Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20148U01117 June 1997Confirmatory Survey of Group E Effluent Discharge Pathway Areas Fsv Nuclear Station Platteville,Co
ML20133D76616 September 1996Confirmatory Survey Plan for Fsv Nuclear Station Decommissioning Project
ML20129A46211 September 1996Rev 0 to Fsv Decommissioning Project Final Survey Requirements for Liquid Effluent PathwayOffsite Dose Calculation Manual
Chernobyl
ML20097C26017 January 1996Confirmatory Survey Activities Plan for Fsv Nuclear Station PSC Platteville,Co
ML20101F20918 September 1995Issue 7 to DPP 5.4.2, OdcmGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML20084B88025 May 1995Rev 1 to Fsv Nuclear Station Decommissioning Project Final Survey Plan for Site ReleaseCoatings
Deep Dose Equivalent
Scaffolding
ML20084B68810 May 1995Issue 5 to Fire Protection Operability Requirements (Fpor) FPOR-7, Fire ExtinguishersFire Barrier
Emergency Lighting
ML20082T21512 April 1995Issue 7 to Fire Protection Operability Requirements (Fpor) FPOR-12, Fire DetectorsFire Barrier
Emergency Lighting
Fire Protection Program
Fire Watch
Hourly Fire Watch
ML20082B94117 March 1995Confirmatory Survey Plan for Repower Area,Fort St Vrain, Platteville,Co
ML20082C08016 March 1995Proposed Confirmatory Survey Plan for Repower Area,Fort St Vrain,Platteville,Co
ML20082B98215 March 1995Instrumentation Comparison Plan Between Orise & Fort St Vrain
ML20086S2479 February 1995Decommissioning Plan for Fort St Vrain Nuclear Generating StationHigh Radiation Area
Offsite Dose Calculation Manual
Tornado Missile
Operating Basis Earthquake
Design basis earthquake
Earthquake
Fire Protection Program
Scaffolding
ML20077C71730 November 1994Issue 9 to FPOR-14, Fire Protection Operability RequirementsFire Barrier
Emergency Lighting
Fire Watch
Hourly Fire Watch
ML20078C06412 October 1994Revised Fire Protection Operability Requirements,Including Issue 21 to Depp Table of Contents,Issue 2 to FPOR-22 & Issue 3 to FPOR-23Fire Barrier
Emergency Lighting
ML20081J79515 September 1994Issue 5 to DPP 5.4.2, OdcmGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML20063M15517 February 1994Rev 0 to Fsv Nuclear Station Decommissioning Project Final Survey Plan for Site ReleaseCoatings
ML20057A61530 August 1993Issue 2 to FPOR-23, Fire Water Makeup SysFire Barrier
Emergency Lighting
ML20079M42611 October 1991Revised Abnormal Operating Procedures,Reflecting Deletion of Issue 9 of EP ClassPower change
ML20082H88516 August 1991Issue 2 to Abnormal Operating Procedure AOP-I-2, Chemical, Petroleum & Hazardous Waste Spill ResponseEarthquake
Power change
ML20091C4142 August 1991Issue 58 to Abnormal Operating Procedure AOP-L, Loss of Instrument Air HeaderEarthquake
Power change
ML20024H33410 May 1991Nonproprietary Rev 2 to FSV-P-SCP-100, Fort St Vrain Initial Radiological Site Characterization Program Program DescriptionChernobyl
ML20072V52912 April 1991Revised Defueling Emergency Response Plan,Including Section 1 Definitions,Section 2 Scope & Applicability,Section 3 Summary of Fsv Derp,Section 4 Emergency Classifications & Section 5 Emergency OrganizationSafe Shutdown
Unanalyzed Condition
High winds
Shutdown Margin
Earthquake
Fire Protection Program
Fatality
ML20070V68720 March 1991Issue 55 to Abnormal Operating Procedure AOP-R, Loss of Access to Control RoomEarthquake
Power change
ML20072S05215 March 1991Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 9 to CMIP-11, Classification of Emergency for McGuire Nuclear Station & Rev 11 to CMIP-12, Classification of Emergency for Oconee Nuclear StationEarthquake
ML20066J11715 February 1991Issue 56 to Intro Section of Abnormal Operating Procedure (Aop),Issue 58 of AOP-A,Issue 58 to AOP-B,Issue 56 of AOP D-1 & Issue 2 of RERP-TRANSPORTATIONEarthquake
Power change
Coast down
ML20058N10710 August 1990Issue 56 to AOP-I, Discussion of FireEarthquake
Power change
ML20154M4369 September 1988Rev a to EE-FP-0005, Evaluation of Cable Trays Outside of Congested Cable Area
ML20154L87526 May 1988Simulation Facility Program Plan
ML20154L89131 March 1988Rev 2 to Guidance for Development of Simulation Facility to Meet Requirements of 10CFR55.45Safe Shutdown
Emergency Lighting
ML20148Q46831 March 1988Rev 2 to Guidance for Development of Simulation Facility to Meet Requirements of 10CFR55.45Emergency Lighting
ML20150E31418 March 1988Issue 1 to Procedure SR 5.4.1.3.8.abcd-R1, Steam Line Rupture Detection/Isolation Sys (Slrdis) Calibr & Testing for Panel I-93543
ML20150E29031 December 1987Issue 5 to Procedure SR 5.3.4b1-A Loop I Shutdown Cooling Power Operated Valve TestSafe Shutdown
Stroke time
Power Operated Valves
ML20238E3547 August 1987Rev a to EE-ISI-002, Condensate Line Erosion Insp Program
ML20236N8685 August 1987Exercise Manual Fort St Vrain Nuclear Generating Station Nrc/Fema Graded Exercise 870805
ML20235Y78629 July 1987Issue 2 to MAP-4, Maint Dept Personnel Experience, Qualification & Training Requirements
ML20237J6929 June 1987Issue 6 to MQCIM-1, Maint QC Insp Program. Annotated Page to Rev 4 to Updated FSAR Encl
ML20235Y77325 May 1987Training Mgt Procedure Index
ML20237J7151 May 1987Issue 12 to Q-18, QA Monitoring & Audit Program
ML20215H97330 April 1987Revised Buckle Users Manual:Creep Collapse of Thin-Walled Circular Cylindrical Shells Subj to Radial Pressure & Thermal Gradients
ML20215H61010 April 1987Program Plan for Integrated Validation of NUREG-0737 Initiatives
ML20215H60310 April 1987SOAP-2,Issue 1 of Guidelines for Preparation of Emergency ProceduresSafe Shutdown
ML20215H59510 April 1987Procedures Generation Package:Public Svc Co of Colorado Fort St Vrain Nuclear Generating StationJob Performance Measure
ML20150E30420 March 1987Issue 1 to Procedure SR 5.4.1.3.8.abcd-R2, Steam Line Rupture Detection/Isolation Sys (Slrdis) Calibr & Testing for Panel I-93544
ML20237J72320 February 1987Issue 5 to QAAP-1, Planning & Scheduling Fort St Vrain QA AuditsFire Protection Program
ML20212B30815 February 1987Issue 7 to Procedure G-9, Controlled Work ProceduresFire Watch
ML20210E3003 February 1987Revised Administration Procedures Consisting of Issue 7 to G-3, Action Request-Preparation & Processing, Issue 21 to G-2, Fort St Vrain Procedure Sys & Issue 6 to G-6, Compliance w/10CFR21 Requirements
ML20210A75730 January 1987Fort St Vrain 1987 Power Ascension Plan
ML20237J74219 January 1987QA Audit QAA-502-87-01, Audit Plan - QA Program for Transport of Radioactive Matls
ML20212B28524 October 1986Issue 10 to Procedure Q-3, Design Control SysSafe Shutdown
ML20238E3462 October 1986Rev C to EE-ISI-0001, Extraction Steam Lines & Turbine Vent & Drain Lines Erosion Insp Program