Exemption from Certain Requirements of 10CFR50.44 & 10CFR50 App A,General Design Criterion 41 to Remove Requirements from Hydrogen Control Systems from SONGS Units 2 & 3 Design Basis | Severe Accident Management Guideline Exemption Request Fuel cladding |
ML20211N045 | 2 September 1999 | Safety Evaluation Concluding That Util Has Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant That Are Susceptible to Pressure Locking & Binding | Safe Shutdown Power-Operated Valves Backfit |
ML20216E715 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with | |
ML20212A020 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Callaway Plant,Unit 1.With | |
ML20211Q820 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Songs,Units 2 & 3. with | |
ML20211D398 | 24 August 1999 | Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectively | Power-Operated Valves Backfit |
ML20211H862 | 23 August 1999 | Safety Evaluation Accepting Licensee Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval | Coatings |
ML20210P479 | 11 August 1999 | COLR Cycle 10 Songs,Unit 3 | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML20210P473 | 11 August 1999 | COLR Cycle 10 Songs,Unit 2 | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML20210P044 | 10 August 1999 | Safety Evaluation Granting Licensee Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code,For Second 10-year Interval ISI at Plant,Unit 1 | VT-2 Incorporated by reference Liquid penetrant Dissimilar Metal Weld |
ML20210Q833 | 5 August 1999 | Rev 4 to Callaway Cycle 10 Colr | |
ML20211C253 | 4 August 1999 | Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526 | Boric Acid Hydrostatic Nondestructive Examination VT-2 |
ML20210T948 | 3 August 1999 | Informs Commission Re Status of Issues Related to Risk Informed Decision Making That Were Raised During Staff Review of License Amend Approving Electrosleeve SG Tube Repair Method for Ue Callaway Plant,Unit 1 | Probabilistic Risk Assessment Large early release frequency |
ML20210T445 | 31 July 1999 | Monthly Operating Rept for July 1999 for Callaway Plant,Unit 1.With | |
ML20216D879 | 31 July 1999 | Rev 3 to Callaway Cycle 10 Colr | |
ML20211B597 | 31 July 1999 | Cycle 20 Voltage-Based Repair Criteria 90-Day Rept | |
ML20210Q489 | 31 July 1999 | Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with | |
ML20210Q652 | 31 July 1999 | Monthly Operating Repts for July 1999 for Songs,Units 2 & 3 | |
ML20210H653 | 30 July 1999 | SER Accepting Relief Request to Second Ten Year Inservice Insp Plant for Plant,Unit 1 | Boric Acid High Radiation Area Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Scaffolding |
ML20210L277 | 30 July 1999 | SONGS Unit 3 ISI Summary Rept 2nd Interval,2nd Period Cycle 10 Refueling Outage U3C10 Site Technical Services | Nondestructive Examination VT-2 Liquid penetrant |
ML20209J113 | 15 July 1999 | Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing Actions | Shutdown Margin |
ML20209H088 | 30 June 1999 | Monthly Operating Rept for June 1999 for Callaway Plant,Unit 1.With | |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
ML20209C928 | 30 June 1999 | Monthly Operating Repts for June 1999 for Songs,Units 2 & 3. with | |
ML20209F981 | 30 June 1999 | Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With | |
ML20196F408 | 23 June 1999 | Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units | Shutdown Margin |
ML20195D306 | 2 June 1999 | Safety Evaluation of TR SCE-9801-P, Reload Analysis Methodology for San Onofre Nuclear Generating Station,Units 2 & 3. Rept Acceptable | Shutdown Margin Job Performance Measure |
ML20195H549 | 31 May 1999 | Monthly Operating Rept for May 1999 for Songs,Units 2 & 3 | |
ML20195G518 | 31 May 1999 | Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included | Hydrostatic |
ML20195H483 | 31 May 1999 | Monthly Operating Rept for May 1999 for Callaway Plant,Unit 1.With | |
ML20207B593 | 26 May 1999 | SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMs | High Radiation Area Hydrostatic VT-2 Liquid penetrant |
ML20196L250 | 13 May 1999 | Rev 0 to PINGP Unit 1 COLR Cycle 20 | |
ML20196L322 | 11 May 1999 | SONGS Unit 2 ISI Summary Rept 2nd Interval,2nd Period Cycle-10 Refueling Outage | Boric Acid Fire Barrier Hydrostatic Nondestructive Examination VT-2 Code Reconciliation Maintenance Rule Program Liquid penetrant Scaffolding |
ML20206H261 | 5 May 1999 | Part 21 Rept Re Defect Found in Potter & Brumfield Relays. Sixteen Relays Supplied in Lot 913501 by Vendor as Commercial Grade Items.Caused by Insufficient Contact Pad Welding.Relays Replaced with New Relays | |
ML20206S728 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Songs,Units 2 & 3 | |
ML20206L619 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with | |
ML20206R711 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Callaway Plant Unit 1.With | |
ML20205Q622 | 19 April 1999 | Safety Evaluation Authorizing Proposed Alternative to Use Wire Penetrameters for ISI Radiography in Place of ASME Code Requirement | Incorporated by reference |
ML20205Q556 | 19 April 1999 | Safety Evaluation Accepting Relief for Request from Certain ASME Section Requirements for Containment Insp | |
ML20205R037 | 16 April 1999 | SER Approving Proposed Deviation from Approved Fire Protection Program Incorporating Technical Requirements of 10CFR50,App R,Section III.0 That Applies to RCP Oil Fill Piping | Safe Shutdown Fire Protection Program |
ML20205G261 | 1 April 1999 | Special Rept:On 990328,3RT-7865 Was Removed from Service. Monitor Is Scheduled to Be Returned to Service Prior to Mode 4 Entry (Early May 1999) Which Will Exceed 72 H Allowed by LCS 3.3.102.Alternate Method of Monitoring Will Be Used | |
ML20205Q098 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Songs,Units 2 & 3 |