Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23361A094 | 21 December 2023 | Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . | Fuel cladding Stretch Power Uprate Exclusive Use Affidavit |
ML23248A213 | 30 August 2023 | Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature. | Power Uprate Measurement Uncertainty Recapture |
ML23208A092 | 26 July 2023 | Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response | |
L-04-002, Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information | 8 May 2023 | Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information | |
ML23124A364 | 20 April 2023 | Response to Request for Additional Information for Spring 2022 Steam Generator Tube Inspection Report | |
ML23096A298 | 6 April 2023 | Units 1 and 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion | |
ML22312A443 | 7 November 2022 | NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to RAI | |
ML21259A085 | 15 September 2021 | North Ann, and Surry, Units 1 and 2, Millstone, Units 2 and 3, Request for Approval of Appendix E of Fleet Report DOM-NAF-2-A Qualification of the Framatome BWU-I CHF Correlation in the Vipre-D Computer Code Response to Request for Addition | |
ML21209A762 | 26 July 2021 | Response to Request for Additional Information for Alternative Request V-01 - Proposed Request for Alternative Frequency to Supplemental Valve Positionn Verification Testing Requirements | |
ML21153A413 | 2 June 2021 | Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate | Safe Shutdown Earthquake |
ML21147A477 | 27 May 2021 | NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Final Supplemental Response | Boric Acid Shutdown Margin Grab sample Coatings |
ML21140A299 | 20 May 2021 | Response to Request for Additional Information for Proposed License Amendment Request to Add an Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident | |
ML21133A285 | 13 May 2021 | Stations, Units 1 & 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix E Fleet Report DOM-NAF-2-A Qualification of the Framatome Bwui CHF Correlation in the Dominion Energy VIPRE-D Computer Code | |
ML21105A433 | 15 April 2021 | Final Supplemental Response to NRC Genetic Letter 2004-02 on Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accident at Pressurized-Water Reactors | Coatings Earthquake |
ML21105A482 | 15 April 2021 | Response to Request for Additional Information for Proposed License Amendment Request to Revise the Millstone, Unit 2 Technical Specification for Steam Generator Inspection Frequency | |
ML21081A136 | 19 March 2021 | Response to Request for Additional Information for Alternative Request RR-05-06 - Inspection Interval Extension for Steam Generator Pressure-Retaining Welds and Full-Penetration Welded Nozzles | Hydrostatic Incorporated by reference Finite Element Analysis |
ML20274A346 | 30 September 2020 | Response to Request for Additional Information for License Amendment Request to Revise Battery Survillance Requirements | |
ML20261H598 | 17 September 2020 | Response to Request for Additional Information for License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation | Anticipated operational occurrence |
ML20252A191 | 4 September 2020 | Response to Request for Additional Information Regarding License Amendment Request for a One-Time Deferral of the Millstone Unit 3 Steam Generator Inspections | |
ML20209A536 | 27 July 2020 | Response to Request for Additional Information Regarding Relief Request IR-3-33 for Limited Coverage Examinations Performed in the Second Period of the Third 10-Year Inspection Interval | |
ML20079K424 | 19 March 2020 | Response to Request for Additional Information for License and Request to Revise TS 3.8.1.1, A.C Sources - Operating, to Support Maintenance and Replacement of the Millstone Unit 3 'A' Reserve Station Service Transformer and 345 Kv South Bu | Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment Reserve Station Service Transformer FLEX Tornado Generated Missile Large early release frequency Offsite Circuit |
ML20076C833 | 16 March 2020 | Response to Request for Additional Information (E-mail Dated 3/16/2020) Alternative Request IR-4-03 for Use of Alternative Non-Code Methodology | Through-Wall Leak |
ML20048A019 | 11 February 2020 | Response to Request for Additional Information for License Amendment Request to Revise TS 3.8.1.1, A.C. Sources - Operating, to Support Maintenance and Replacement of a Reserve Station Service Transformer and 345 Kv South Bus. | Reserve Station Service Transformer Offsite Circuit |
ML20042D996 | 10 February 2020 | Response to March 12, Request for Information Enclosure 2, Recommendation 2.1, Flooding Focused Evaluation/Integrated Assessment Submittal | High winds Ultimate heat sink Hydrostatic FLEX Fukushima Dai-Ichi Flooding Focused Evaluation Earthquake Minimum staff |
ML19284A397 | 3 October 2019 | Response to NRC Request for Additional Information on License Amendment Request to Adopt 10 CFR 50.69 | Safe Shutdown Mission time Internal Flooding Probabilistic Risk Assessment Multiple Spurious Operation FLEX Fire Protection Program |
ML19249B767 | 29 August 2019 | Enclosure 1 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Response to EAL Scheme Change RAIs | Safe Shutdown Offsite Dose Calculation Manual Met Tower FLEX Earthquake Fuel cladding |
ML19092A332 | 27 March 2019 | Response to Request for Additional Information for Proposed Technical Specification Changes for Spent Fuel Pool Storage and New Fuel Storage | Unanalyzed Condition |
ML19011A111 | 18 December 2018 | Supplement to the Flooding Hazard Reevaluation Report in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding | High winds Ultimate heat sink Hydrostatic FLEX |
ML18340A028 | 29 November 2018 | Response to Request for Additional Information for Proposed Technical Specifications Changes for Spent Fuel Pool Storage and New Fuel Storage | |
ML18302A120 | 22 October 2018 | Response to Request for Additional Information for License Amendment Request to Revise the Technical Specification for Control Building Ventilation Inlet Instrumentation | Recently irradiated fuel |
ML18235A321 | 17 August 2018 | Response to Request for Additional Information for Proposed Alternative Request P-06 for 'C' Charging Pump | |
ML18225A066 | 6 August 2018 | Response to Request for Additional Information for Alternative Requests Associated with the In-Service Testing Program for Pumps, Valves, and Snubbers Fifth and Fourth 10-Year Interval Updates | |
ML18205A176 | 19 July 2018 | Response to Request for Additional Information for Alternative Requests Associated with the In-Service Testing Program for Pumps, Valves, and Snubbers Fifth and Fourth 10-Year Interval Updates for Units 2 and 3 | Boric Acid |
ML18170A093 | 14 June 2018 | Response to Request for Additional Information Regarding License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals | High winds Ultimate heat sink Tornado Missile Internal Flooding Probabilistic Risk Assessment Turbine Missile |
ML18151A467 | 24 May 2018 | Response to Request for Additional Information Regarding License Amendment Request to Revise Integrated Leak Rate Test (Typed a) and Type C Test Intervals | Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML17338A057 | 22 November 2017 | Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools | |
ML17300A220 | 24 October 2017 | Response to Information Need Request Regarding Mitigating Strategies Assessment (MSA) Report for Flooding | High winds FLEX |
ML17053A106 | 16 February 2017 | Response to Request for Additional Information Regarding Proposed Alternative Requests RR-04-24 and IR-3-30 for Elimination of the Reactor Pressure Vessel Threads in Flange Examination | Nondestructive Examination |
ML17038A005 | 31 January 2017 | Response to RAI Regarding End of Cycle 23 and End of Cycle 17 Steam Generator Tube Inspection Reports, CAC MF8507 & MF8506 | |
ML16365A036 | 22 December 2016 | Response to March 12, 2012 Information Request High Frequency Sensitive Equipment Functional Confirmation for Recommendation 2.1 | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
ML16365A032 | 21 December 2016 | Response to March 12, 2012 Information Request, Spent Fuel Pool Seismic Evaluation for Recommendation 2.1 | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi |
ML16321A454 | 10 November 2016 | Connecticut and Virginia Electric & Power Company Response to Request for Additional Information Revision 22 of Quality Assurance Program Description Topical Report | |
ML16312A064 | 1 November 2016 | Units 1 & 2, Surry, Units 1 & 2, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools | |
ML16294A270 | 18 October 2016 | Response to Request for Additional Information for License Amendment Request Regarding Realistic Large Break Loss of Coolant Accident Analysis - RAI Questions 1 Through 3 | Boric Acid Fuel cladding |
ML16291A508 | 12 October 2016 | Response to Follow Up Request to Revise ECCS TS 3/4.5.2 and FSAR Chapter 14 to Remove Charging | Anticipated operational occurrence |
ML16202A040 | 14 July 2016 | Response to Request for Additional Information Regarding Spent Fuel Pool Heat Load Analysis License Amendment Request | Ultimate heat sink |
ML16188A196 | 30 June 2016 | NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
ML16182A037 | 27 June 2016 | Response to Request for Additional Information for License Amendment Request to Revise ECCS TS 3/4.5.2 and FSAR Chapter 14 to Remove Charging | Loop seal Anticipated operational occurrence |
ML16159A238 | 1 June 2016 | Isfsis, Response to NRC Request for Information Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and ISFSIs Security Program, Rev. 21 | |
ML16148A701 | 20 May 2016 | Response to Request for Additional Information Regarding ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inspection Interval |