Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23335A083 | 7 December 2023 | ADPCR3 - Crystal River LTP Public Mtg Slide Deck Final | |
ML23335A082 | 7 December 2023 | NRC -Crystal River LTP Public Mtg Slide Deck Final | |
ML23087A292 | 12 April 2023 | 2022 Annual Assessment Meeting | Boric Acid Significance Determination Process |
ML22301A166 | 29 September 2022 | Presentation 4 - Recent Biennial PI&R Team Inspection Insights | Condition Adverse to Quality |
ML22251A235 | 14 September 2022 | Presentation Slides for September 14, 2022, Observation Public Meeting | |
ML22257A239 | 14 September 2022 | Presentation Slides for September 14, 2022, Observation Public Meeting | |
ML22151A265 | 31 May 2022 | Presubmittal Licensee Presentation for 3.3.2 ESFAS Proposed LAR | Surveillance Frequency Control Program |
ML22109A212 | 20 April 2022 | Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation | Incorporated by reference Surveillance Frequency Control Program Operational leakage |
ML22091A133 | 1 April 2022 | Bru Har Combined 2021 Assessment Meeting Slides | Condition Adverse to Quality Coronavirus |
ML22083A107 | 30 March 2022 | Presubmittal Licensee Presentation for SR 3.8.1.16 Proposed License Amendment Request (EPID L-2022-LRM-0021) (Slides) | Offsite Circuit |
ML22007A259 | 2 February 2022 | Presubmittal Licensee Presentation for TS 3.5.3 PIV Testing LAR | Fuel cladding |
ML21322A326 | 29 November 2021 | Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request | |
ML21167A085 | 24 June 2021 | Licensee Presentation for Robinson Pre-submittal Meeting TSTF-577 | Foreign Material Exclusion |
ML21174A321 | 24 June 2021 | Licensee Presentation for Robinson Presubmittal Meeting TSTF 577, Rev. 1 | Foreign Material Exclusion |
ML21105A752 | 15 April 2021 | 2020 Robinson - EOC Presentation Slides | Coronavirus |
ML21090A116 | 31 March 2021 | Combined 2020 Aam Presentation | Condition Adverse to Quality COVID-19 |
ML21053A047 | 25 February 2021 | Duke Energy Pre-Submittal Meeting - February 25, 2021 - H. B. Robinson 3rd Interval Containment ISI Relief Request | Coatings Moisture barrier |
ML21041A453 | 17 February 2021 | Brunswick/Nrc Pre-submittal Meeting: LAR to Adopt TSTF-505, Rev. 2 (Risk-Informed Completion Times) Presentation | High winds Ultimate heat sink Internal Flooding Probabilistic Risk Assessment FLEX |
ML21033A702 | 3 February 2021 | Pre-submitting for Planned LAR for Standby Liquid Control Tank Volume Increase | Shutdown Margin Reactor Vessel Water Level |
ML21011A082 | 12 January 2021 | Pre-Submittal Meeting January 12, 2021, Revision to VRR-01, Full Stroke Testing of Safety/Relief Valves - Presentation Material | Stroke time Power Operated Valves |
ML20132A000 | 11 May 2020 | EOC Presentation | Coronavirus Fire Protection Program |
ML20100G634 | 9 April 2020 | Revised- Bru 2019 Annual Assessment Meeting Slides | COVID-19 |
ML20099C999 | 8 April 2020 | Har 2019 Mtg Slides | Condition Adverse to Quality COVID-19 |
ML20099D128 | 8 April 2020 | Bru 2019 Mtg Slides | COVID-19 |
ML20022A026 | 22 January 2020 | NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index | Maintenance Rule Program |
ML19318F291 | 18 November 2019 | Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request | Finite Element Analysis Stress corrosion cracking |
ML19214A056 | 7 August 2019 | Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 | |
ML19123A353 | 2 May 2019 | Public Meeting Summary - Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 | |
ML18255A014 | 12 September 2018 | BWROG Presentation Slides for Public Meeting Sept 12 2018 | Corrosion bonding |
ML17331A627 | 29 November 2017 | Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 | High winds |
ML17297B789 | 26 October 2017 | Meeting Slide for Partially Closed Pre-submittal Public Meeting with Duke Energy for License Amendment Request to Adopt Areva'S XM-11 Fuel Methodology for Brunswick Steam Electric Plant | MELLLA |
ML17244A227 | 7 September 2017 | Duke Energy Presentation - H.B. Robinson 2017-09-07 Pre-sub Transmission Upgrade Meeting | Qualified Offsite Circuit Offsite Circuit |
ML17229B294 | 22 August 2017 | Meeting Slide Regarding Partially Closed Pre-submittal Public Meeting with Duke Energy for a License Amendment Request for Brunswick Steam Electric Plant | |
ML17200C780 | 19 July 2017 | Duke Energy Pre-submittal Meeting Presentation, August 3, 2017, Harris and Robinson License Amendment Request to Support the Transition to Duke Non-LOCA Analysis Methods, MF9824, MF9825 | |
ML16231A132 | 18 August 2016 | Materials for 8/18/16 Pre-Application Meeting Brunswick Mellla+ LAR | Downpower Power Uprate |
ML16210A515 | 28 July 2016 | Bnp Commercial Grade Dedication Issue (Printable) | Commercial Grade Dedication Commercial Grade |
ML16134A174 | 12 May 2016 | Summary of Public Meeting - 2015 Annual Assessment Regarding Brunswick, Units 1 and 2 | Open House |
ML16112A293 | 2 May 2016 | 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) | |
ML16105A334 | 20 April 2016 | H. B. Robinson Steam Electric Plant, Unit 2 - April 20, 2016, Duke Energy Presentation for 24-Month Fuel Cycle Pre-submittal Meeting (CAC No. MF7503) | |
ML17227A236 | 18 February 2016 | Presentation Slides from February 18, 2016, Meeting with Duke Energy Regarding Crystal River Unit 3, Cyber Security Plan Implementation Schedule Milestone 8 | Time to boil Cyber Security |
ML15231A606 | 19 August 2015 | Duke Energy Presentation - Robinson Nuclear Plant Transmission Upgrade Pre-submittal Meeting 08-26-2015 - MF6477 | Power change |
ML15099A587 | 14 April 2015 | Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson | Hot Short Safe Shutdown Probabilistic Risk Assessment Multiple Spurious Operation Large early release frequency Fire Protection Program |
ML14181A078 | 30 June 2014 | June 30 NRC Slides for Public Meeting with Duke - NTTF 2.1 - Seismic Reevaluation - GMRS | Earthquake |
ML14154A093 | 3 June 2014 | May 28, 2014, Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant | |
ML14140A188 | 19 May 2014 | Summary of Public Meeting - 2013 Annual Assessment Regrading Brunswick Steam Electric Plant | Open House |
ML14135A511 | 17 April 2014 | Enclosure 4 to BSEP 14-0048 - Areva Mellla+ Methods Applicability Presentation (Non-Proprietary Version) | MELLLA Water rod |
ML14135A509 | 17 April 2014 | Enclosure 1 to BSEP 14-0048, Duke Energy Presentation - Brunswick Mellla+ Methods Applicability, Pre-Application Meeting | Exclusive Use Affidavit |
ML14024A263 | 16 January 2014 | Handouts for Post-Shutdown Decommissioning Activities Report Public Meeting, January 16, 2014 | |
ML13312A988 | 8 November 2013 | Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications | |
ML13308A007 | 1 November 2013 | Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. |