Issue date | Title | Topic | |
---|---|---|---|
ML20148U011 | 17 June 1997 | Confirmatory Survey of Group E Effluent Discharge Pathway Areas Fsv Nuclear Station Platteville,Co | |
ML20133D766 | 16 September 1996 | Confirmatory Survey Plan for Fsv Nuclear Station Decommissioning Project | |
ML20129A462 | 11 September 1996 | Rev 0 to Fsv Decommissioning Project Final Survey Requirements for Liquid Effluent Pathway | Offsite Dose Calculation Manual Chernobyl |
ML20097C260 | 17 January 1996 | Confirmatory Survey Activities Plan for Fsv Nuclear Station PSC Platteville,Co | |
ML20101F209 | 18 September 1995 | Issue 7 to DPP 5.4.2, Odcm | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML20084B880 | 25 May 1995 | Rev 1 to Fsv Nuclear Station Decommissioning Project Final Survey Plan for Site Release | Coatings Deep Dose Equivalent Scaffolding |
ML20084B688 | 10 May 1995 | Issue 5 to Fire Protection Operability Requirements (Fpor) FPOR-7, Fire Extinguishers | Fire Barrier Emergency Lighting |
ML20082T215 | 12 April 1995 | Issue 7 to Fire Protection Operability Requirements (Fpor) FPOR-12, Fire Detectors | Fire Barrier Emergency Lighting Fire Protection Program Fire Watch Hourly Fire Watch |
ML20082B941 | 17 March 1995 | Confirmatory Survey Plan for Repower Area,Fort St Vrain, Platteville,Co | |
ML20082C080 | 16 March 1995 | Proposed Confirmatory Survey Plan for Repower Area,Fort St Vrain,Platteville,Co | |
ML20082B982 | 15 March 1995 | Instrumentation Comparison Plan Between Orise & Fort St Vrain | |
ML20086S247 | 9 February 1995 | Decommissioning Plan for Fort St Vrain Nuclear Generating Station | High Radiation Area Offsite Dose Calculation Manual Tornado Missile Operating Basis Earthquake Design basis earthquake Earthquake Fire Protection Program Scaffolding |
ML20077C717 | 30 November 1994 | Issue 9 to FPOR-14, Fire Protection Operability Requirements | Fire Barrier Emergency Lighting Fire Watch Hourly Fire Watch |
ML20078C064 | 12 October 1994 | Revised Fire Protection Operability Requirements,Including Issue 21 to Depp Table of Contents,Issue 2 to FPOR-22 & Issue 3 to FPOR-23 | Fire Barrier Emergency Lighting |
ML20081J795 | 15 September 1994 | Issue 5 to DPP 5.4.2, Odcm | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML20063M155 | 17 February 1994 | Rev 0 to Fsv Nuclear Station Decommissioning Project Final Survey Plan for Site Release | Coatings |
ML20057A615 | 30 August 1993 | Issue 2 to FPOR-23, Fire Water Makeup Sys | Fire Barrier Emergency Lighting |
ML20079M426 | 11 October 1991 | Revised Abnormal Operating Procedures,Reflecting Deletion of Issue 9 of EP Class | Power change |
ML20082H885 | 16 August 1991 | Issue 2 to Abnormal Operating Procedure AOP-I-2, Chemical, Petroleum & Hazardous Waste Spill Response | Earthquake Power change |
ML20091C414 | 2 August 1991 | Issue 58 to Abnormal Operating Procedure AOP-L, Loss of Instrument Air Header | Earthquake Power change |
ML20024H334 | 10 May 1991 | Nonproprietary Rev 2 to FSV-P-SCP-100, Fort St Vrain Initial Radiological Site Characterization Program Program Description | Chernobyl |
ML20072V529 | 12 April 1991 | Revised Defueling Emergency Response Plan,Including Section 1 Definitions,Section 2 Scope & Applicability,Section 3 Summary of Fsv Derp,Section 4 Emergency Classifications & Section 5 Emergency Organization | Safe Shutdown Unanalyzed Condition High winds Shutdown Margin Earthquake Fire Protection Program Fatality |
ML20070V687 | 20 March 1991 | Issue 55 to Abnormal Operating Procedure AOP-R, Loss of Access to Control Room | Earthquake Power change |
ML20072S052 | 15 March 1991 | Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 9 to CMIP-11, Classification of Emergency for McGuire Nuclear Station & Rev 11 to CMIP-12, Classification of Emergency for Oconee Nuclear Station | Earthquake |
ML20066J117 | 15 February 1991 | Issue 56 to Intro Section of Abnormal Operating Procedure (Aop),Issue 58 of AOP-A,Issue 58 to AOP-B,Issue 56 of AOP D-1 & Issue 2 of RERP-TRANSPORTATION | Earthquake Power change Coast down |
ML20058N107 | 10 August 1990 | Issue 56 to AOP-I, Discussion of Fire | Earthquake Power change |
ML20154M436 | 9 September 1988 | Rev a to EE-FP-0005, Evaluation of Cable Trays Outside of Congested Cable Area | |
ML20154L875 | 26 May 1988 | Simulation Facility Program Plan | |
ML20154L891 | 31 March 1988 | Rev 2 to Guidance for Development of Simulation Facility to Meet Requirements of 10CFR55.45 | Safe Shutdown Emergency Lighting |
ML20148Q468 | 31 March 1988 | Rev 2 to Guidance for Development of Simulation Facility to Meet Requirements of 10CFR55.45 | Emergency Lighting |
ML20150E314 | 18 March 1988 | Issue 1 to Procedure SR 5.4.1.3.8.abcd-R1, Steam Line Rupture Detection/Isolation Sys (Slrdis) Calibr & Testing for Panel I-93543 | |
ML20150E290 | 31 December 1987 | Issue 5 to Procedure SR 5.3.4b1-A Loop I Shutdown Cooling Power Operated Valve Test | Safe Shutdown Stroke time Power Operated Valves |
ML20238E354 | 7 August 1987 | Rev a to EE-ISI-002, Condensate Line Erosion Insp Program | |
ML20236N868 | 5 August 1987 | Exercise Manual Fort St Vrain Nuclear Generating Station Nrc/Fema Graded Exercise 870805 | |
ML20235Y786 | 29 July 1987 | Issue 2 to MAP-4, Maint Dept Personnel Experience, Qualification & Training Requirements | |
ML20237J692 | 9 June 1987 | Issue 6 to MQCIM-1, Maint QC Insp Program. Annotated Page to Rev 4 to Updated FSAR Encl | |
ML20235Y773 | 25 May 1987 | Training Mgt Procedure Index | |
ML20237J715 | 1 May 1987 | Issue 12 to Q-18, QA Monitoring & Audit Program | |
ML20215H973 | 30 April 1987 | Revised Buckle Users Manual:Creep Collapse of Thin-Walled Circular Cylindrical Shells Subj to Radial Pressure & Thermal Gradients | |
ML20215H610 | 10 April 1987 | Program Plan for Integrated Validation of NUREG-0737 Initiatives | |
ML20215H603 | 10 April 1987 | SOAP-2,Issue 1 of Guidelines for Preparation of Emergency Procedures | Safe Shutdown |
ML20215H595 | 10 April 1987 | Procedures Generation Package:Public Svc Co of Colorado Fort St Vrain Nuclear Generating Station | Job Performance Measure |
ML20150E304 | 20 March 1987 | Issue 1 to Procedure SR 5.4.1.3.8.abcd-R2, Steam Line Rupture Detection/Isolation Sys (Slrdis) Calibr & Testing for Panel I-93544 | |
ML20237J723 | 20 February 1987 | Issue 5 to QAAP-1, Planning & Scheduling Fort St Vrain QA Audits | Fire Protection Program |
ML20212B308 | 15 February 1987 | Issue 7 to Procedure G-9, Controlled Work Procedures | Fire Watch |
ML20210E300 | 3 February 1987 | Revised Administration Procedures Consisting of Issue 7 to G-3, Action Request-Preparation & Processing, Issue 21 to G-2, Fort St Vrain Procedure Sys & Issue 6 to G-6, Compliance w/10CFR21 Requirements | |
ML20210A757 | 30 January 1987 | Fort St Vrain 1987 Power Ascension Plan | |
ML20237J742 | 19 January 1987 | QA Audit QAA-502-87-01, Audit Plan - QA Program for Transport of Radioactive Matls | |
ML20212B285 | 24 October 1986 | Issue 10 to Procedure Q-3, Design Control Sys | Safe Shutdown |
ML20238E346 | 2 October 1986 | Rev C to EE-ISI-0001, Extraction Steam Lines & Turbine Vent & Drain Lines Erosion Insp Program |