Response to March 12, 2012 Information Request High Frequency Sensitive Equipment Functional Confirmation for Recommendation 2.1
ML16365A036
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 12/22/2016
From: Heacock D
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
16-455
Download: ML16365A036 (84)


Text

Dominion Nuclear Connecticut, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060

.Web Address: www.dom.com

.ir December 22, 2016 U.S. Nuclear Regulatory Commission Serial No.16-455 Attention: Document Control Desk NRNDEA RO Washington, DC 20555 Docket Nos. 50-336/423 License Nos. DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 2 AND 3 RESPONSE TO MARCH 12, 2012 INFORMATION REQUEST HIGH FREQUENCY SENSITIVE EQUIPMENT FUNCTIONAL CONFIRMATION FOR RECOMMENDATION 2.1

References:

1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012 [ADAMS Accession Nos. ML12056A046 and ML12053A340].
2. NRC Letter, "Final Determination of Licensee Seismic Probabilistic Risk Assessments Under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 "Seismic" of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident,"

dated October 27, 2015 [ADAMS Accession No. ML15194A015].

3. EPRI Report 3002004396, Final Report, High Frequency Program Application Guidance for Functional Confirmation and Fragility Evaluation, July 2015 [ADAMS Accession No. ML15223A102].
4. EPRI Report 1025287, Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic, February 2013 [ADAMS Accession No. ML12333A170].

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 1, Item (4), of Reference 1 requested addressees to provide information related to the functionality of high-frequency sensitive structures, systems, and components (SSCs) under certain circumstances. By letter dated October 27, 2015 (Reference 2), the NRC transmitted final seismic information request tables, which identified that Millstone Units 2 and 3 were to conduct a limited scope seismic evaluation that included a high-frequency (HF) sensitive equipment evaluation.

Electric Power Research Institute (EPRI) Report 3002004396, High Frequency Program Application Guidance for Functional Confirmation and Fragility Evaluation (Reference 3), provides methods and criteria for evaluating the HF sensitive equipment to the reevaluated ground motion response spectrum (GMRS) hazard levels. This report supplements the guidance provided in the Seismic Evaluation Guidance, Screening,

1 oID

. ~~R-.

Serial No.16-455 Docket Nos. 50-336/423 Page 2 of 3 Prioritization and Implementation Details (SPID) (Reference 4), for plants where the GMRS exceeds the safe shutdown earthquake (SSE) spectrum in the frequency range greater than 10 Hz.

Attachments 1 and 2 provide the information requested in response to Enclosure 1, Item (4) of Reference 1 for Millstone Units 2 and 3, respectively, based on the high-frequency sensitive equipment evaluation guidance from EPRI Report 3002004396.

This letter completes the submittal of information requested by Reference 1, Enclosure 1, Recommendation 2.1: Seismic, for Millstone Units 2 and 3.

If you have any questions regarding this information, please contact Diane E. Aitken at (804) 273-2694.

Sincerely, David A. Heacock President Dominion Nuclear Dominion Nuclear Connecticut, Inc.

COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO CRAIG D SLY Notary Public Commonwealth of Virginia Reg.# 7518653 Notaublic My Commission Expires December 31, 2~

Commitments made in this letter: No new regulatory commitments Attachments:

1. High-Frequency Sensitive Equipment Functional Confirmation for Millstone Unit 2
2. High-Frequency Sensitive Equipment Functional Confirmation for Millstone Unit 3

Serial No.16-455 Docket Nos. 50-336/423 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 Richard V. Guzman Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C 2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station 50.54f_Seismic.Resource@nrc.gov

Serial No.16-455 Docket Nos. 50-336/423 ATTACHMENT 1 HIGH-FREQUENCY SENSITIVE EQUIPMENT FUNCTIONAL CONFIRMATION FOR MILLSTONE UNIT 2 MILLSTONE POWER STATION UNIT 2 DOMINION NUCLEAR CONNECTICUT, INC.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 1 of 25

1.0 INTRODUCTION

1.1 PURPOSE The purpose of this attachment is to provide information requested by the NRC in its March 12, 2012 10 CFR 50.54(f) letter issued to all power reactor licensees and holders of construction permits in active or deferred status (Reference 1). Specifically, this attachment provides the results of the High Frequency Confirmation required by Item (4), Enclosure 1, Recommendation 2.1: Seismic, of the letter.

The High Frequency Confirmation evaluation undertaken for Millstone Power Station Unit 2 (MPS2) used the methodologies in EPRI Report 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation" (Reference 8) as described herein.

A summary of the High Frequency Confirmation evaluations and results are provided below.

1.2 BACKGROUND

Following the accident at the Fukushima Dai-ichi nuclear power plant resulting from the March 11, 2011, Great Tohoku Earthquake and subsequent tsunami, the Nuclear Regulatory Commission (NRC) established a Near Term Task Force (NTTF) to conduct a systematic review of NRC processes and regulations and to determine if the agency should make additional improvements to its regulatory system. The NTTF developed a set of recommendations intended to clarify and strengthen the regulatory framework for protection against natural phenomena. Subsequently, the NRC issued a 10 CFR 50.54(f) letter on March 12, 2012 (Reference 1), requesting information to assure that these recommendations are addressed by all U.S. nuclear power plants. The 50.54(f) letter requests that licensees and holders of construction permits under 10 CFR Part 50 reevaluate the seismic hazards at their sites against present-day NRC requirements and guidance. Included in the 50.54(f) letter was a request that licensees perform a "confirmation, if necessary, that SSCs, which may be affected by high-frequency ground motion, will maintain their functions important to safety."

EPRI Report 1025287, "Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic" (Reference 6) provided screening, prioritization, and implementation details to the U.S. nuclear utility industry for responding to the NRC 50.54(f) letter. This report was developed with NRC participation and is endorsed by the NRC. The SPID included guidance for determining which plants should perform a High Frequency Confirmation and identified the types of components that should be evaluated in the evaluation.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 2 of 25 Subsequent guidance for performing a High Frequency Confirmation was provided in EPRI Report 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation," (Reference 8) and was endorsed by the NRC in a letter dated September 17, 2015 (Reference 3). Final screening identifying plants needing to perform a High Frequency Confirmation was provided by NRC in a letter dated October 27, 2015 (Reference 2).

On March 31, 2014, Millstone Power Station submitted a reevaluated seismic hazard to the NRC as a part of the Seismic Hazard and Screening Report (Reference 4). By letter dated October 27, 2015 (Reference 2), the NRC transmitted the results of the screening and prioritization review of the seismic hazards reevaluation.

The reevaluated seismic hazard was developed in order to provide the information requested by the NRC in Reference 1 and does not constitute a new or supplemental seismic design or licensing basis for MPS2. As such, the conclusions of the High Frequency Confirmation review do not result in a challenge to the design basis function of any plant structures, systems, or components important to safety.

1.3 APPROACH EPRI Report 3002004396 (Reference 8) is used for the MPS2 engineering evaluations described in this attachment. Section 4.1 of Reference 8 provided general steps to follow for the high-frequency confirmation component evaluation. Accordingly, the following topics are addressed in the subsequent sections of this attachment:

  • Selection of components and a list of specific components for high-frequency confirmation
  • Estimation of seismic demand for subject components
  • Estimation of seismic capacity for subject components
  • Summary of high-frequency evaluations for subject components
  • Summary of Results 1.4 PLANT SCREENING MPS2 submitted the reevaluated seismic hazard information, including the GMRS, to the NRC on March 31, 2014 (Reference 4). In letters dated December 15, 2015 and March 15, 2016 (References 12 and 13, respectively), the NRC staff concluded that the submitted GMRS adequately characterizes the reevaluated seismic hazard for the MPS site.

The NRC final screening determination letter (Reference 2) concluded that the MPS2 GMRS to SSE comparison resulted in a need to perform a High Frequency Confirmation in accordance

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 3 of 25 with the screening criteria in the SPID (Reference 6).

1.5 INITIAL CONDITIONS For the purposes of this High Frequency Confirmation review, the plant is assumed to be operating normally prior to the occurrence of the severe seismic event with offsite power sources available. The seismic event was presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor trip.

2.0 SELECTION OF COMPONENTS FOR HIGH-FREQUENCY SCREENING The fundamental objective of the high-frequency confirmation review was to determine whether the occurrence of a seismic event could cause critical equipment to fail to perform as necessary.

An optimized evaluation process was applied that focused on achieving a safe and stable plant state following a seismic event. As described in Reference 8, this state is achieved by confirming that key plant safety functions critical to immediate plant safety are preserved (reactor trip, reactor coolant system inventory and pressure control, and core cooling) and that the plant operators have the necessary power available to achieve and maintain this state immediately following the seismic event (AC/DC power and support systems).

Within the applicable functions, the components that would need a high-frequency confirmation are contact control devices subject to intermittent states (e.g., relay contact chatter) in seal-in or lockout circuits. Accordingly, the objective of the review, as stated in Section 4.2.1 of Reference 8, was to determine if seismic induced high-frequency relay chatter would prevent the completion of key plant safety functions.

For each function, a review was performed to identify plant equipment supporting the function.

The control circuit schematic diagrams for this equipment were then reviewed using the guidance from EPRI NP-7148 (Reference 11) and EPRI Report 3002004396 (Reference 8) to determine whether seismic-induced contact chatter could result in seal-in or lockout (SILO) conditions that could have an adverse impact on the equipment capability to support key plant safety functions. From this review, a list of contact control devices for which contact chatter could result in SILO conditions was identified. These devices (termed "relays" for the purposes of this evaluation) were further evaluated for seismic capacity margin, as described in Sections 3 and 4.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 4 of 25 2.1 REACTOR TRIP/SCRAM Consistent with the guidance in Reference 8, the design requirements for reactor trip systems preclude the application of seal-in or lockout circuits that prevent reactor trip/SCRAM functions and no high-frequency component chatter review is necessary for this function.

2.2 REACTOR COOLANT SYSTEM INVENTORY CONTROL The reactor coolant system inventory control systems were reviewed to identify components .

that could be susceptible to adverse operation due to contact control devices in SILO circuits that could create loss of coolant-type events, such as inadvertent opening of a pressurizer power-operated relief valve (PORV).

The following components were identified for control circuit review for SILO conditions:

  • Pressurizer PORVs 2.3 REACTOR COOLANT SYSTEM PRESSURE CONTROL Consistent with the guidance in Reference 8, no specific high-frequency component chatter review is required for this function.

2.4 CORE COOLING The core cooling systems were reviewed to identify components that could be susceptible to adverse operation due to contact control devices in SILO circuits that would prevent accomplishment of the core cooling function. The intent of the review was to ensure at least a single train of non-AC power driven. decay heat removal capability was maintained (e.g.,

auxiliary feedwater flow from at least one pump to at least one steam generator).

The following components were identified for control circuit review for SILO conditions:

  • Atmospheric Steam Dump Valves
  • Turbine-driven AFW Pump Steam Supply Valves
  • Turbine-driven AFW Pump Trip-Throttle Valve
  • Turbine-driven AFW Pump 2.5 AC/DC POWER SUPPORT SYSTEMS The AC and DC power support systems were reviewed to identify components that could be susceptible to adverse operation due to contact control devices in SILO circuits that prevent the availability of DC and/or AC power sources. The following AC and DC power support systems

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 5 of 25 were reviewed:

  • EOG Support Systems and associated Switchgear, Load Centers, and MCCs,
  • Battery Chargers and Inverters,
  • Vital 125vdc and 120vac Distribution The analysis considered the reactor operating normally at power with no equipment failures prior to the seismic event. The EDGs are not operating, but are available. The seismic event was presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor trip.

In response to bus under-voltage relaying detecting the LOOP, the Class 1E control systems must automatically shed loads, start the EDGs, and sequentially load the diesel generators as designed. Ancillary systems required for EOG operation, as well as Class 1E battery chargers and inverters, must function as necessary.

The following components were identified for control circuit review for SILO conditions:

  • 4kV Emergency Bus Feeder and Bus Tie Breakers (Emergency and Offsite sources)
  • 480v Emergency Bus Feeder and Tie Breakers
  • 4kV I 480v Emergency Bus Transformers and 4kV Supply Breakers
  • 4kV Emergency Bus Load Breakers to Service Water, AFW, High Pressure Safety Injection, Low Pressure Safety Injection, Containment Spray and Reactor Building Closed Cooling Water Pumps
  • 480v Emergency Bus Load Breakers to 125vdc Battery Chargers, various MCCs, and Load Centers
  • 125vdc Batteries, DC Susses, Battery Chargers, and Distribution System Components
  • 120vac Vital Inverters and Distribution System Components
  • EOG Air Start System Valves
  • EOG Room Ventilation Fans and Dampers

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 6 of 25 2.6

SUMMARY

OF SELECTED COMPONENTS A list of the contact devices requiring a high-frequency confirmation is provided in Appendix 1.

3.0 SEISMIC DEMAND ESTIMATE The high-frequency functional confirmation process for the relays subject to the potential for seismic-induced contact chatter requires the mounting point seismic demand to be determined, which requires the development of in-structure seismic demand based on the GMRS input and the in-cabinet amplification of the in-structure floor motion at the location of the electrical cabinet housing the relay.

The calculation of in-structure response typically requires the development of a foundation input response spectrum (FIRS) and dynamic analysis of the structure. MPS2 has not developed these inputs from the GMRS for plant structures. Therefore, consistent with the guidance in Reference 8, Section 4.3, the in-structure response for buildings and floor elevations where subject relays are located was estimated as described in subsection 3.1 below.

The mounting point high-frequency seismic demand was determined consistent with the guidance in Reference 8, Sections 4.4 and 4.5, and is described in subsection 3.2 below.

3.1 ESTIMATE OF HIGH FREQUENCY IN-STRUCTURE RESPONSE Per Reference 8, Sect. 4.3, the basis for calculating high-frequency seismic demand in the horizontal direction is the horizontal control point GMRS, which was developed in response to Reference 1 and reported in the MPS Seismic Hazard and Screening Report (Reference 4). As noted in Reference 8, Section 3.3, The Control Point GMRS developed for these rock sites are typically appropriate for all rock founded structures and additional FIRS estimates are not deemed necessary for the high frequency confirmation effort.

MPS is a rock site, and the MPS2 structures of interest for the high-frequency confirmation (Auxiliary Building and Turbine Building) are rock-founded. Therefore, the control point GMRS was the appropriate review level earthquake (RLE) input for the purposes of the high-frequency confirmation.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 7 of 25 3.1.1 HORIZONTAL SEISMIC DEMAND The horizontal response structural amplification factor to be applied for estimating the horizontal in-structure seismic demand is provided in Reference 8, Figure 4-3 and is based upon the height of the electrical cabinet (that the relay is mounted within) above the building foundation.

For the MPS2 high-frequency confirmation, this height was taken as the difference between the lowest floor elevation and the floor elevation of the cabinet anchorage.

The horizontal seismic demand was calculated in accordance with Reference 8, Equation 4-1 a:

SAcH =SAGMRS

  • AF SH SAcH is the Spectral Acceleration, Clipped Horizontal (i.e., in-structure [floor] horizontal acceleration).

SAGMRS is the peak GMRS between 15-40Hz. The SAGMRs value is 0.422g from Reference 4.

The horizontal GMRS is plotted in Figure 3-1.

AFsH is the Horizontal Response Structural Amplification Factor from Reference 8, Figure 4-3.

3.1.2 VERTICAL SEISMIC DEMAND The vertical response structural amplification factor to be applied for estimating the vertical in-structure seismic demand is provided in Reference 8, Figure 4-4 and is based upon the height of the electrical cabinet (that the relay is mounted within) above the building foundation. For the MPS2 high-frequency confirmation, this height was taken as the difference between the lowest floor elevation and the floor elevation of the cabinet anchorage.

The vertical seismic demand was calculated in accordance with Reference 8, Equation 4-1 b:

SAcv =SAvGMRS

  • AF sv SAcv is the Spectral Acceleration, Clipped Vertical (in-structure [floor] vertical acceleration).

SAvGMRs is the peak estimated Spectral Acceleration, Vertical GMRS in the 15 to 40Hz frequency range. The peak SAvGMRs is the maximum product of the Vertical-to-Horizontal (V/H) function values and the corresponding horizontal GMRS values between 15 and 40Hz. The GMRS values are from Reference 4. The V/H function is derived from Reference 8, Tables 3-1 and 3-2, utilizing the GMRS peak ground acceleration (PGA) [0.190g] and the shear wave travel time from a depth of 30 meters to the ground surface (Vs30) from Reference 4. For MPS2, the V/H function values are between 0.680 @ 15 Hz and 0.860 @ 40Hz, and are based on the GMRS Horizontal PGA = 0.19g and Vs30 > 1,000 mps corresponding to a site class '8-Hard' per Reference 8, Table 3-2. The maximum product of the V/H function values and the

corresponding GMRS is 0.31 g, which occurs at 40Hz (GMRS 0.36g, V/H 0.86). The GMRS, estimated vertical GMRS (VGMRS), and V/H Ratio values are plotted in Figure 3-1, along with the SSE spectrum.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 8 of 25 AFsv is the Vertical Response Structural Amplification Factor from Reference 8, Figure 4-4.

3.2 ESTIMATE OF HIGH FREQUENCY MOUNTING POINT SEISMIC DEMAND The mounting point seismic demand was determined by applying in-cabinet amplification factors to the in-structure demand, as described in Reference 8, Sections 4.4 and 4.5.1.

The in-structure demand was determined as described in Section 3.1 above. The in-cabinet amplification factor is applied to account for the amplification of the structure seismic response at the cabinet anchor points. The in-structure demand (horizontal or vertical) was multiplied by the applicable in-cabinet amplification factor to obtain the mounting point demand.

Horizontal cabinet amplification factors used were:

Motor Control Centers AFc =3.6 Switchgear (flexible panels) AFc =7.2 Control Cabinets (e.g., Control Room electrical panels AFc =4.5 and bench boards, etc.)

Cabinet types were determined based on guidance in EPRI NP-7148, "Procedure for Evaluating Nuclear Power Plant Relay Seismic Functionality" (Reference 11).

The vertical cabinet amplification factor used was AFc = 4.7 for all three cabinet types.

For electrical cabinets/enclosures that did not correspond to the listed cabinet types, in-cabinet amplification factors consistent with the cabinet configuration were used and justified on a case-by-case basis.

The mounting point demand, ICRSc, used in the horizontal and vertical directions for evaluation of the relays, is equal to the product of the clipped in-structure demand and the applicable cabinet amplification factor within the 15 to 40 Hz frequency range, as described in Reference 8, Sections 4.4:

ICRScH =AFcH

  • SAcH ICRScv =AFcv
  • SAcv The cabinet type classification and the mounting point seismic demand are tabulated for each evaluated relay in Appendix 1.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 9 of 25 Millstone Unit 2 0.50 .,,,, 1 I ,;f?i I'<:

I I ~ ~

'",.Ill ..

  • * * * *

- - - GMRS HF Range -SSE

r. ,.

1.;. ii I

~

0.9

. . ~

0.40 - * *V/H Ratio ll ' . ...-~,

", 0.8

- . - - . -I . -.. .. . - . - . - ,1.'1.- . -.. .**"lt .... "*

  • ~

I; ~ I tlO 0.35  ;~ 0.7 i* "'* \

c'  !'!! .

0 ~m.

-**II*

....~ ~ .**~~

~ 0.6

...cu 0.30 I / , _ I ,,~' . ..,,..,*' ":~ *.~,

... .0

  • l n:J

] 0.25 0.5 a::

,f ..

I.' **

1*.*,

~;~: *~xi: .......

u n:J

/ ,.., **I'  ::c

,I .  : ..,;,..

~'--

] 0.20 0.4 u

cu Q.

I ~/ , "'I .*** **..

i* "'*

., ..* 1 I **  :

VI 0.15 0.3

  • ~ i *;:L II 1' P'-~! *

~

, ~" .. .** .*

r-... .i I

0.10 0.2

. :<er

.... ..,'.. .. ** f .";l

~.,,, ~ a 0 .05 -t 0.1 0.00

..... ... ""*,*** t --

~-.-:****

I 11~ :~al~~llt I 0 0.1 1 10 100 Spectral frequency, Hz Figure 3-1: Plot of Horizontal and Vertical Ground Motion Response Spectra , Safe Shutdown Earthquake Spectrum , and V/H Ratio 4.0 CONTACT DEVICE EVALUATIONS The high-frequency functional confirmation process for the relays subject to the potential for seismic-induced contact chatter requires the comparison of relay seismic capacity to the applicable seismic demand to determine whether the relay is predicted to experience contact chatter during a GMRS-level seismic event. Seismic demand was determined as described in Section 3.0. The deterministic high confidence of low probability of failure (HCLPF) capacity of the relay device was determined in accordance with the guidance of Reference 8, Section 4.5.

4.1 HCLPF COMPONENT CAPACITY The HCLPF capacities of the relays were developed based on the guidance in Reference 8, Section 4.5.2. The effective wide band capacity, TRS , is given by Reference 8, Equation 4-5:

SAT is the Spectral Acceleration, Effective Spectral Test Capacity (Relay Seismic Capacity) for relays as obtained from one of the following sources:

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 10 of 25

  • EPRI High Frequency Test Program (References 7 and 8)
  • Generic Equipment Ruggedness Spectrum (GERS) (Reference 9 and 10)
  • Seismic Qualification Reporting and Testing Standardization (Reference 14)
  • Site-specific seismic qualification test data Certain relay model numbers identified on the relay list are not explicitly covered by the testing referenced in the list above and a comparison of the relay to other similar relay types having seismic qualification test data (e.g., same manufacturer & same family of relay, similar size, shape, features, construction, etc.) was made in those cases in order to provide a SAT value.

FK is the Conservative Deterministic Failure Margin (CFDM) Knockdown Factor and its value depends on the source of the test value chosen to represent test capacity. FK was obtained from Reference 8, Table 4-2.

FMs is the Multi-axis to Single-axis Correction Factor and is equal to either 1.0 or 1.2 depending on the expected seismic response of the relay enclosure cabinet. The value of FMs was chosen consistent with the guidance from Reference 8, Section 4.5.2.

The effective wide band capacity, along with the source for the device capacity, is tabulated for each evaluated relay in Appendix 1.

4.2 SEISMIC MARGIN EVALUATION The seismic margin to the onset of contact chatter was determined by comparing the HCLPF capacity, TRS, to the mounting point seismic demand, ICRSc, to obtain the capacity/demand ratio:

CID= TRS / ICRSc (C/D is determined for horizontal and vertical directions)

The results of the relay chatter evaluation is tabulated for each evaluated relay in Appendix 1.

Two representative sample relay evaluations are included in Appendix 2.

5.0 CONCLUSION

S 5.1

SUMMARY

OF RESULTS The high-frequency confirmation review was performed consistent with the guidance in EPRI Report 3002004396 (Reference 8). The following results were obtained:

  • 132 essential plant components were selected for detailed review
  • 103 components were selected for relay chatter evaluation (the remaining 29 components are non-electrical, and do not require relay chatter evaluation)
  • 363 relays were identified for the 103 components evaluated for relay chatter

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 11 of 25

  • 104 relays were identified with the potential to cause SILO conditions and required seismic margin evaluation
  • 101 relays were determined to have adequate seismic margin to chatter (C/D ratio>/= 1)

The high-frequency confirmation review determined there are three relays associated with essential components for which, based on available high-frequency seismic capacity information and the conservatively estimated seismic demand, the seismic capacity is exceeded by the GMRS in-cabinet seismic demand. These relays are identified in the table below. The relays are associated with protection and/or metering for 4kV Emergency Diesel Generator output breakers. The relays are located within the 4kV Emergency Switchgear A3 and A4 cubicles.

Appendix1 Component ID Associated Relay ID(s)

Item No. (Breaker ID) (Switchgear Cubicle location) 6 15G-12U-2 (52-A312) 81 (A312) 15 15G-13U-2 (52-A401) 81 (A401) 18 15G-13U-2 (52-A401) 51V-A, B & C (A401)

Chatter of the relays could cause trip and/or prevent closure of the emergency diesel generator (EOG) output breaker at a time when the EOG is required to provide emergency power to the associated 4kV emergency bus (i.e., LOOP).

Further review of the consequences of potential contact chatter associated with these relays determined that operator action guided by existing emergency response procedures would resolve the condition. As part of the immediate actions, response to a reactor trip, as detailed in the Standard Post Trip Actions Emergency Operating Procedure, EOP-2525, the operator in the main control room is directed to check that vital electrical buses are energized. If the 4kV emergency bus(es) is(are) not energized, the procedure provides the immediate action to confirm that the EOG is running and ensure that the output breaker is closed. As part of this action, if the breaker had not closed, or had tripped open, as a result of 81 (frequency) or 51 (time overcurrent) relay device contact chatter, the operator would manually close the output breaker remotely from the panel in the main control room after confirming appropriate permissives are established (also from the main control room) .. This action would resolve the adverse effect that could result from the relay contact chatter. Since this action would take place within the main control room and is guided by an existing procedure, the action to manually close the EOG output breaker to resolve the potential relay contact chatter consequence is not considered to be an excessive operational burden. In addition, the plant would initially reach safe and stable conditions without emergency AC power.

5.2 CONCLUSION

This attachment provides the information required by Enclosure 1, Recommendation 2.1:

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 12 of 25 Seismic, Item (4) of the NRC's March 12, 2012 request for information letter (Reference 1).

A high-frequency confirmation review has been performed for MPS2 to determine whether the occurrence of a severe seismic event could cause selected essential equipment to fail to perform as necessary. As a result of this review, it is concluded that accomplishment of the key plant safety functions defined in Reference 8 will not be adversely affected due to relay chatter during a severe seismic event equivalent to the level of the reevaluated seismic hazard for Millstone Power Station Unit 2.

6.0 REFERENCES

1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012.
2. NRC Letter, "Final Determination of Licensee Seismic Probabilistic Risk Assessments Under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)

Regarding Recommendation 2.1 "Seismic" of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated October 27, 2015.

3. NRC Letter, "Endorsement of Electric Power Research Institute Final Draft Report 3002004396, "High Frequency Program: Application Guidance for Functional Confirmation and Fragility"," dated September 17, 2015.
4. Dominion Nuclear Connecticut, Inc. Letter, "Millstone Power Station Units 2 and 3, Response to March 12, 2012 Information Request - Seismic Hazard and Screening Report (CEUS Sites) for Recommendation 2.1," dated March 31, 2014.
5. EPRI Report 1015109, "Program on Technology Innovation: Seismic Screening of Components Sensitive to High-Frequency Vibratory Motions," October 2007.
6. EPRI Report 1025287, Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic, February 2013.
7. EPRI Report 3002002997, "High Frequency Program: High Frequency Testing Summary,"

September 2014.

8. EPRI Report 3002004396, "High Frequency Program: Application Guidance for Functional Confirmation and Fragility Evaluation," July 2015.
9. EPRI NP-7147-SL, "Seismic Ruggedness of Relays," August 1991.
10. EPRI NP-7147 SQUG Advisory 2004-02, "Relay GERS Corrections," September 10, 2004.
11. EPRI NP-7148 "Procedure for Evaluating Nuclear Power Plant Relay Seismic Functionality,"

1990.

12. NRC Letter, "Millstone Power Station, Units 2 and 3 - Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f),

Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (TAC Nos. MF3968 and MF3969),"

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 13 of 25 dated December 15, 2015.

13. NRC Letter, "Millstone Power Station, Units 2 and 3 - Supplement to Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (CAC Nos. MF3968 and MF3969)," dated March 15, 2016.
14. EPRI Report 1019309, "Seismic Qualification Reporting and Testing Standardization (SQURTS) Test Report Database v2.0," 2009.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 14 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Source Evaluation No. ID Eauioment Descriotion Function RelavlDfsl Tvoe Bid a Elev ICRS,M ICRS,v Relav Mfa. & Model Document TRS Result 15G-12U-2 4KV EMERGENCY BUS AC/DC 51-A, B & C (A302} Switchgear TURB 31'-6" 4.810 1.866 GE 121AC53A101A SQURTS 7S015SE 8.747 Capacity meets or 1 (52-A312} 24C (A3} FEEDER Power and exceeds demand BREAKER FROM EOG "A" Support CH7Al Svstems 15G-12U-2 4KV EMERGENCY BUS AC/DC 51GS (A302} Switchgear TURB 31'-6" 4.810 1.866 GE 121AC53A3A SQURTS 7S015SE 8.747 Capacity meets or 2 (52-A312) 24C (A3) FEEDER Power and exceeds demand BREAKER FROM EDG "A" Support fH7Al Svstems 15G-12U-2 4KV EMERGENCY BUS AC/DC 51V-A, B & C (A312) Switchgear TURB 31'-6" 4.810 1.866 GE 121JCV52A9A SQURTS 50098. 7 5.463 Capacity meets or 3 (52-A312) 24C(A3)FEEDER Power and exceeds demand BREAKER FROM EDG "A" Support fH7Al Svstems 15G-12U-2 4KV EMERGENCY BUS AC/DC 59 (C38) Control AUX 14'-6" 3.987 2.905 GE 12NGV12A11A EPRl NP-7147-Sl, GERS-RLY- 5.333 Capacity meets or 4 (52-A312} 24C (A3) FEEDER Power and Cabinet PPM.4 exceeds demand BREAKER FROM EDG "A" Support CH7Al Svstems 15G-12U-2 4KV EMERGENCY BUS AC/DC 5X (reviewed for H-7A) Control AUX 14'-6" 3.987 2.905 TELEMECHANlQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or 5 (52-A312) 24C (A3) FEEDER Power and (T040) Cabinet CLASS J13P3211 Table 3-1 exceeds demand BREAKER FROM EDG "A" Support fH7Al Svstems 15G-12U-2 4KV EMERGENCY BUS AC/DC 81 (A312} Switchgear TURB 31'-6" 4.810 1.866 GE 12CFF12A63A SQURTS 50098. 7 4.370 Close Breaker 6 (52-A312} 24C (A3) FEEDER Power and from Control BREAKER FROM EDG "A" Support Room (COB}

(H7A) Systems

[2]

15G-12U-2 4KV EMERGENCY BUS AC/DC 86 (A312) Switchgear TURB 31'-6" 4.810 1.866 GE 12HEA61B235 EPRl NP-7147-SL, GERS-RLY- 8.000 Capacity meets or 7 (52-A312) 24C (A3} FEEDER Power and AL0.2 exceeds demand BREAKER FROM EDG "A" Support (H7A) Svstems 15G-12U-2 4KV EMERGENCY BUS AC/DC 86-2/22S3-24C-2 (A302} Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA151A2H (DC) EPRI 3002002997 16.385 Capacity meets or 8 (52-A312} 24C (A3) FEEDER Power and exceeds demand BREAKER FROM EDG "A" Support CH7Al Svstems 15G-12U-2 4KV EMERGENCY BUS AC/DC 87-A, B & C (A312X) Switchgear TURB 31'-6" 0.886 0.628 GE 121JD52A11A SQURTS 61267.2 1.717 Capacity meets or 9 (52-A312) 24C (A3) FEEDER Power and exceeds demand BREAKER FROM EDG "A" Support (H7A) Systems 15G-12U-2 4KV EMERGENCY BUS AC/DC BUS A3 LOAD SHED Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-2665, Design Verification of 8.200 Capacity meets or 10 (52-A312) 24C (A3} FEEDER Power and (K534A) (RC02B) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand BREAKER FROM EDG "A" Support Millstone Unit 2 ESAS (H7A) Systems Replacement Relays, Revision 0, June 2004 15G-12U-2 4KV EMERGENCY BUS AC/DC HSR(T040) Control AUX 14'-6" 3.987 2.905 GE CR120BD09041 EPRl NP-7147-SL, GERS-RLY- 5.667 Capacity meets or 11 (52-A312) 24C (A3} FEEDER Power and Cabinet Al1.4 (increased by SQURTS TR- exceeds demand BREAKER FROM EDG "A" Support 105988-V2, Table 3-1)

(H7Al Systems 15G-12U-2 4KV EMERGENCY BUS AC/DC SDR (reviewed for H-7A) Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRl TR-105988-V2 (SQURTS), 9.467 Capacity meets or 12 (52-A312) 24C (A3) FEEDER Power and (T040} Cabinet CLASS J13P8111 Table 3-1 exceeds demand BREAKER FROM EDG "A" Support (H7A) Systems 15G-13U-2 4KV EMERGENCY BUS AC/DC 51-A, B & C (A411) Switchgear TURB 56'-6" 6.379 2.468 GE 121AC53A101A SQURTS 7S015SE 8.747 Capacity meets or 13 (52-A401) 24D (A4) FEEDER Power and exceeds demand BREAKER FROM EDG "B" Support CH7Bl Systems

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 15 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Source Evaluation No. ID Eouioment Description Function Relav ID{sl Tvoe BldQ Elev ICRS,H ICRS,v Relay Mfq. & Model Document TRS Result 15G-13U-2 4KV EMERGENCY BUS AC/DC 51GS (A411) Switchgear TURB 56'-6" 6.379 2.468 GE 121AC53A3A SQURTS 7S015SE 8.747 Capacity meets or 14 (52-A401) 24D (A4) FEEDER Power and exceeds demand BREAKER FROM EDG "B" Support

{H7Bl Systems 15G-13U-2 4KV EMERGENCY BUS AC/DC 51V-A, B & C (A401) Switchgear TURB 56'-6" 6.379 2.468 GE 121JCV52A9A SQURTS 50098.7 5.463 Close Breaker 15 (52-A401) 24D(A4)FEEDER Power and from Control BREAKER FROM EDG "B" Support Room (COB)

(H7B) Systems [2]

15G-13U-2 4KV EMERGENCY BUS AC/DC 59 (C39) Control AUX 14'-6" 3.987 2.905 GE 12NGV12A11A EPRI NP-7147-SL, GERS-RLY- 5.333 Capacity meets or 16 (52-A401) 24D (A4) FEEDER Power and Cabinet PPM.4 exceeds demand BREAKER FROM EDG "B" Support

<H7Bl Svstems 15G-13U-2 4KV EMERGENCY BUS AC/DC SX (reviewed for H-7B) Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or 17 (52-A401) 24D (A4) FEEDER Power and (T041) Cabinet CLASS J13P3211 Table 3-1 exceeds demand BREAKER FROM EDG "B" Support

{H7Bl Systems 15G-13U-2 4KV EMERGENCY BUS AC/DC 81 (A401) Switchgear TURB 56'-6" 6.379 2.468 GE 12CFF12A63A SQURTS 50098.7 4.370 Close Breaker 18 (52-A401) 24D (A4) FEEDER Power and from Control BREAKER FROM EDG "B" Support Room (COB)

(H7B) Systems [2]

15G-13U-2 4KV EMERGENCY BUS AC/DC 86 (A401) Switchgear TURB 56'-6" 6.379 2.468 GE 12HEA61B235 EPRI NP-7147-SL, GERS-RLY- 8.000 Capacity meets or 19 (52-A401) 24D (A4) FEEDER Power and AL0.2 exceeds demand BREAKER FROM EOG "B" Support

{H7Bl Systems 15G-13U-2 4KV EMERGENCY BUS AC/DC 86-2/22S3-24D-2 (A411) Switchgear TURB 56'-6" 6.379 2.468 GE 12HFA151A2H (DC) EPRI 3002002997 16.385 Capacity meets or 20 (52-A401) 24D (A4) FEEDER Power and exceeds demand BREAKER FROM EDG "B" Support (H7B) Svstems 15G-13U-2 4KV EMERGENCY BUS AC/DC 87-A, B & C (A401X) Switchgear TURB 56'-6" 0.886 0.628 GE 121JD52A11A SQURTS 61267.2 1.717 Capacity meets or 21 (52-A401) 24D(A4)FEEDER Power and exceeds demand BREAKER FROM EDG "B" Support fH7Bl Svstems 15G-13U-2 4KV EMERGENCY BUS AC/DC BUS A3 LOAD SHED Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-2665, Design Verification of 8.200 Capacity meets or 22 (52-A401) 24D (A4) FEEDER Power and (K634A) (RC02C) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand BREAKER FROM EDG "B" Support Millstone Unit 2 ESAS (H7B) Systems Replacement Relays, Revision 0, June 2004 15G-13U-2 4KV EMERGENCY BUS AC/DC HSR (T041) Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or 23 (52-A401) 24D (A4) FEEDER Power and Cabinet CLASS J13P6511 Table 3-1 exceeds demand BREAKER FROM EDG "B" Support fH7Bl Svstems 15G-13U-2 4KV EMERGENCY BUS AC/DC SDR (reviewed for H-7B) Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or 24 (52-A401) 24D (A4) FEEDER Power and (T041) Cabinet CLASS J13P8111 Table 3-1 exceeds demand BREAKER FROM EDG "B" Support (H7B) Systems 24C1-2 (52- 4KV EMERGENCY BUS AC/DC 3 (A303) Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA151A2H (DC) EPRI 3002002997 16.385 Capacity meets or 25 A303) 24C (A3) FEEDER Power and exceeds demand BREAKER TO UBS Support Svstems

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 16 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Source Evaluation No. ID Equipment Description Function Relay ID{s) Type Bld!l Elev ICRS,tt ICRS,v Relay Mf!l. & Model Document TRS Result 24C1-2 (52- 4KV EMERGENCY BUS AC/DC 50/51-A, B & C (A303) Switchgear TURB 31'-6" 4.810 1.866 GE 121AC53B104A for all SQURTS S1430SE 7.964 Capacity meets or 26 A303) 24C (A3) FEEDER Power and exceeds demand BREAKER TO UBS Support Svstems 24C1-2 (52- 4KV EMERGENCY BUS AC/DC 50GS (A303) Switchgear TURB 31'-6" 4.810 1.866 GE 12PJC11AV1A EPRI 3002002997 7.027 Capacity meets or 27 A303) 24C(A3)FEEDER Power and exceeds demand BREAKER TO UBS Support Systems 24C-2T-2 4KV EMERGENCY BUS AC/DC S0/51-A, B & C (A505) Switchgear TURB 31'-6" 4.810 1.866 GE 121AC53B810A SQURTS S1430SE 7.964 Capacity meets or 28 (52-A305) 24C (A3) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (A5) Support Svstems 24C-2T-2 4KV EMERGENCY BUS AC/DC 51-A, B & C (A305) Switchgear TURB 31'-6" 4.810 1.866 GE 121AC53A101A SQURTS 7S01SSE 8.747 Capacity meets or 29 (52-A305) 24C (A3) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (A5) Support Systems 24C-2T-2 4KV EMERGENCY BUS AC/DC 51GS (A305) Switchgear TURB 31'-6" 4.810 1.866 GE 121ACS3A3A SQURTS 7S015SE 8.747 Capacity meets or 30 (52-A305) 24C (A3) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (A5) Support Svstems 24C-2T-2 4KV EMERGENCY BUS AC/DC 62GS (A505) Switchgear TURB 31'-6" 4.810 1.866 GE 12SAM11B22A EPRI NP-7147-SL, GERS-RLY- 8.000 Capacity meets or 31 (52-A305) 24C (A3) BREAKER - TIE Power and PPM.4 exceeds demand TO 4KV BUS 24E (A5) Support Svstems 24C-2T-2 4KV EMERGENCY BUS AC/DC 86 (A305) Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA151A2H (DC) EPRI 3002004396 16.385 Capacity meets or 32 (52-A30S) 24C (A3) BREAKER - TIE Power and (12HFA1S1A2F), July 201S exceeds demand TO 4KV BUS 24E (AS) Support Svstems 24C-2T-2 4KV EMERGENCY BUS AC/DC 86-1/34B-24E-2 (ASOS) Switchgear TURB 31'-6" 4.810 1.866 GE HFAS1A (DC) EPRI NP-7147-SL, GERS-RLY- 4.800 Capacity meets or 33 (S2-A30S) 24C (A3) BREAKER - TIE Power and ARH.S exceeds demand TO 4KV BUS 24E (AS) Support Systems 24C-2T-2 4KV EMERGENCY BUS AC/DC 86-2 (ASOS) Switchgear TURB 31'-6" 4.810 1.866 GE HFAS1A (DC) EPRI NP-7147-SL, GERS-RLY- 4.800 Capacity meets or 34 (S2-A30S) 24C (A3) BREAKER - TIE Power and ARH.5 exceeds demand TO 4KV BUS 24E (A5) Support Systems 24C-2T-2 4KV EMERGENCY BUS AC/DC 86X (A305) Switchgear TURB 31'-6" 4.810 1.866 GE 12HGA11J52 (DC) EPRI NP-7147-SL, GERS-RLY- 7.040 Capacity meets or 35 (S2-A305) 24C (A3) BREAKER - TIE Power and ARH.5 exceeds demand TO 4KV BUS 24E (AS) Support Systems 24C3-2 (52- 4KV EMERGENCY BUS AC/DC K5341/(SEQ 0) Control AUX 36'-6" 3.987 3.436 MPRASSOC. 0200-0068- MPR-2665, Design Verification of 8.200 Capacity meets or 36 A307) 24C (A3) BREAKER TO Power and (RC02B)K534U(SEQ 4) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P9A Support (RC02B) Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 24C4-2 (52- 4KV EMERGENCY BUS AC/DC SIAS-1/SEQ. 1 (K514A) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-2665, Design Verification of 8.200 Capacity meets or 37 A308) 24C (A3) BREAKER TO Power and (RC02B) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P41A Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June2004

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 17 of 25 Appendix 1 - Relay List and Evaluation Data Seismic Hi!:!h-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Source Evaluation No. ID Eauioment Descriotion Function Relav IDlsl Tvoe Bid a Elev ICRS,H ICRS,v Relav Mfa. & Model Document TRS Result 24CS*2 (S2- 4KV EMERGENCY BUS AC/DC SIAS SEQ. 3 (KS17A) Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-266S, Design Verification of 8.200 Capacity meets or 38 A309) 24C (A3) BREAKER TO Power and (RC02B) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P42A Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 24C6-2 (S2- 4KV EMERGENCY BUS AC/DC CSAS1 SEQ. 3 (KS09A) Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-266S, Design Verification of 8.200 Capacity meets or 39 A310) 24C (A3) BREAKER TO Power and (RC02B) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P43A Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 24C7-2 (S2- 4KV EMERGENCY BUS AC/DC SIAS 1/SEQ 2 (KS16A) Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-266S, Design Verification of 8.200 Capacity meets or 40 A311) 24C (A3) BREAKER TO Power and (RC02B) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P11A Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 24D1-2 (S2- 4KV EMERGENCY BUS AC/DC SIAS 2/SEQ 2 (K616A) Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-266S, Design Verification of 8.200 Capacity meets or 41 A402) 24D (A4) BREAKER TO Power and (RC02C) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P11C Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 24D2-2 (S2- 4KV EMERGENCY BUS AC/DC SIAS-2/SEQ. 1 (K614A) Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-266S, Design Verification of 8.200 Capacity meets or 42 A403) 24D (A4) BREAKER TO Power and (RC02C) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P41C Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 24D-2T-2 4KV EMERGENCY BUS AC/DC S1-A, B & C (A408) Switchgear TURB S6'..S" 6.379 2.468 GE 121ACS3A101A SQURTS 7S01SSE 8.747 Capacity meets or 43 (S2-A408) 24D (A4) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (AS) Support Systems 24D-2T-2 4KV EMERGENCY BUS AC/DC S1GS (A408) Switchgear TURB S6'..S" 6.379 2.468 GE 121ACS3A3A SQURTS 7S01SSE 8.747 Capacity meets or 44 (S2-A408) 24D (A4) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (AS) Support Systems 24D-2T-2 4KV EMERGENCY BUS AC/DC 86 (A408) Switchgear TURB S6'..S" 6.379 2.468 GE 12HFA1S1A2H (DC) EPRI 3002002997 16.38S Capacity meets or 4S (S2-A408) 24D (A4) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (AS) Support Svstems 24D-2T-2 4KV EMERGENCY BUS AC/DC 86-1/34B-24E-2 (ASOS) Switchgear TURB 31'..S" 4.810 1.866 GE HFAS1A (DC) ( EPRI NP-7147-SL, GERS-RLY- 4.800 Capacity meets or 46 (S2-A408) 24D (A4) BREAKER - TIE Power and ARH.S exceeds demand TO 4KV BUS 24E (AS) Support Svstems 24D-2T-2 4KV EMERGENCY BUS AC/DC 86X (A408) Switchgear TURB S6'..S" 6.379 2.468 GE 12HGA11JS2 (DC) EPRI NP-7147-SL, GERS-RLY- 7.040 Capacity meets or 47 (S2-A408) 24D (A4) BREAKER - TIE Power and ARH.S exceeds demand TO 4KV BUS 24E (AS) Support Svstems 2403-2 (S2- 4KV EMERGENCY BUS AC/DC SIAS2 SEQ. 3 (K617A) Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-266S, Design Verification of 8.200 Capacity meets or 48 A404) 24D (A4) BREAKER TO Power and (RC02C) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P42B Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 18 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacitv Item Equipment Key Safety Cabinet Seismic Capacity Source Evaluation No. ID Eauioment Descriotion Function Relav ID{sl Tvoe Bid a Elev ICRS,H ICRS,v Relav Mfa. & Model Document TRS Result 24D4-2 (S2- 4KV EMERGENCY BUS AC/DC CSAS2 SEQ. 3 (K609A) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-266S, Design Verification of 8.200 Capacity meets or 49 A40S) 24D (A4) BREAKER TO Power and (RC02C) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P43B Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 24DS-2 (S2- 4KV EMERGENCY BUS AC/DC K634U(SEQ 0) (RC02C) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-266S, Design Verification of 8.200 Capacity meets or so A406) 24D (A4) BREAKER TO Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P9B Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June2004 24D5-2 (S2- 4KV EMERGENCY BUS AC/DC K634M/(SEQ 4) (RC02C) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-266S, Design Verification of 8.200 Capacity meets or S1 A406) 24D (A4) BREAKER TO Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P9B Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 24D7-2 (S2- 4KV EMERGENCY BUS AC/DC 3 (A409) Switchgear TURB S6'-6" 6.379 2.468 GE 12HFA1S1A2H (DC) EPRI 3002002997 16.38S Capacity meets or S2 A409) 24D (A4) FEEDER Power and exceeds demand BREAKER TO UB6 Support Svstems 24D7-2 (S2- 4KV EMERGENCY BUS AC/DC SO/S 1-A. B & C (A409) Switchgear TURB S6'-6" 6.379 2.468 GE 121ACS3B101A SQURTS S1430SE 7.964 Capacity meets or S3 A409) 24D (A4) FEEDER Power and exceeds demand BREAKER TO UB6 Support Svstems 24D7-2 (S2- 4KV EMERGENCY BUS AC/DC SOGS (A409) Switchgear TURB S6'-6" 6.379 2.468 GE 12PJC11AV1A EPRI 3002002997 7.027 Capacity meets or 54 A409) 24D (A4) FEEDER Power and exceeds demand BREAKER TO UB6 Support Systems 24E2-2 (S2- 4KV EMERGENCY BUS AC/DC KSS14B (RC02E) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-266S, Design Verification of 8.200 Capacity meets or SS AS03) 24E (AS) BREAKER TO Power and KS614B (RC02E) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P41B Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 24E3-2 (S2- 4KV EMERGENCY BUS AC/DC SIAS S/SEQ 2 (KSS16B) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-266S, Design Verification of 8.200 Capacity meets or S6 AS04) 24E (AS) BREAKER TO Power and (RC02E) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P11B Support SIAS S/SEQ 2 (KS616B) Millstone Unit 2 ESAS Systems (RC02E) Replacement Relays, Revision 0, June 2004 2-FW-43A SIG NO. 1 STEAM Core Cooling .20XIZ1-S276 (COS) Control AUX 36'-6" 3.987 3.436 GE 12HFA1S1A2H (DC) EPRI 3002002997 13.654 Capacity meets or S7 GENERATOR AUX Cabinet exceeds demand FEEDWATER REGULATING VALVE -

AVAILABLE TO THROTILE 2-FW-43B SIG NO. 2 STEAM Core Cooling 20X/Z2-S279 (COS) Control AUX 36'-6" 3.987 3.436 GE 12HFA1S1A2H (DC) EPRI 3002002997 13.654 Capacity meets or S8 GENERATOR AUX Cabinet exceeds demand FEEDWATER REGULATING VALVE -

AVAILABLE TO THROTILE 2-FW-44 AFW PUMP DISCHARGE Core Cooling 42-C/a (B6203) MCC AUX 36'-6" 0.886 0.731 STARTER/CONTACTOR EPRI NP-S223-SLR1, GERS- 1.200 Capacity meets or S9 MCC.9 HEADER CROSSTIE [1] exceeds demand VALVE

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 19 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Source Evaluation No. ID Eauipment Description Function Relay ID(sl Type Bid a Elev ICRS,H ICRS,v Relav Mfa. & Model Document TRS Result 2-MS-201 TDAFW STEAM SUPPLY Core Cooling 42-C/a (B5202) MCC AUX 38'.Q" 0.886 0.731 STARTER/CONTACTOR EPRI NP-5223-SLR1, GERS- 1.200 Capacity meets or 60 VALVE FROM S/G NO. 1 [1] MCC.9 exceeds demand H-7A EMERGENCY DIESEL AC/DC 5/DG02 (T040) Control AUX 14'.Q" 3.987 2.905 AGASTAT E7022PE002 EPRI NP-7147-SL, GERS-RLY- 6.667 Capacity meets or 61 GENERATOR H-7A- DC Power and Cabinet PNT.7 exceeds demand CONTROL POWER FROM Support DV10 Svstems H-7A EMERGENCY DIESEL AC/DC 5X (T040) Control AUX 14'.Q" 3.987 2.905 TELEMECHANIOUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or 62 GENERATOR H-7A - DC Cabinet Table 3-1 Power and CLASS J13P3211 exceeds demand CONTROL POWER FROM Support DV10 Svstems H-7A EMERGENCY DIESEL AC/DC 86 (A312) Switchgear TURB 31'.Q" 4.810 1.866 GE 12HEA618235 EPRI NP-7147-SL, GERS-RLY- 8.000 Capacity meets or 63 GENERATOR H-7A- DC Power and AL0.2 exceeds demand CONTROL POWER FROM Support DV10 Svstems H-7A EMERGENCY DIESEL AC/DC EOR(T040) Control AUX 14'.Q" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SOURTS), 9.467 Capacity meets or 64 GENERATOR H-7A- DC Power and Cabinet CLASS J13P4111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Svstems H-7A EMERGENCY DIESEL AC/DC ESS Control AUX 14'.Q" 3.987 2.905 TELEMECHANIOUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or 65 GENERATOR H-7A- DC Power and Cabinet CLASS J13P4111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Svstems H-7A EMERGENCY DIESEL AC/DC K4 (C38) Control AUX 14'.Q" 3.987 2.905 ALLEN BRADLEY 700DC- EPRI 3002002997 12.821 Capacity meets or 66 GENERATOR H-7A- DC Power and Cabinet P800Z1 exceeds demand CONTROL POWER FROM Support DV10 Systems H-7A EMERGENCY DIESEL AC/DC K524C (SIAS1) Control AUX 36'.Q" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-2665, Design Verification of 8.200 Capacity meets or 67 GENERATOR H-7A - DC Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand CONTROL POWER FROM Support Millstone Unit 2 ESAS DV10 Systems Replacement Relays, Revision 0, June 2004 H-7A EMERGENCY DIESEL AC/DC K530A (LP1) Control AUX 36'.Q" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-2665, Design Verification of 8.200 Capacity meets or 68 GENERATOR H-7A - DC Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand CONTROL POWER FROM Support Millstone Unit 2 ESAS DV10 Systems Replacement Relays, Revision 0, June 2004 H-7A EMERGENCY DIESEL AC/DC OP1 (T040) Control AUX 14'.Q" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or 69 GENERATOR H-7A- DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Systems H-7A EMERGENCY DIESEL AC/DC OP2 (T040) Control AUX 14'.Q" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or 70 GENERATOR H-7A- DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Svstems H-7A EMERGENCY DIESEL AC/DC OP3 (T040) Control AUX 14'.Q" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-VZ (SQURTS), 9.467 Capacity meets or 71 GENERATOR H-7A- DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Systems

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 20of25 Appendix 1 - Relay List and Evaluation Data Seismic Hicth-frequencv Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Source Evaluation No. ID Eauioment Descriotion Function Relay ID(s) Tvoe Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Document TRS Result H-7A EMERGENCY DIESEL AC/DC OPL 1 (T040) Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO. EPRI NP-5223-SLR1, GERS- 4.000 Capacity meets or 72 GENERATOR H-7 A - DC Power and Cabinet 222-10/COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV10 Systems 729 H-7A EMERGENCY DIESEL AC/DC OPL2 (T040) Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO. EPRI NP-5223-SLR1, GERS- 4.000 Capacity meets or 73 GENERATOR H-7A- DC Power and Cabinet 222-10/ COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV10 Systems 729 H-7A EMERGENCY DIESEL AC/DC OPL3 (T040) Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO. EPRI NP-5223-SLR1, GERS- 4.000 Capacity meets or 74 GENERATOR H-7 A- DC Power and Cabinet 222-10 I COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV10 Svstems 729 H-7A EMERGENCY DIESEL AC/DC Relay 4 (T040) Control AUX 14'-6" 3.987 2.905 GE CR120BD05041 EPRI NP-7147-SL, GERS-RLY- 5.667 Capacity meets or 75 GENERATOR H-7A- DC Power and Cabinet Al1.4 (increased by SOURTS TR- exceeds demand CONTROL POWER FROM Support 105988-V2, Table 3-1)

DV10 Svstems H-7A EMERGENCY DIESEL AC/DC SDR (T040) Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or 76 GENERATOR H-7A- DC Power and Cabinet CLASS J13P8111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Systems H-7B EMERGENCY DIESEL AC/DC 5/DG02 (T041) Control AUX 14'-6" 3.987 2.905 AGASTAT E7022PE002 EPRI NP-7147-SL, GERS-RLY- 6.667 Capacity meets or 77 GENERATOR H-7B - DC Power and Cabinet PNT.7 exceeds demand CONTROL POWER FROM Support DV20 Systems H-7B EMERGENCY DIESEL AC/DC 5X (T041) Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or 78 GENERATOR H-7B - DC Power and Cabinet CLASS J13P3211 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Systems H-7B EMERGENCY DIESEL AC/DC 86 (A401) Switchgear TURB 56'-6" 6.379 2.468 GE 12HEA61B235 EPRI NP-7147-SL, GERS-RLY- 8.000 Capacity meets or 79 GENERATOR H-7B - DC Power and AL0.2 exceeds demand CONTROL POWER FROM Support DV20 Systems H-7B EMERGENCY DIESEL AC/DC EOR (T041) Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or 80 GENERATOR H DC Power and Cabinet CLASS J13P4111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Svstems H-7B EMERGENCY DIESEL AC/DC ESS Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SOURTS), 9.467 Capacity meets or 81 GENERATOR H-7B - DC Power and Cabinet CLASS J13P4111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Systems H-7B EMERGENCY DIESEL AC/DC K4 (C39) Control AUX 14'-6" 3.987 2.905 ALLEN BRADLEY 700DC- EPRI 3002002997 12.821 Capacity meets or 82 GENERATOR H-7B - DC Power and Cabinet P800Z1 exceeds demand CONTROL POWER FROM Support DV20 Svstems H-7B EMERGENCY DIESEL AC/DC K624C (SIAS2) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-2665, Design Verification of 8.200 Capacity meets or 83 GENERATOR H-7B - DC Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand CONTROL POWER FROM Support Millstone Unit 2 ESAS DV20 Systems Replacement Relays, Revision 0, June 2004

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 21 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Source Evaluation No. ID EQuipment Description Function Relay ID(sl Type BldQ Elev ICRS,M ICRS,v Relay MfQ. & Model Document TRS Result H-7B EMERGENCY DIESEL AC/DC K630A (LP2) Control AUX 36'-6'.' 3.987 3.436 MPR ASSOC. 0200-0068- MPR-2665, Design Verification of 8.200 Capacity meets or 84 GENERATOR H-7B - DC Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand CONTROL POWER FROM Support Millstone Unit 2 ESAS DV20 Systems Replacement Relays, Revision 0, June 2004 H-7B EMERGENCY DIESEL AC/DC OP1 (T041) Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or 85 GENERATOR H-7B - DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Svstems H-7B EMERGENCY DIESEL AC/DC OP2 (T041} Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS}, 9.467 Capacity meets or 86 GENERATOR H-7B - DC Power and Cabinet Table 3-1 CLASS J13P6111 exceeds demand CONTROL POWER FROM Support DV20 Systems H-7B EMERGENCY DIESEL AC/DC OP3 (T041} Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS}, 9.467 Capacity meets or 87 GENERATOR H-7B - DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Svstems H-7B EMERGENCY DIESEL AC/DC OPL1 (T041} Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO. EPRI NP-5223-SLR1, GERS- 4.000 Capacity meets or 88 GENERATOR H-7B - DC Power and Cabinet 222-10 I COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV20 Svstems 729 H-7B EMERGENCY DIESEL AC/DC OPL2 (T041} Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO. EPRI NP-5223-SLR1, GERS- 4.000 Capacity meets or 89 GENERATOR H-7B - DC Power and Cabinet 222-10 I COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV20 Systems 729 H-7B EMERGENCY DIESEL AC/DC OPL3 (T041} Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO. EPRI NP-5223-SLR1, GERS- 4.000 Capacity meets or 90 GENERATOR H-7B - DC Power and Cabinet 222-10 I COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV20 Systems 729 H-7B EMERGENCY DIESEL AC/DC Relay 4 (T041 } Control AUX 14'-6" 3.987 2.905 GE CR120BD05041 EPRI NP-7147-SL, GERS-RLY- 5.667 Capacity meets or 91 GENERATOR H-7B - DC Power and Cabinet Al1.4 (increased by SOURTS TR- exceeds demand CONTROL POWER FROM Support 105988-V2, Table 3-1)

DV20 Systems H-7B EMERGENCY DIESEL AC/DC SDR (T041} Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS}, 9.467 Capacity meets or 92 GENERATOR H-7B - DC Power and Cabinet CLASS J13P8111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Systems P-5A SERVICE WATER PUMP A AC/DC 3 (A306} Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA151A2H (DC} EPRI 3002002997 16.385 Capacity meets or 93 (AC POWER FROM 4KV Power and exceeds demand BUS 24C IA3], 24C2-2 l52- Support A306ll Svstems P-5A SERVICE WATER PUMP A AC/DC 50/51-A, B & C (A306} Switchgear TURB 31'-6" 4.810 1.866 GE 121AC66K8A EPRI 3002002997 6.923 Capacity meets or 94 (AC POWER FROM 4KV Power and exceeds demand BUS 24C [A3], 24C2-2 [52- Support A3061) Systems P-5A SERVICE WATER PUMP A AC/DC 50GS (A306} Switchgear TURB 31'-6" 4.810 1.866 GE 12PJC11AV1A EPRI 3002002997 7.027 Capacity meets or 95 (AC POWER FROM 4KV Power and exceeds demand BUS 24C [A3], 24C2-2 [52- Support A3061) Systems

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 22 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Source Evaluation No. ID E<1uipment Description Function Relav IDCsl Tvpe Bld<1 Elev ICRS," ICRS,v Relav Mf<1. & Model Document TRS Result P-5A SERVICE WATER PUMP A AC/DC LOAD SHED (K529A) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-2665, Design Verification of 8.200 Capacity meets or 96 (AC POWER FROM 4KV Power and (RC02B) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand BUS 24C [A3], 24C2-2 [52- Support Millstone Unit 2 ESAS A306]) Systems Replacement Relays, Revision 0, June2004 P-5B SERVICE WATER PUMP B AC/DC 3 (AS02) Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA1S1A2H (DC) EPRI 3002002997 16.38S Capacity meets or 97 (SWING) (AC POWER Power and exceeds demand FROM 4KV BUS 24E [AS], Support 24E1-2 IS2-AS02ll Svstems P-SB SERVICE WATER PUMP B AC/DC SO/S1-A, B & C (AS02) Switchgear TURB 31'-6" 4.810 1.866 GE 121AC66K8A EPRI 3002002997 6.923 Capacity meets or 98 (SWING) (AC POWER Power and exceeds demand FROM 4KV BUS 24E [AS], Support 24E1-2 f52-A502ll Svstems P-SB SERVICE WATER PUMP B AC/DC SOGS (AS02) Switchgear TURB 31'-6" 4.810 1.866 GE 12PJC11AV1A EPRI 3002002997 7.027 Capacity meets or 99 (SWING) (AC POWER Power and exceeds demand FROM 4KV BUS 24E [A5]. Support 24E1-2 f52-A502ll Svstems P-5B SERVICE WATER PUMP B AC/DC LOAD SHED (KSS31A, Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-2665. Design Verification of 8.200 Capacity meets or 100 (SWING) (AC POWER Power and KS631A) (RC02E) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand FROM 4KV BUS 24E [A5], Support Millstone Unit 2 ESAS 24E1-2 [52-AS02]) Systems Replacement Relays, Revision 0, June 2004 P-5C SERVICE WATER PUMP C AC/DC 3 (A407) Switchgear TURB S6'-6" 6.379 2.468 GE 12HFA1S1A2H (DC) EPRI 3002002997 16.385 Capacity meets or 101 (AC POWER FROM 4KV Power and exceeds demand BUS 24D [A4], 24D6-2 [52- Support A4071) Systems P-5C SERVICE WATER PUMP C AC/DC SO/S1-A, B & C (A407) Switchgear TURB S6'-6" 6.379 2.468 GE 121AC66K8A EPRI 3002002997 6.923 Capacity meets or 102 (AC POWER FROM 4KV Power and exceeds demand BUS 24D [A4], 24D6-2 [52- Support A407ll Svstems P-5C SERVICE WATER PUMP C AC/DC 50GS (A407) Switchgear TURB 56'-6" 6.379 2.468 GE 12PJC11AV1A EPRI 3002002997 7.027 Capacity meets or 103 (AC POWER FROM 4KV Power and exceeds demand BUS 24D [A4], 24D6-2 [52- Support A407ll Svstems P-5C SERVICE WATER PUMP C AC/DC LOAD SHED (K629A) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068- MPR-2665, Design Verification of 8.200 Capacity meets or 104 (AC POWER FROM 4KV Power and (RC02C) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand BUS 24D [A4], 24D6-2 [52- Support Millstone Unit 2 ESAS A407]) Systems Replacement Relays, Revision o, June 2004 Notes:

1. GERS capacity data for starter/contactors from EPRI NP-5223-SLR1, GERS-MCC.9 is not model-specific.
2. See Section 5.1.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 23 of 25 Appendix 2 - Representative Sample Component Evaluations This appendix provides two (2) representative sample component evaluations for relays selected from the list in Appendix 1.

1st Example - Equipment ID 15G-12U-2 (52-A312) [Line Item 7 from Appendix 1]

Description of component:

Equipment ID 15G-12U-2 (52-A312) - 4KV EMERGENCY BUS 24C (A3) FEEDER BREAKER FROM EOG "A" (H7A) - supporting the AC/DC Power and Support Systems function. Relay from seal-in/ lockout circuit analysis - relay 86 (A312). Relay is a GE Model 12HEA61B235.

Plant Location:

Mounted in panel A312 in the Turbine Building, Vital 4kV Electrical Equipment Room, Elevation 31'6". Cabinet type: Switchgear.

Description of Mounting Point Demand Estimate:

Horizontal Response Estimate - Turbine Building foundation elevation: 14' 6". Panel A312 is 31'6" -14'6" = 17 feet above foundation. AFsH = 1.583 (from Reference 8, Figure 4-3). SAGMRs

=

0.422g (from Reference 4). Then, SAcH 0.422

  • 1.583 0.668g.

Vertical Response Estimate - As described in Section 3.1.2, SAvGMRs = 0.309g. AFsv = 1.283

(from Reference 8, Figure 4-4). Then, SAcv 0.309

  • 1.283 0.397g.

For cabinet type Switchgear, AFcH =7.2 and AFcv =4.7 (from Reference 8, Section 4.4). Then, mounting point demand is:

ICRScH =0.668

  • 7.2 =4.81 Og ICRScv = 0.397
  • 4. 7 = 1.866g Description of Relay Capacity:

The capacity of the relay is based on EPRI GERS - GERS-RLY-AL0.2 (Reference 9 and 10).

For this relay, GERS capacity for non-operating, normally closed contact is applicable - SAT =

10g.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 24 of 25 Appendix 2 - Representative Sample Component Evaluations The CDFM knockdown factor, FK, of 1.5 was selected based on the GERS capacity that represented the lowest test level without chatter. The FMs factor value of 1.2 was selected based on the base-mounted cantilever cabinet (switchgear) relay mounting.

Then, TRS = (10/1.5)

  • 1.2 = 8g.

Capacity I Demand Ratio:

CID =TRS / ICRSc

= 8g / 4.81 Og =1.663 - Horizontal (governing) - acceptable Capacity exceeds demand.

2"d Example - Equipment ID 2-FW-43A [Line Item 57 from Appendix 1]

Description of component:

Equipment ID 2-FW-43A - SIG NO. 1 STEAM GENERATOR AUX FEEDWATER REGULATING VALVE -AVAILABLE TO THROTTLE - supporting the Core Cooling (turbine-driven AFW pump feedwater flow to steam generator) function. Relay from seal-in I lockout circuit analysis -

20X/Z1-5276 (C05). Relay is a GE Model 12HFA151A2H (DC).

Plant Location:

Mounted in panel C05 in the Auxiliary Building, Main Control Room, Elevation 36'6". Cabinet type: Control Cabinet (benchboard).

Description of Mounting Point Demand Estimate:

Horizontal Response Estimate - Auxiliary Building foundation elevation: (-)45' 6". Panel C05 is 36' 6" - ((-)45' 6") = 82 feet above foundation. AFsH = 2.1 (from Reference 8, Figure 4-3).

SAGMRS = 0.422g (from Reference 4). Then, SAcH = 0.422

  • 2.1 = 0.886g.

Vertical Response Estimate - As described in Section 3.1.2, SAvGMRS = 0.309g. AFsv = 2.367 (from Reference 8, Figure 4-4). Then, SAcv = 0.309

  • 2.367 = 0.731g.

For cabinet type Control Cabinet, AFcH =4.5 and AFcv = 4.7 (from Reference 8, Section 4.4).

Serial No.16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 25 of 25 Appendix 2 - Representative Sample Component Evaluations Then, mounting point demand is:

ICRScH = 0.886

  • 4.5 = 3.987g ICRScv =0.731
  • 4.7 =3.436g Description of Relay Capacity:

The capacity of the relay is based on EPRI Report 3002002997 (Reference 7) fragility threshold

=

test results for GE 12HFA151A2F: SAr 21.3g. Test results for GE 12HFA151A2F were used based on similarity with the installed GE 12HFA151A2H relay.

The CDFM knockdown factor, FK, of 1.56 was selected based on Reference 8, Table 4-2 (HF Test Program, Fragility Threshold). The FMs factor value of 1.0 was selected based on the benchboard cabinet relay mounting (similar stiffness in three directions).

Then, TRS =(21.3/1.56)

  • 1.0 =13.654g.

Capacity I Demand Ratio:

CID =TRS / ICRSc

= 13.654g / 3.987g = 3.425 - Horizontal (governing) - acceptable Capacity exceeds demand.

Serial No.16-455 Docket Nos. 50-336/423 ATTACHMENT 2 HIGH-FREQUENCY SENSITIVE EQUIPMENT FUNCTIONAL CONFIRMATION FOR MILLSTONE UNIT 3 MILLSTONE POWER STATION UNIT 3 DOMINION NUCLEAR CONNECTICUT, INC.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 1 of 54

1.0 INTRODUCTION

1.1 PURPOSE The purpose of this attachment is to provide information requested by the NRC in its March 12, 2012 10 CFR 50.54(f) letter issued to all power reactor licensees and holders of construction permits in active or deferred status (Reference 1). Specifically, this attachment provides the results of the High Frequency Confirmation required by Item (4), Enclosure 1, Recommendation 2.1: Seismic, of the letter.

The High Frequency Confirmation evaluation undertaken for MPS Unit 3 (MPS3) used the methodologies in EPRI Report 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation" (Reference 8) as described herein.

A summary of the High Frequency Confirmation evaluations and results are provided below.

1.2 BACKGROUND

Following the accident at the Fukushima Dai-ichi nuclear power plant resulting from the March 11, 2011, Great Tohoku Earthquake and subsequent tsunami, the Nuclear Regulatory Commission (NRC) established a Near Term Task Force (NTTF) to conduct a systematic review of NRC processes and regulations and to determine if the agency should make additional improvements to its regulatory system. The NTIF developed a set of recommendations intended to clarify and strengthen the regulatory framework for protection against natural phenomena. Subsequently, the NRC issued a 10 CFR 50.54(f) letter on March 12, 2012 (Reference 1), requesting information to assure that these recommendations are addressed by all U.S. nuclear power plants. The 10 CFR 50.54(f) letter requests that licensees and holders of construction permits under 10 CFR Part 50 reevaluate the seismic hazards at their sites against present-day NRC requirements and guidance. Included in the 50.54(f) letter was a request that licensees perform a "confirmation, if necessary, that SSCs, which may be affected by high-frequency ground motion, will maintain their functions important to safety."

EPRI Report 1025287, "Seismic Evaluation Guidan~e: Screening, Prioritization and Implementation Details (SPID) for the resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic" (Reference 6) provided screening, prioritization, and implementation details to the U.S. nuclear utility industry for responding to the NRC 50.54(f) letter. This report was developed with NRC participation and is endorsed by the NRC. The SPID included guiaance for determining which plants should perform a High Frequency Confirmation and identified the types of components that should be evaluated in the evaluation.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 2 of 54 Subsequent guidance for performing a High Frequency Confirmation was provided in EPRI Report 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation," (Reference 8) and was endorsed by the NRC in a letter dated September 17, 2015 (Reference 3). Final screening identifying plants needing to perform a High Frequency Confirmation was provided by NRC in a letter dated October 27, 2015 (Reference 2).

On March 31, 2014, Millstone Power Station submitted a reevaluated seismic hazard to the NRC as a part of the Seismic Hazard and Screening Report (Reference 4). By letter dated October 27, 2015 (Reference 2), the NRC transmitted the results of. the screening and prioritization review of the seismic hazards reevaluation.

The reevaluated seismic hazard was developed in order to provide the information requested by the NRC in Reference 1 and does not constitute a new or supplemental seismic design or licensing basis for MPS3. As such, the conclusions of the High Frequency Confirmation review do not result in a challenge to the design basis function of any plant structures, systems, or components important to safety.

1.3 APPROACH EPRI Report 3002004396 (Reference 8) was used for the MPS3 engineering evaluations described in this attachment. Section 4.1 of Reference 8 provided general steps to follow for the high-frequency confirmation component evaluation. Accordingly, the following topics are addressed in the subsequent sections of this attachment:

  • Selection of components and a list of specific components for high-frequency confirmation
  • Estimation of seismic demand for subject components
  • Estimation of seismic capacity for subject components
  • Summary of high-frequency evaluations for subject components
  • Summary of Results 1.4 PLANT SCREENING MPS3 submitted the reevaluated seismic hazard information, including the GMRS, to the NRC on March 31, 2014 (Reference 4). In letters dated December 15, 2015 and March 15, 2016 (References 12 and 13, respectively), the NRC staff concluded that the submitted GMRS adequately characterizes the reevaluated seismic hazard for the MPS site.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 3 of 54 The NRC final screening determination letter (Reference 2) concluded that the MPS3 GMRS to SSE comparison resulted in a need to perform a High Frequency Confirmation in accordance with the screening criteria in the SPID (Reference 6).

1.5 INITIAL CONDITIONS For the purposes of this High Frequency Confirmation review, the plant is assumed to be operating normally prior to the occurrence of the severe seismic event with offsite power sources available. The seismic event was presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor trip.

2.0 SELECTION OF COMPONENTS FOR HIGH-FREQUENCY SCREENING The fundamental objective of the high-frequency confirmation review was to determine whether the occurrence of a seismic event could cause critical equipment to fail to perform as necessary.

An optimized evaluation process was applied that focused on achieving a safe and stable plant state following a seismic event. As described in Reference 8, this state is achieved by confirming that key plant safety functions critical to immediate plant safety are preserved (reactor trip, reactor coolant system inventory and pressure control, and core cooling) and that the plant operators have the necessary power available to achieve and maintain this state immediately following the seismic event (AC/DC power and support systems).

Within the applicable functions, the components that would need a high-frequency confirmation are contact control devices subject to intermittent states (e.g., relay contact chatter) in seal-in or lockout circuits. Accordingly, the objective of the review, as stated in Section 4.2.1 of Reference 8, was to determine if seismic induced high-frequency relay chatter would prevent the completion of key plant safety functions.

For each function, a review was performed to identify plant equipment supporting the function.

The control circuit schematic diagrams for this equipment were then reviewed using the guidance from EPRI NP-7148 (Reference 11) and EPRI Report 3002004396 (Reference 8) to determine whether seismic-induced contact chatter could result in seal-in or loc~out (SILO) conditions that could have an adverse impact on the equipment capability to support key plant safety functions. From this review, a list of contact control devices for which contact chatter could result in SILO conditions was identified. These devices (termed "relays" for the purposes of this evaluation) were further evaluated for seismic capacity margin, as described in Sections 3 and 4.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 4 of 54 2.1 REACTOR TRIP/SCRAM Consistent with the guidance in Reference 8, the design requirements for reactor trip systems preclude the application of seal-in or lockout circuits that prevent reactor trip/SCRAM functions and no high-frequency component chatter review is necessary for this function.

2.2 REACTOR COOLANT SYSTEM INVENTORY CONTROL The reactor coolant system inventory control systems were reviewed to identify components that could be susceptible to adverse operation due to contact control devices in SILO circuits that could create loss of coolant-type events, such as inadvertent opening of a pressurizer power-operated relief valve (PORV).

The following components were identified for control circuit review for SILO conditions:

  • Pressurizer PORVs 2.3 REACTOR COOLANT SYSTEM PRESSURE CONTROL Consistent with the guidance in Reference 8, no specific high-frequency component chatter review is required for this function.

2.4 CORE COOLING The core cooling systems were reviewed to identify components that could be susceptible to adverse operation due to contact control devices in SILO circuits that would prevent accomplishment of the core cooling function. The intent of the review was to ensure at least a single train of non-AC power driven decay heat removal capability was maintained (e.g.,

auxiliary feedwater flow from at least one pump to at least one steam generator).

The following components were identified for control circuit review for SILO conditions:

  • Atmospheric Steam Dump Valves
  • Turbine-driven AFW Pump Steam Supply Valves
  • Turbine-driven AFW Pump Trip-Throttle Valve
  • Turbine-driven AFW Pump 2.5 AC/DC POWER SUPPORT SYSTEMS The AC and DC power support systems were reviewed to identify components that could be

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 5 of 54 susceptible to adverse operation due to contact control devices in SILO circuits that prevent the availability of DC and/or AC power sources. The following AC and DC power support systems were reviewed:

  • EOG Support Systems and associated Switchgear, Load Centers, and MCCs,
  • Battery Chargers and Inverters,
  • Vital 125vdc and 120vac Distribution The analysis considered the reactor operating normally at power with no equipment failures prior to the seismic event. The EDGs are not operating, but are available. The seismic event was presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor trip.

In response to bus under-voltage relaying detecting the LOOP, the Class 1E control systems must automatically shed loads, start the EDGs, and sequentially load the diesel generators as designed. Ancillary systems required for EOG operation, as well as Class 1E battery chargers and inverters, must function as necessary.

The following components were identified for control circuit review for SILO conditions:

  • 4kV Emergency Bus Feeder Breakers (Emergency and Offsite sources)
  • 480v Emergency Bus Feeder Breakers
  • 4kV I 480v Emergency Bus Transformers and 4kV Supply Breakers
  • 4kV Emergency Bus Load Breakers to Service Water, AFW, Containment Recirculation, Charging, Safety Injection, Residual Heat Removal, Quench Spray, and Reactor Plant Component Cooling Water Pumps and Control Building Chiller Units
  • 480v Emergency Bus Load Breakers to 125vdc Battery Chargers, various MCCs, and Load Centers
  • 125vdc Batteries, DC Susses, Battery Chargers, and Distribution System Components
  • 120vac Vital Inverters and Distribution System Components
  • EOG Air Start, Lubricating Oil, and Fuel Oil Systems
  • EOG Room Ventilation Fans and Dampers

SUMMARY

OF SELECTED COMPONENTS A list of the contact devices requiring a high-frequency confirmation is provided in Appendix 1.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 6 of 54 3.0 SEISMIC DEMAND ESTIMATE The high-frequency functional confirmation process for the relays subject to the potential for seismic-induced contact chatter requires the mounting point seismic demand, which requires the development of in-structure seismic demand based on the GMRS input and the in-cabinet amplification of the in-structure floor motion at the location of the electrical cabinet housing the relay.

The calculation of in-structure response typically requires the development of a foundation input response spectrum (FIRS) and dynamic analysis of the structure. MPS3 has not developed these inputs from the GMRS for plant structures. Therefore, consistent with the guidance in Reference 8, Section 4.3, the in-structure response. for buildings and floor elevations where subject relays are located was estimated as described in subsection 3.1 below.

The mounting point high-frequency seismic demand was determined consistent with the guidance in Reference 8, Sections 4.4 and 4.5, and is described in subsection 3.2 below.

3.1 ESTIMATE OF HIGH FREQUENCY IN-STRUCTURE RESPONSE Per Reference 8, Sect. 4.3, the basis for calculating high-frequency seismic demand in the horizontal direction is the horizontal control point GMRS, which was developed in response to Reference 1 and reported in the MPS Seismic Hazard and Screening Report (Reference 4). As noted in Reference 8, Section 3.3, The Control Point GMRS developed for these rock sites are typically appropriate for all rock founded structures and additional FIRS estimates are not deemed necessary for the high frequency confirmation effort.

The structures of interest for the high-frequency confirmation are the Control Building, the Emergency Generator Enclosure Building, the Auxiliary Building and the Engineered Safety Features (ESF) Building. MPS is a rock site, and the Auxiliary Building and ESF Building are founded on bedrock. The Control Building and. the Emergency Generator Enclosure Building are founded on shallow soil overburden over bedrock.

The Control Building is founded on basal till, of thickness varying between 1 foot on the east side and 15 feet on the west, overlying bedrock. Isolated zones of softened till were excavated and replaced with fill concrete or compacted structural backfill. The Emergency Generator Enclosure Building wall footings are founded on basal till varying in thickness from less than 1O feet to 30 feet overlying bedrock. Based on velocity measurements obtained during site subsurface explorations conducted for initial plant construction, a representative shear wave velocity 0fs) for the dense basal till overburden material is 2200 fps.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 7 of 54 Section 3.3 of Reference 8 describes that, for buildings on shallow soil layers at rock sites, the soil layers typically shift the frequency range of seismic input towards the lower frequency range of the response spectrum. Given the guidance from Reference 8, for purposes of high-frequency sensitive equipment evaluations in this attachment, the GMRS is likely to be richer in high-frequency content than a FIRS for a shallow layer soil-founded structure at a rock site such as the Control Building and the Emergency Generator Enclosure Building. Therefore, the control point GMRS is an appropriate review level earthquake (RLE) input for the purposes of the high-frequency confirmation .

.3.1.1 HORIZONTAL SEISMIC DEMAND The horizontal response structural amplification factor to be applied for estimating the horizontal in-structure seismic demand is provided in Reference 8, Figure 4-3 and is based upon the height of the electrical cabinet (that the relay is mounted within) above the building foundation.

For the MPS3 high-frequency confirmation, this height was taken as the difference between the lowest floor elevation and the floor elevation of the cabinet anchorage.

The horizontal seismic demand was calculated in accordance with Reference 8, Equation 4-1 a:

SAcH =SAGMRS

  • AF SH SAcH is the Spectral Acceleration, Clipped Horizontal (i.e., in-structure [floor] horizontal acceleration).

SAGMRS is the peak GMRS between 15-40Hz. The SAGMRs value is 0.422g from Reference 4.

The horizontal GMRS is plotted in Figure 3-1.

AFsH is the Horizontal Response Structural Amplification Factor from Reference 8, Figure 4-3.

3.1.2 VERTICAL SEISMIC DEMAND The vertical response structural amplification factor to be applied for estimating the vertical in-structure seismic demand is provided in Reference 8, Figure 4-4 and is based upon the height of the electrical cabinet (that the relay is mounted within) above the building foundation. For the MPS3 high-frequency confirmation, this height was taken as the difference between the lowest floor elevation and the floor elevation of the cabinet anchorage.

The vertical seismic demand was calculated in accordance with Reference 8, Equation 4-1 b:

SAcv = SAvGMRS

  • AF sv SAcv is the Spectral Acceleration, Clipped Vertical (in-structure [floor] vertical acceleration).

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 8 of 54 SAvGMRs is the peak estimated Spectral Acceleration, Vertical GMRS in the 15 to 40Hz range ..

The peak SAvGMRs is the maximum product of the Vertical-to-Horizontal (V/H) function values and the corresponding horizontal GMRS values between 15 and 40Hz. The GMRS values are from Reference 4. The V/H function is derived from Reference 8, Tables 3-1 and 3-2, utilizing the GMRS peak ground acceleration (PGA) (0.190g] and the shear wave travel time from a depth of 30 meters to the ground surface (Vs30) from Reference 4. For MPS3, the V/H function values are between 0.680 @ 15 Hz and 0.860 @ 40Hz, and are based on the GMRS Horizontal PGA = 0.19g and Vs30 > 1, 000 mps corresponding to a site class 'B-Hard' per Reference 8, Table 3-2. The maximum product of the V/H function values and the corresponding GMRS is 0.31g, which occurs at 40Hz (GMRS = 0.36g, V/H = 0.86). The GMRS, estimated vertical GMRS (VGMRS), and the V/H Ratio values are plotted in Figure 3-1, along with the SSE spectrum.

AFsv is the Vertical Response Structural Amplification Factor from Reference 8, Figure 4-4.

3.2 ESTIMATE OF HIGH FREQUENCY MOUNTING POINT SEISMIC DEMAND The mounting point seismic demand was determined by applying in-cabinet amplification factors to the in-structure demand, as described in Reference 8, Sections 4.4 and 4.5.1.

The in-structure demand was determined as described in Section 3.1 above. The in-cabinet amplification factor is applied to account for the amplification of the structure seismic response at the cabinet anchor points. The in-structure demand (horizontal or vertical) was multiplied by the applicable in-cabinet amplification factor to obtain the mounting point demand.

Horizontal cabinet amplification factors used were:

Motor Control Centers AFc =3.6 Switchgear (flexible panels) AFc =7.2 Control Cabinets (e.g., Control Room electrical panels AFc =4.5 and bench boards, etc.)

Cabinet types were determined based on guidance in EPRI NP-7148, "Procedure for Evaluating Nuclear Power Plant Relay Seismic Functionality" (Reference 11).

The vertical cabinet amplification factor used was AFc =4.7 for all three cabinet types.

For electrical cabinets/enclosures that did not correspond to the listed cabinet types, in-cabinet amplification factors consistent with the cabinet configuration were used and justified on a case-by-case basis.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 9 of 54 The mounting point demand , ICRSc, used in the horizontal and vertical directions for evaluation of the relays was the product of the clipped in-structure demand and the applicable cabinet amplification factor within the 15 to 40 Hz frequency range, as described in Reference 8, Sections 4.4:

ICRScH =AFcH

  • SAcH ICRScv =AFcv
  • SAcv The cabinet type classification and the mounting point seismic demand are tabulated for each evaluated relay in Appendix 1.

0.50 Millstone Unit 3 1

- - - GMRS 0.45 - SSE

  • * * * *
  • VG MRS 0.40 - HF Range

- * *V/H

":tl.35 c:

0

~0 . 30 QJ

]0.25 u

111

~0

.... .20 u

QJ

~ . 15 0.10 0.05 0.00 0.1 1 10 100 Spectral frequency, Hz Figure 3-1: Plot of Horizontal and Vertical Ground Motion Response Spectra , Safe Shutdown Earthquake Spectrum, and V/H Ratio

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 10 of 54 4.0 CONTACT DEVICE EVALUATIONS The high-frequency functional confirmation process for the relays subject to the potential for seismic-induced contact chatter requires the comparison of relay seismic capacity to the applicable seismic demand to determine whether the relay is predicted to experience contact chatter during a GMRS-level seismic event. Seismic demand was determined as described in Section 3.0. The deterministic high confidence of low probability of failure (HCLPF) capacity of the relay device was determined in accordance with the guidance of Reference 8, Section 4.5.

4.1 HCLPF Component Capacity The HCLPF capacities of the relays were developed based on the guidance in Reference 8, Section 4.5.2. The effective wide band capacity, TRS, is given by Reference 8, Equation 4-5:

SAT is the Spectral Acceleration, Effective Spectral Test Capacity (Relay Seismic Capacity) for relays as obtained from one of the following sources:

  • EPRI High Frequency Test Program (References 7 and 8)
  • Generic Equipment Ruggedness Spectrum (GERS) (Reference 9 and 10)
  • Seismic Qualification Reporting and Testing Standardization (SQURTS) (Reference 14)
  • Site-specific seismic qualification test data Certain relay model numbers identified on the relay list are not explicitly covered by the testing referenced in the list above and a comparison of the relay to other similar relay types having seismic qualification test data (e.g., same manufacturer & same family of relay, similar size, shape, features, construction, etc.) was made in those cases in order to provide a SAT value.

As an alternative to relay-specific seismic margin evaluations, the adequacy of relay seismic capacity (with respect to the GMRS) for selected relays not covered by EPRI High Frequency Test Program testing, GERS, or SQURTS has been evaluated through an assessment of the original site specific seismic qualification basis for electrical components. The MPS3 seismic licensing basis is IEEE-323 1974 (Reference 15) and IEEE-344 1975 (Reference 16), and safety related relays contained within plant control panels, motor control centers, switchgear, etc., were qualified to the MPS3 SSE per the requirements of IEEE-344 1975 (Reference 16).

Seismic qualification was performed to design specifications which established, based on the SSE, the applicable mounting point seismic demand for each component (panels, motor control centers, switchgear, etc.) based on applicable structure and floor acceleration response spectra.

Subsequent changes to the plant have maintained the original seismic qualification of electrical components through the MPS3 Design Control Program.

Comparing the peak spectral acceleration from the MPS3 SSE (0.459g between 2 and 6 Hz from Reference 4) to the peak spectral acceleration from the GMRS (0.422g at 15 Hz from

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 11of54 Reference 4), the SSE peak exceeds the GMRS peak by approximately 9%. This exceedance would be expected to translate to a higher in-structure response and mounting point seismic demand with respect to the demand estimated for the GMRS (refer to Section 3.0), although the peak would occur at lower spectral frequencies. From the EPRI High Frequency Test Program (References 7 and 8), the capacity of relays (with respect to contact chatter) in the high-frequency range was shown to be equal to or greater than the capacity of the relay in the lower frequency range . It follows, then, that relays qualified to the MPS3 design basis SSE (to higher accelerations at lower frequencies) would be expected to function acceptably at the (lower acceleration, higher frequency) GMRS-level mounting point demand. Based on the relay-specific seismic margin evaluation performed for the majority (approximately 75%) of MPS3 relays (see Appendix 1) that concludes that there is considerable margin to contact chatter, this alternative approach to show margin to contact chatter for a portion of the relays (approximately 25%) is reasonable for MPS3.

FK is the Conservative Deterministic Failure Margin (CFDM) Knockdown Factor and its value depends on the source of the test value chosen to represent test capacity. FK was obtained from Reference 8, Table 4-2.

FMs is the Multi-axis to Single-axis Correction Factor and is equal to either 1.0 or 1.2 depending on the expected seismic response of the relay enclosure cabinet. The value of FMs was chosen consistent with the guidance from Reference 8, Section 4.5.2.

The effective wide band capacity, along with the source for the device capacity, is tabulated for each evaluated relay in Appendix 1.

4.2 SEISMIC MARGIN EVALUATION The seismic margin to the onset of contact chatter was determined by comparing the HCLPF capacity, TRS, to the mounting point seismic demand, ICRSc, to obtain the capacity/demand ratio:

CID= TRS I ICRSc (C/D is determined for horizontal and vertical directions) .

The results of the relay chatter evaluation is tabulated for each evaluated relay in Appendix 1.

Two representative sample relay evaluations are included in Appendix 2.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 12 of 54

5.0 CONCLUSION

S 5.1

SUMMARY

OF RESULTS The high-frequency .confirmation review was performed consistent with the guidance in EPRI Report 3002004396 (Reference 8). The following results were obtained:

  • 229 plant components supporting the key safety functions were selected for detailed review
  • 192 components were selected for relay chatter evaluation (the remaining 37 components are non-electrical, and do not require relay chatter evaluation)
  • 410 relays were identified for the 192 components evaluated for relay chatter
  • 212 relays were identified with the potential to cause SILO conditions and required seismic margin evaluation
  • 212 relays were determined to have adequate seismic margin to chatter (CID ratio >/= 1)

5.2 CONCLUSION

This attachment provides information required by Enclosure 1, Recommendation 2.1: Seismic, Item (4) of the NRC's March 12, 2012 request for information letter (Reference 1).

A high-frequency confirmation review has been performed for MPS3 to determine whether the occurrence of a severe seismic event could cause selected essential equipment to fail to perform as necessary. As a result of the review, it is concluded that accomplishment of the key plant safety functions defined in Reference 8 will not be adversely affected due to relay chatter

  • during a severe seismic event equivalent to the level of the reevaluated seismic hazard for Millstone Power Station Unit 3.

6.0 REFERENCES

1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012.
2. NRC Letter, "Final Determination of Licensee Seismic Probabilistic Risk Assessments Under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)

Regarding Recommendation 2.1 "Seismic" of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated October 27, 2015.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 13 of 54

3. NRC Letter, "Endorsement of Electric Power Research Institute Final Draft Report 3002004396, "High Frequency Program: Application Guidance for Functional Confirmation and Fragility"," dated September 17, 2015.
4. Dominion Nuclear Connecticut, Inc. Letter, "Millstone Power Station Units 2 and 3, Response to March 12, 2012 Information Request - Seismic Hazard and Screening Report (CEUS Sites) for Recommendation 2.1," dated March 31, 2014.
5. EPRI Report 1015109, "Program on Technology Innovation: Seismic Screening of Components Sensitive to High-Frequency Vibratory Motions," October 2007.
6. EPRI Report 1025287, Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic, February 2013.
7. EPRI Report 3002002997, "High Frequency Program: High Frequency Testing Summary,"

September 2014.

8. EPRI Report 3002004396, "High Frequency Program: Application Guidance for Functional Confirmation and Fragility Evaluation," July 2015.
9. EPRI NP-7147-SL, "Seismic Ruggedness of Relays," August 1991.
10. EPRI NP-7147 SQUG Advisory 2004-02, "Relay GERS Corrections," September 10, 2004.
11. EPRI NP-7148, "Procedure for Evaluating Nuclear Power Plant Relay Seismic Functionality," 1990.
12. NRC Letter, "Millstone Power Station, Units 2 and 3 - Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f),

Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (TAC Nos. MF3968 and MF3969),"

dated December 15, 2015.

13. NRC Letter, "Millstone Power Station, Units 2 and 3 - Supplement to Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (CAC Nos. MF3968 and MF3969)," dated March 15, 2016.
14. EPRI Report 1019309, "Seismic Qualification Reporting and Testing Standardization (SQURTS) Test Report Database v2.0," 2009.
15. The Institute of Electrical and Electronics Engineers (IEEE) Standard IEEE-323 1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations
16. IEEE-344 1975, IEEE Recommended Practices for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 14 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 1 3EGS*EGA DIESEL AC/DC 5 Control EMER 24'-6" 3.132 1.936 AGASTAT 7022PE EPRI NP-7147-SLR1, 4.000 Capacity GENERATOR A POWER AND Cabinet GEN GERS-RLY-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand 2 3EGS*EGA DIESEL AC/DC 4A Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand 3 3EGS*EGA DIESEL AC/DC 48 Control EMER 24'-6" 3.132 1.936 GOULD/ ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand 4 3EGS*EGA DIESEL AC/DC 5E Control EMER 24'-6" 3.132 1.936 AGASTAT 7022PE EPRI NP-7147-SLR1, 4.000 Capacity GENERATOR A POWER AND Cabinet GEN GERS-RLY-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand 5 3EGS*EGA DIESEL AC/DC ESCNXK90 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity GENERATOR A POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or SUPPORT (increased by EPRI exceeds SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 6 3EGS*EGA DIESEL AC/DC ESCA/XK91 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity GENERATOR A POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or SUPPORT (increased by EPRI exceeds SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 7 3EGS*EGA DIESEL AC/DC OP1 Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand 8 3EGS*EGA DIESEL AC/DC OP2 Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 15 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 9 3EGS*EGA DIESEL AC/DC OP3 Control EMER 24'-6" 3.132 1.936 GOULD/ ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand 10 3EGS*EGA DIESEL AC/DC OPL1 Control EMER 24'-6" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATOR A POWER AND Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand 11 3EGS*EGA DIESEL AC/DC OPL2 Control EMER 24'-6" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATOR A POWER AND Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand 12 3EGS*EGA DIESEL AC/DC OPL3 Control EMER 24'-6" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATOR A POWER AND Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand 13 3EGS*EGA DIESEL AC/DC SDR Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P2012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand 14 3EGS*EGA DIESEL AC/DC SFR Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand 15 3EGS*EGA DIESEL AC/DC T2A Control EMER 24'-6" 3.132 1.936 AGASTAT 7012PC EPRI NP-7147-SLR1, 8.333 Capacity GENERATOR A POWER AND Cabinet GEN GERS-RLY-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand 16 3EGS*EGA DIESEL AC/DC T2S Control EMER 24'-6" 3.132 1.936 AGASTAT 7012PC EPRI NP-7147-SLR1, 8.333 Capacity GENERATOR A POWER AND Cabinet GEN GERS-RLY-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand 17 3EGS*EGS DIESEL AC/DC 5 Control EMER 24'-6" 3.132 1.936 AGASTAT 7022PE EPRI NP-7147-SLR1, 4.000 Capacity GENERATORS POWER AND Cabinet GEN GERS-RLY-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand 18 3EGS*EGS DIESEL AC/DC 4A Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATORS POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand 19 3EGS*EGS DIESEL AC/DC 4S Control EMER 24'-6" 3.132 1.936 GOULD/ ITE EPRI TR-105988-V2 9.467 Capacity GENERATORS POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 16 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 20 3EGS*EGB DIESEL AC/DC 5E Control EMER 24'-<3" 3.132 1.936 AGASTAT 7022PE EPRI NP-7147-SLR1, 4.000 Capacity GENERATORS POWER AND Cabinet GEN GERS-RLY-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand 21 3EGS*EGB DIESEL AC/DC ESCB/XK90 Control CNTL 47'-<3" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity GENERATOR B POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or SUPPORT (increased by EPRI exceeds SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 22 3EGS*EGB DIESEL AC/DC ESCB/XK91 Control CNTL 47'-<3" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity GENERATORB POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or SUPPORT (increased by EPRI exceeds SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 23 3EGS*EGB DIESEL AC/DC OP1 Control EMER 24'-<3" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR B POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand 24 3EGS*EGB DIESEL AC/DC OP2 Control EMER 24'-<3" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR B POWER AND Cabinet GEN J13P3012 (SQURTS}, Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand 25 3EGS*EGB DIESEL AC/DC OP3 Control EMER 24'-<3" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATORB POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand 26 3EGS*EGB DIESEL AC/DC OPL1 Control EMER 24'-<3" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATORB POWER AND *Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand 27 3EGS*EGB DIESEL AC/DC OPL2 Control EMER 24'-<3" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATOR B POWER AND Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand 28 3EGS*EGB DIESEL AC/DC OPL3 Control EMER 24'-<3" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATOR B POWER AND Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 17 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Cabinet Seismic Capacity Evaluation Equipment Key Safety No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRScH ICRScv Relay Mfg. & Model Source Document TRS Result 29 3EGS*EGB DIESEL AC/DC SDR Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATORS POWER AND Cabinet GEN J13P2012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand 30 3EGS*EGB DIESEL AC/DC SFR Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATORS POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand 31 3EGS*EGB DIESEL AC/DC T2A Control EMER 24'-6" 3.132 1.936 AGASTAT 7012PC EPRI NP-7147-SLR1, 8.333 Capacity GENERATORS POWER AND Cabinet GEN GERS-RLY-PNT. 7 meets or SUPPORT ENCL exceeds SYSTEMS demand 32 3EGS*EGB DIESEL AC/DC T28 Control EMER 24'-6" 3.132 1.936 AGASTAT 7012PC EPRI NP-7147-SLR1, 8.333 Capacity GENERATORS POWER AND Cabinet GEN GERS-RLY-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand 33 3ENS*ACB-10A 4KV EMERGENCY AC/DC ESCNXK39 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34C10-2) BUS 34C (SWGR A) POWER AND (Bypass) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1C SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 34 3ENS*ACB-10A 4KV EMERGENCY AC/DC ESCA/XK43 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34C10-2) BUS 34C (SWGR A) POWER AND (SSS) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1C SYSTEMS TR-105988 demand

[SQURTS], Table 3-1)

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 18 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 35 3ENS*ACB-15B 4KV EMERGENCY AC/DC 3 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity (34D15-2) BUS 34D (SWGR B) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3FWA*P1B SYSTEMS General Electric demand Relays Northeast Utilities Systems -

Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 36 3ENS*ACB-15B 4KV EMERGENCY AC/DC AMSAC(B)/K104 Control CNTL 47'-6" 3.987 2.491 WESTINGHOUSE [1] [1] Capacity (34D15-2) BUS 34D (SWGR B) POWER AND Cabinet BLDG 405A10H01 meets or BREAKER TO SUPPORT exceeds 3FWA*P1B SYSTEMS demand [1]

37 3ENS*ACB-15B 4KV EMERGENCY AC/DC ESCB/XK47 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34D15-2) BUS 34D (SWGR B) POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3FWA*P1B SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 38 3ENS*ACB-15B 4KV EMERGENCY AC/DC PSCA1/K640 Control CNTL 47'-6" 3.987 2.491 POTTER & EPRI NP-7147-SLR1, 6.667 Capacity (34D15-2) BUS 34D (SWGR B) POWER AND Cabinet BLDG BRUMFIELD MDR- GERS-RLY-ARR.3 meets or BREAKER TO SUPPORT 134-1 (NON- exceeds 3FWA*P1B SYSTEMS LATCHING) demand

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 19 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 39 3ENS.ACB-16A 4KV EMERGENCY AC/DC 3 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity (34C16-2) BUS 34C (SWGR A) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3FWNP1A SYSTEMS General Electric demand Relays Northeast Utilities Systems -

Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 40 3ENS.ACB-16A 4KV EMERGENCY AC/DC AMSAC(A)/K104 Control CNTL 47'-6" 3.967 2.491 WESTINGHOUSE [1] [1] Capacity (34C16-2) BUS 34C (SWGR A) POWER AND Cabinet BLDG 405A10H01 meets or BREAKER TO SUPPORT exceeds 3FWNP1A SYSTEMS demand [1]

41 3ENS.ACB-16A 4KV EMERGENCY AC/DC ESCNXK47 Control CNTL 47'-6" 3.967 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34C16-2) BUS 34C (SWGR A) POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3FWNP1A SYSTEMS TR-105966 demand

[SQURTS], Table 3-1) 42 3ENS.ACB-16A 4KV EMERGENCY AC/DC PSCA1/K640 Control CNTL 47'-6" 3.987 2.491 POTTER& EPRI NP-7147-SLR1, 6.667 Capacity (34C16-2) BUS 34C (SWGR A) POWER AND Cabinet BLDG BRUMFIELD MDR- GERS-RLY-ARR.3 meets or BREAKER TO SUPPORT 134-1 (NON- exceeds 3FWNP1A SYSTEMS LATCHING) demand 43 3ENS.ACB-16B 4KV EMERGENCY AC/DC 62 Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity (34D16-2) BUS 34D (SWGR B) POWER AND BLDG E7012PC001 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3SWP*P1B SYSTEMS demand L__ _ _

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 20 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 44 3ENS.ACB-16B 4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC66K1A [1] [1] Capacity (34D16-2) BUS 34D (SWGR B) PDWERAND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1B SYSTEMS demand [1]

45 3ENS*ACB-16B 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21B1A [1] [1] Capacity (34016-2) BUS 34D (SWGR B) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1B SYSTEMS demand [1]

46 3ENS*ACB-16B 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity (34D16-2) BUS 34D (SWGR B) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3SWP*P1B SYSTEMS General Electric demand Relays Northeast Utilities Systems -

Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 47 3ENS*ACB-16B 4KV EMERGENCY AC/DC 86HBED3- Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity (34D16-2} BUS 34D (SWGR B} POWER AND 3ENSB02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3SWP*P1B SYSTEMS demand 48 3ENS*ACB-16B 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity (34D16-2) BUS 34D (SWGR B} POWER AND (3ENSB02} BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1B SYSTEMS demand [1]

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 21 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Cabinet Seismic Capacity Evaluation Item Equipment Key Safety No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 49 3ENS*ACB-16B 4KV EMERGENCY AC/DC ESCB/XK18 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34D16-2) BUS 34D (SWGR B) POWER AND (MSB) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1B SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 50 3ENS*ACB-16B 4KV EMERGENCY AC/DC ESCB/XK34 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34D16-2) BUS 34D (SWGR B) POWER AND (LOP) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1B SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 51 3ENS*ACB-17A 4KV EMERGENCY AC/DC 62 Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity (34C17-2) BUS 34C (SWGR A) POWER AND BLDG E7012PC001 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3SWP*P1A SYSTEMS demand 52 3ENS*ACB-17A 4KV EMERGENCY AC/DC 50/50/51-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC66K1A [1] [1] Capacity (34C17-2) BUS 34C (SWGR A) POWER AND BLDG GE 121FC66D1A meets or BREAKER TO SUPPORT GE 121FC66K1A exceeds 3SWP*P1A SYSTEMS demand [1]

53 3ENS*ACB-17A 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21B1A [1] [1] Capacity (34C17-2) BUS 34C (SWGR A) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1A SYSTEMS demand [1]

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 22 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 54 3ENS*ACB-17A 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity (34C17-2) BUS 34C (SWGR A) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3SWP*P1A SYSTEMS General Electric demand Relays Northeast Utilities Systems -

Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 55 3ENS*ACB-17A 4KV EMERGENCY AC/DC 86HAED3- Switchgear CNTL 4'-B" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity (34C17-2) BUS 34C (SWGR A) POWER AND 3ENSA02 BLDG 12HEA61C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3SWP*P1A SYSTEMS demand 56 3ENS*ACB-17A 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-B" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity (34C17-2) BUS 34C (SWGR A) POWER AND (3ENSA02) BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1A SYSTEMS demand [1]

57 3ENS*ACB-17A 4KV EMERGENCY AC/DC ESCNXK18 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34C17-2) BUS 34C (SWGR A) POWER AND (MSB) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1A SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 58 3ENS*ACB-17A 4KV EMERGENCY AC/DC ESCA/XK34 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34C17-2) BUS 34C (SWGR A) POWER AND (LOP) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1A SYSTEMS TR-105988 demand

[SQURTS], Table 3-1)

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 23 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 59 3ENS*ACB-17B 4KV EMERGENCY AC/DC 62 Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity (34D17-2) BUS 34D (SWGR B) POWER AND BLDG E7012PC001 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3SWP*P1D SYSTEMS demand 60 3ENS*ACB-17B 4KV EMERGENCY AC/DC 50/51-A. B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC66K1A [1] [1] Capacity (34D17-2) BUS 34D (SWGR B) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1D SYSTEMS demand [1]

61 3ENS*ACB-17B 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21 B1A [1] [1] Capacity (34D17-2) BUS 34D (SWGR B} POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1D SYSTEMS demand [1]

62 3ENS*ACB-17B 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity (34D17-2) BUS 34D (SWGR B) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3SWP*P1D SYSTEMS General Electric demand Relays Northeast Utilities Systems -

Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 63 3ENS*ACB-17B 4KV EMERGENCY AC/DC 86HBED3- Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity (34D17-2) BUS 34D (SWGR B) POWER AND 3ENSB02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3SWP*P1D SYSTEMS demand

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 24 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List ~ Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 64 3ENS*ACB-17B 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity (34D17-2) BUS 34D (SWGR B) POWER AND (3ENSB02) BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1D SYSTEMS demand [1]

65 3ENS*ACB-17B 4KV EMERGENCY AC/DC ESCB/XK18 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34D17-2) BUS 34D (SWGR B) POWER AND (MSB) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1D SYSTEMS TR-105988 demand

[SQURTS], Table3-1) 66 3ENS*ACB-17B 4KV EMERGENCY AC/DC ESCB/XK38 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34D17-2) BUS 34D (SWGR B) POWER AND (LOP) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1D SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 67 3ENS*ACB-18A 4KV EMERGENCY AC/DC 62 Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity (34C18-2) BUS 34C (SWGR A) POWER AND BLDG E7012PC001 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3SWP*P1C SYSTEMS demand 68 3ENS*ACB-18A 4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC66K1A [1] [1] Capacity (34C18-2) BUS 34C (SWGR A) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1C SYSTEMS demand [1]

69 3ENS*ACB-18A 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21B1A [1] [1] Capacity (34C18-2) BUS 34C (SWGR A) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1C SYSTEMS demand [1]

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 25 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 70 3ENS.ACB-18A 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4"-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity (34C18-2) BUS 34C (SWGR A} POWER AND BLDG (DC} Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3SWP.P1C SYSTEMS General Electric demand Relays Northeast Utilities Systems -

Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 71 3ENS*ACB-18A 4KV EMERGENCY AC/DC 86HAED3- Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity (34C18-2) BUS 34C (SWGR A} POWER AND 3ENSA02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3swp*p1c SYSTEMS demand 72 3ENS*ACB-18A 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity (34C18-2} BUS 34C (SWGR A} POWER AND (3ENSA02} BLDG meets or BREAKER TO SUPPORT exceeds 3swp*p1c SYSTEMS demand [1]

73 3ENS.ACB-18A 4KV EMERGENCY AC/DC ESCNXK18 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34C18-2} BUS 34C (SWGR A} POWER AND (MSB} Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3swp*p1c SYSTEMS TR-105988 demand

[SQ U RTS], Table 3-1 }

74 3ENS.ACB-18A 4KV EMERGENCY AC/DC ESCNXK38 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34C18-2} BUS 34C (SWGR A} POWER AND (LOP} Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3swp*p1c SYSTEMS TR-105988 demand

[SQURTS], Table 3-1)

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 26 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 75 3ENS*ACB-18B 4KV EMERGENCY AC/DC 1X Switchgear CNTL 4'-6" 3.643 1.452 GE 12HGA111J2G EPRI NP-7147-SLR1, 7.040 Capacity (34D18-2) BUS 34D (SWGR B) POWER AND BLDG GERS-RLY-ARH.5 meets or BREAKER TO SUPPORT exceeds 3Rss*P1B SYSTEMS demand 76 3ENS.ACB-18B 4KV EMERGENCY AC/DC 3-3RHS*P1B Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity (34D18-2) BUS 34D (SWGR B) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3Rss*P1B SYSTEMS General Electric demand Relays Northeast Utilities Systems -

Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 77 3ENS*ACB-18B 4KV EMERGENCY AC/DC 3QSS*LS54B Field ESF 16'-6" 0.886 0.574 STATIC-0-RING, EPRI NP-5223-SLR1, 2.000 Capacity (34D18-2) BUS 34D (SWGR B) POWER AND BLDG. (SWITCH INC. 12N6BB4-U8- GERS-PS.5 meets or BREAKER TO SUPPORT EL.) - 4'-6" C1A-JJTTNQ exceeds 3Rss*P1B SYSTEMS (FLOOR demand EL) 78 3ENS.ACB-18B 4KV EMERGENCY AC/DC 3QSS*LS54D Field ESF 16'-6" 0.886 0.574 STATIC-0-RING, EPRI NP-5223-SLR1, 2.000 Capacity (34D18-2) BUS 34D (SWGR B) POWER AND BLDG. (SWITCH INC. 12N6BB4-U8- GERS-PS.5 meets or BREAKER TO SUPPORT EL) - 4'-6" C1A-JJTTNQ exceeds 3RSS*P1B SYSTEMS (FLOOR demand EL.)

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 27 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment JD Description Function Relay ID(s) Type Bldg Elev ICRS,tt ICRS,v Relay Mfg. & Model Source Document TRS Result 79 3ENS*ACB-18B 4KV EMERGENCY AC/DC 86E1-3RSSB01 Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B22F QTR97P1230, 4.916 Capacity (34D18-2) BUS 34D (SWGR B) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3RSS*P1B SYSTEMS General Electric demand Relays Northeast Utilities Systems -

Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 80 3ENS*ACB-18B 4KV EMERGENCY AC/DC ESCB/XK60 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34D18-2) BUS 34D (SWGR B) POWER AND (SSS) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3RSS*P1B SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 81 3ENS*ACB-19A 4KV EMERGENCY AC/DC 1X Switchgear CNTL 4'-B" 3.643 1.452 GE 12HGA111J2G EPRI NP-7147-SLR1, 7.040 Capacity (34C19-2) BUS 34C (SWGR A) POWER AND BLDG GERS-RLY-ARH.5 meets or BREAKER TO SUPPORT exceeds 3RSS*P1A SYSTEMS demand 82 3ENS*ACB-19A 4KV EMERGENCY AC/DC 3-3RHS*P1A Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity (34C19-2) BUS 34C (SWGR A) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3RSS*P1A SYSTEMS General Electric demand Relays Northeast Utilities Systems -

Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation

  • Page 28 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID . Description Function Relay ID(s) Type Bldg Elev ICRScH ICRScv Relay Mfg. & Model Source Document TRS Result 83 3ENS*ACB-19A 4KV EMERGENCY AC/DC 3Qss*LS54A Field ESF 15'-4" 0.886 0.568 STATIC-0-RING, EPRI NP-5223-SLR1, 2.000 Capacity (34C19-2) BUS 34C (SWGR A) POWER AND BLDG. (SWITCH INC. 12N6BB4-U8- GERS-PS.5 meets or BREAKER TO SUPPORT EL)-4'.Q" C1A-JJTTNQ exceeds 3Rss*P1A SYSTEMS (FLOOR demand EL) 84 3ENS.ACB-19A 4KV EMERGENCY AC/DC 3QSS*LS54C Field ESF 18'-4" 0.886 0.584 STATIC-0-RING, EPRI NP-5223-SLR1, 2.000 Capacity (34C19-2) BUS 34C (SWGR A) POWER AND BLDG. (SWITCH INC. 12N6BB4-U8- GERS-PS.5 meets or BREAKER TO SUPPORT EL)-4'.Q" C1A-JJTTNQ exceeds 3Rss*P1A SYSTEMS (FLOOR demand EL) 85 3ENS*ACB-19A 4KV EMERGENCY AC/DC 86E-3RSSA01 Switchgear CNTL 4'.Q" 3.643 1.452 GE 12HFA154B22F QTR97P1230, 4.916 Capacity (34C19-2) BUS 34C (SWGR A) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3Rss*P1A SYSTEMS General Electric demand Relays Northeast Utilities Systems -

Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 86 3ENS*ACB-19A 4KV EMERGENCY AC/DC ESCA/XK60 Control CNTL 47'.Q" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34C19-2) BUS 34C (SWGR A) POWER AND (SSS) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3Rss*P1A SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 87 3ENS*ACB-19B 4KV EMERGENCY AC/DC 3 Switchgear CNTL 4'.Q" 3.643 1.452 GE 12HFA151A2H EPRI NP-7147-SLR1, 16.385 Capacity (34D19-2) BUS 34D (SWGR B) POWER AND BLDG (DC) GERS-RLY-ARH.5 meets or BREAKER TO SUPPORT exceeds 3RSS'P1D SYSTEMS demand

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 29 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 88 3ENS*ACB-19B 4KV EMERGENCY AC/DC 62A Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity (34D19-2) BUS 34D (SWGR B) POWER AND BLDG E7012PC002 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3RSS*P1D SYSTEMS demand 89 3ENS*ACB-19B 4KV EMERGENCY AC/DC ESCB/XK-62 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34D19-2) BUS 34D (SWGR B) POWER AND (SSS) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3RSS*P1D SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 90 3ENS*ACB-1 B 4KV EMERGENCY AC/DC ESCB/XK46 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34D1-2) BUS 34D (SWGR B) POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3HVK*CHL1B SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 91 3ENS*AC B-20A 4KV EMERGENCY AC/DC 3 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2H EPRI 3002002997 16.385 Capacity (34C20-2) BUS 34C (SWGR A) POWER AND BLDG (DC) meets or BREAKER TO SUPPORT exceeds 3RSS*P1C SYSTEMS demand 92 3ENS*ACB-20A 4KV EMERGENCY AC/DC 62A Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity (34C20-2) BUS 34C (SWGR A) POWER AND BLDG E7012PC002 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3RSS*P1C SYSTEMS demand 93 3ENS*ACB-2DA 4KV EMERGENCY AC/DC ESCA/XK-62 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34C20-2) BUS 34C (SWGR A) POWER AND (SSS) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3RSS*P1C SYSTEMS TR-105988 demand

[SQURTS], Table 3-1)

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 30 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,tt ICRS,v Relay Mfg. & Model Source Document TRS Result 94 3ENS*ACB-20B 4KV EMERGENCY AC/DC ESCB/XK21 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34D20-2) BUS 34D (SWGR B) POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CHS*P3B SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 95 3ENS*ACB-21A 4KV EMERGENCY AC/DC ESCA/XK21 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34C21-2) BUS 34C (SWGR A) POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CHS*P3A SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 96 3ENS*ACB-21 B 4KV EMERGENCY AC/DC ESCB/XK23 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34D21-2) BUS 34D (SWGR B) POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CHS*P3C SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 97 3ENS*ACB-22A 4KV EMERGENCY AC/DC ESCA/XK23 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34C22-2) BUS 34C (SWGR A) POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CHS*P3C SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 98 3ENS*ACB-2A 4KV EMERGENCY AC/DC ESCA/XK46 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34C2-2) BUS 34C (SWGR A) POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3HVK*CHL1A SYSTEMS TR-105988 demand

[SQURTS]. Table 3-1)

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 31 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 99 3ENS*ACB-5B 4KV EMERGENCY AC/DC ESCB/XK-25 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34D5-2) BUS 34D (SWGR B) POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3Qss*P3B SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 100 3ENS*ACB-BA 4KV EMERGENCY AC/DC 3 Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 6.110 Capacity (34C6-2) BUS 34C (SWGR A) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3QSS.P3A SYSTEMS General Electric demand Relays Northeast Utilities Systems -

Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 101 3ENS*ACB-BA 4KV EMERGENCY AC/DC ESCNXK-25 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34C6-2) BUS 34C (SWGR A) POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3QSS.P3A SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 102 3ENS*ACB-BB 4KV EMERGENCY AC/DC ESCB/XK-29 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34D6-2) BUS 34D (SWGR B) POWER AND (SSS) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EP RI exceeds 3RHS.P1B SYSTEMS TR-105988 demand

[SQURTS], Table 3-1)

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 32 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 103 3ENS*ACB-7A 4KV EMERGENCY AC/DC 3 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 6.110 Capacity (34C7-2) BUS 34C (SWGR A) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3RHS*P1A SYSTEMS General Electric demand Relays Northeast Utilities Systems -

Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 104 3ENS*ACB-7A 4KV EMERGENCY AC/DC ESCA/XK-29 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34C7-2) BUS 34C (SWGR A) POWER AND (SSS) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3RHS*P1A SYSTEMS TR-105988 demand ISQURTS], Table 3-1) 105 3ENS*ACB-7B 4KV EMERGENCY AC/DC ESCA/XK27 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (3407-2) BUS 34D (SWGR B) POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SIH*P1B SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 106 3ENS*ACB-8A 4KV EMERGENCY AC/DC ESCA/XK-27 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34C8-2) BUS 34C (SWGR A) POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SIH*P1A SYSTEMS TR-105988 demand

[SQURTS], Table 3-1)

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 33 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 107 3ENS*ACB-8B 4KV EMERGENCY AC/DC ESCB/XK40 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34D8-2) BUS 34D (SWGR B) POWER AND (SSS) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1B SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 108 3ENS*ACB-8B 4KV EMERGENCY AC/DC ESCB/XK42 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34D8-2) BUS 34D (SWGR B) POWER AND (Bypass) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1B SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 109 3ENS*ACB-9A 4KV EMERGENCY AC/DC ESCA/XK40 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34C9-2) BUS 34C (SWGR A) POWER AND (SSS) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1A SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 110 3ENS*ACB-9A 4KV EMERGENCY AC/DC ESCA/XK42 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1. 9.333 Capacity (34C9-2) BUS 34C (SWGR A) POWER AND (Bypass) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1A SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 111 3ENS*ACB-9B 4KV EMERGENCY AC/DC ESCB/XK39 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34D9-2) BUS 34D (SWGR B) POWER AND (Bypass) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1C SYSTEMS TR-105988 demand

[SQURTS], Table 3-1)

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 34 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 112 3ENS.ACB-9B 4KV EMERGENCY AC/DC ESCB/XK43 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity (34D9-2) BUS 34D (SWGR B) POWER AND (SSS) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3ccp*p1c SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 113 3ENS*ACB-AA 4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC53BD1A EPRI NP-7147-SLR1, 6.000 Capacity (34C3-2) BUS 34C (SWGR A) POWER AND BLDG GERS-RLY-PP1.5 meets or BREAKER TO SUPPORT exceeds 3EJs*uS-1A SYSTEMS demand 114 3ENS*ACB-AA 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21B1A [1] [1] Capacity (34C3-2) BUS 34C (SWGR A) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3EJs*us-1A SYSTEMS demand [1]

115 3ENS*ACB-AA 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity (34C3-2) BUS 34C (SWGR A) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3EJs*uS-1A SYSTEMS General Electric demand Relays Northeast Utilities Systems -

Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 116 3ENS*ACB-AA 4KV EMERGENCY AC/DC 86HAED1- Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity (34C3-2) BUS 34C (SWGR A) POWER AND 3ENSA02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3EJs*uS-1A SYSTEMS demand

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 35 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 117 3ENS*ACB-AA 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-B" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity (34C3-2) BUS 34C (SWGR A) POWER AND (3ENSA02) BLDG meets or BREAKER TO SUPPORT exceeds 3EJs*us-1A SYSTEMS demand [1]

118 3ENS*ACB-AC 4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-B" 3.643 1.452 GE 121FC53BD1A EPRI NP-7147-SLR1, 6.000 Capacity (34C5-2) BUS 34C (SWGR A) POWER AND BLDG GERS-RLY-PP1.5 meets or BREAKER TO SUPPORT exceeds 3EJs*uS-3A SYSTEMS demand 119 3ENS.ACB-AC 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFC21B1A [1] [1] Capacity (34C5-2) BUS 34C (SWGR A) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3EJs*us-3A SYSTEMS demand [1]

120 3ENS.ACB-AC 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity (34C5-2) BUS 34C (SWGR A) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3EJs*us-3A SYSTEMS General Electric demand Relays Northeast Utilities Systems -

Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 121 3ENS*ACB-AC 4KV EMERGENCY AC/DC 86HAED1- Switchgear CNTL 4'-B" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity (34C5-2) BUS 34C (SWGR A) POWER AND 3ENSA02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3EJS*US-3A SYSTEMS demand

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 36 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 122 3ENS*ACB-AC 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity (34C5-2) BUS 34C (SWGR A) POWER AND (3ENSA02) BLDG meets or BREAKER TO SUPPORT exceeds 3EJS*US-3A SYSTEMS demand [1]

123 3ENS*ACB-AR 4KV EMERGENCY AC/DC 27A, B, C&D Switchgear CNTL 4'-6" 3.643 1.452 GE 12NGV13B21A [1] [1] Capacity BUS 34C BREAKER POWER AND (3ENSA02) BLDG meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand [1]

POWER 124 3ENS*ACB-AR 4KV EMERGENCY AC/DC 27A,B-3NNSA02 Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 12.000 Capacity BUS 34C BREAKER POWER AND BLDG 12NGV13A11A GERS-RLY-PPM.4 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER 125 3ENS*ACB-AR 4KV EMERGENCY AC/DC 27R (3ENSA18} Control CNTL 47'-6" 3.987 2.491 ITE-27H EPRI NP-7147-SLR1, 10.000 Capacity BUS 34C BREAKER POWER AND Cabinet BLDG GERS-RLY-PPM.4 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER 126 3ENS*ACB-AR 4KV EMERGENCY AC/DC 27RX-3ENSA02 Control CNTL 47'-6" 3.987 2.491 POTTER& EPRI NP-7147-SLR1, 6.667 Capacity BUS 34C BREAKER POWER AND Cabinet BLDG BRUMFIELD MDR- GERS-RlY-ARR.3 meets or CONNECTING TO SUPPORT 137-8 exceeds RESERVE OFFSITE SYSTEMS demand POWER

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 37 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 127 3ENS*ACB-AR 4KV EMERGENCY AC/DC 62V/3NNSA02 Switchgear CNTL 4'-B" 3.643 1.452 AGASTAT 7012PB EPRI NP-7147-SLR1, 10.000 Capacity BUS 34C BREAKER POWER AND BLDG GERS-RLY-PNT.7 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER 128 3ENS*ACB-AR 4KV EMERGENCY AC/DC BB (BG30) Control CNTL 4'-B" 2.277 1.452 NIA [1] [1] Capacity BUS 34C BREAKER POWER AND Cabinet BLDG meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand [1]

POWER 129 3ENS*ACB-BA 4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-B" 3.643 1.452 GE 121FC53BD1A EPRI NP-7147-SLR1, 6.000 Capacity (34D2-2) BUS 34D (SWGR B) POWER AND BLDG GERS-RLY-PP1.5 meets or BREAKER TO SUPPORT exceeds 3EJS*US-1B SYSTEMS demand 130 3ENS*ACB-BA 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFC21B1A [1] [1] Capacity (34D2-2) BUS 34D (SWGR B) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3EJs*us-1B SYSTEMS demand [1]

131 3ENS*ACB-BA 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity (34D2-2) BUS 34D (SWGR B} POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3EJS*US-1B SYSTEMS General Electric demand Relays Northeast Utilities Systems -

Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 38 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 132 3ENS*ACB-BA 4KV EMERGENCY AC/DC 86HBED1- Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity (34D2-2) BUS 34D (SWGR B) POWER AND 3ENSB02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3EJS*US-1B SYSTEMS demand 133 3ENS*ACB-BA 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity (34D2-2) BUS 34D (SWGR B) POWER AND* (3ENSB02) BLDG meets or BREAKER TO SUPPORT exceeds 3EJS*US-1B SYSTEMS demand [1]

134 3ENS*ACB-BC 4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC53BD1A EPRI NP-7147-SLR1, 6.000 Capacity (34D4-2) BUS 34D (SWGR B) POWER AND BLDG GERS-RLY-PP1.5 meets or BREAKER TO SUPPORT exceeds 3EJS*US-3B SYSTEMS demand 135 3ENS*ACB-BC 4KV EMERGENCY AC/DC SOGS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21B1A [1] [1] Capacity (34D4-2) BUS 34D (SWGR B) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3EJS*US-3B SYSTEMS demand [1]

136 3ENS*ACB-BC 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity (34D4-2) BUS 34D (SWGR B) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3EJS*US-3B SYSTEMS General Electric demand Relays Northeast Utilities Systems -

Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 39 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 137 3ENS*ACB-BC 4KV EMERGENCY AC/DC 86HBED1- Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity (34D4-2) BUS 34D (SWGR B) POWER AND 3ENSB02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3EJS*US-3B SYSTEMS demand 138 3ENS*ACB-BC 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity (34D4-2) BUS 34D (SWGR B) POWER AND (3ENSB02) BLDG meets or BREAKER TO SUPPORT exceeds 3EJS*US-3B SYSTEMS demand [1]

139 3ENS*ACB-BR 4KV EMERGENCY AC/DC 27A, B, C&D Switchgear CNTL 4'-6" 3.643 1.452 GE 12NGV13B21A [1] [1] Capacity BUS 34D BREAKER POWER AND

- CONNECTING TO SUPPORT (3ENSB02) BLDG meets or exceeds RESERVE OFFSITE SYSTEMS demand [1]

POWER 140 3ENS*ACB-BR 4KV EMERGENCY AC/DC 27A,B-3NNSB02 Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 12.000 Capacity BUS 34D BREAKER POWER AND BLDG 12NGV13A11A GERS-RLY-PPM.4 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER 141 3ENS.ACB-BR 4KV EMERGENCY AC/DC 27R (3ENSB18) Control CNTL 47'-6" 3.987 2.491 ITE-27H EPRI NP-7147-SLR1, 10.000 Capacity BUS 34D BREAKER POWER AND Cabinet BLDG GERS-RLY-PPM.4 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 40 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 142 3ENS*ACB-BR 4KV EMERGENCY AC/DC 27RX-3ENSB02 Control CNTL 47'-6" 3.987 2.491 POTIER& EPRI NP-7147-SLR1, 6.667 Capacity BUS 34D BREAKER POWER AND Cabinet BLDG BRUMFIELD MOR- GERS-RLY-ARR.3 meets or CONNECTING TO SUPPORT 137-8 exceeds RESERVE OFFSITE SYSTEMS demand POWER 143 3ENS*ACB-BR 4KV EMERGENCY AC/DC 62V/3NNSB02 Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT 7012PB EPRI NP-7147-SLR1, 10.000 Capacity BUS 34D BREAKER POWER AND BLDG GERS-RLY-PNT.7 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER 144 3ENS*ACB-BR 4KV EMERGENCY AC/DC BB (BG3P) Control CNTL 4'-6" 2.277 1.452 N/A [1] [1] Capacity BUS 34D BREAKER POWER AND Cabinet BLDG meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand [1]

POWER 145 3ENS*ACB-G-A 4KV EMERGENCY AC/DC 32 Switchgear CNTL 4'-6" 3.643 1.452 GE 121CW51A2A [1] [1] Capacity BUS 34C BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1]

146 3ENS*ACB-G-A 4KV EMERGENCY AC/DC 40 Switchgear CNTL 4'-6" 3.643 1.452 GE 12CEH51A1A [1] [1] Capacily BUS 34C BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1]

147 3ENS*ACB-G-A 4KV EMERGENCY AC/DC 32X Switchgear CNTL 4'-6" 3.643 1.452 ELECTRO MAX [1] [1] Capacity BUS 34C BREAKER POWER AND BLDG CAT TRIP IND. meets or CONNECTING TO SUPPORT RELAY 6319234 exceeds EDGA SYSTEMS demand [1]

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 41 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 148 3ENS*ACB-G-A 4KV EMERGENCY AC/DC 40X Switchgear CNTL 4'-6" 3.643 1.452 ELECTROMAX [1] [1] Capacity BUS 34C BREAKER POWER AND BLDG CAT TRIP IND. meets or CONNECTING TO SUPPORT RELAY 6319234 exceeds EDGA SYSTEMS demand [1]

149 3ENS.ACB-G-A 4KV EMERGENCY AC/DC 51N Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC51AD1A [1] [1] Capacity BUS 34C BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1]

150 3ENS.ACB-G-A 4KV EMERGENCY AC/DC 51NX-3ENSA07 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2P EPRI 3002002997 5.769 Capacity BUS 34C BREAKER POWER AND BLDG CD42 (DC) meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 151 3ENS.ACB-G-A 4KV EMERGENCY AC/DC 51V-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12JJCV51B21A [1] [1] Capacity BUS 34C BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1]

152 3ENS.ACB-G-A 4KV EMERGENCY AC/DC 51VX Switchgear CNTL 4'-6" 3.643 1.452 GE 12HGA111J2G EPRI NP-7147-SLR1, 7.040 Capacity BUS 34C BREAKER POWER AND BLDG (DC) GERS-RLY-ARH.5 meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 153 3ENS.ACB-G-A 4KV EMERGENCY AC/DC 51X-3ENSA02 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2P EPRI 3002002997 5.769 Capacity BUS 34C BREAKER POWER AND BLDG CD42 (DC) meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 154 3ENS*ACB-G-A 4KV EMERGENCY AC/DC 62M Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34C BREAKER POWER AND BLDG E7012PA002 GERS-RLY-PNT. 7 meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 42 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment JD Description Function Relay ID(s) Type Bldg Elev ICRS,H JCRS,v Relay Mfg. & Model Source Document TRS Result 155 3ENS*ACB-G-A 4KV EMERGENCY AC/DC 81 (3EGSA05) Control EMER 24'-6" 3.132 1.936 GE 12SFF31A1A [1] [1] Capacity BUS 34C BREAKER POWER AND Cabinet GEN meets or CONNECTING TO SUPPORT ENCL exceeds EDGA SYSTEMS demand [1]

156 3ENS*ACB-G-A 4KV EMERGENCY AC/DC 86HAED4- Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C BREAKER POWER AND 3ENSA02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 157 3ENS*ACB-G-A 4KV EMERGENCY AC/DC 86HBU-3ENSA07 Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C BREAKER POWER AND BLDG 12HEA61C239X2 GERS-RLY-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 158 3ENS*ACB-G-A 4KV EMERGENCY AC/DC 86HP Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C BREAKER POWER AND BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 159 3ENS*ACB-G-A 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34C BREAKER POWER AND (3ENSA02) BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1]

160 3ENS*ACB-G-A 4KV EMERGENCY AC/DC 87G-A, B&C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34C BREAKER POWER AND (3ENS*ACB-G-A) BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1]

161 3ENS*ACB-G-A 4KV EMERGENCY AC/DC 87G-A. B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34C BREAKER POWER AND (3ENS*ACB-G-A) BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1]

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 43 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 162 3ENS*ACB-G-A 4KV EMERGENCY AC/DC DGNSDR Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity BUS 34C BREAKER POWER AND Cabinet GEN J13P2012 (SQURTS), Table 3-1 meets or CONNECTING TO SUPPORT ENCL exceeds EDGA SYSTEMS demand 163 3ENS*ACB-G-A 4KV EMERGENCY AC/DC ESCNXK96 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C BREAKER POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or CONNECTING TO SUPPORT (increased by EPRI exceeds EDGA SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 164 3ENS*ACB-G-A 4KV EMERGENCY AC/DC Unit Substation Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC53AD1A [1] [1] Capacity BUS 34C BREAKER POWER AND FDR QC 1A, 2A, BLDG meets or CONNECTING TO SUPPORT 3A, 4A: 51-A, B & exceeds EDGA SYSTEMS c demand [1]

165 3ENS*ACB-G-B 4KV EMERGENCY AC/DC 32 Switchgear CNTL 4'-6" 3.643 1.452 GE 121CW51A2A [1] [1] Capacity BUS 34D BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand [1]

166 3ENS*ACB-G-B 4KV EMERGENCY AC/DC 40 Switchgear CNTL 4'-6" 3.643 1.452 GE 12CEH51A1A (1] [1] Capacity BUS 34D BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDG B SYSTEMS demand [1]

167 3ENS*ACB-G-B 4KV EMERGENCY AC/DC 32X Switchgear CNTL 4'-6" 3.643 1.452 ELECTROMAX [1] [1] Capacity BUS 34D BREAKER POWER AND BLDG CAT TRIP IND. meets or CONNECTING TO SUPPORT RELAY 6319234 exceeds EDG B SYSTEMS demand [1]

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 44 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 168 3ENS.ACB-G-B 4KV EMERGENCY AC/DC 40X Switchgear CNTL 4'-6" 3.643 1.452 ELECTROMAX [1] [1] Capacity BUS 34D BREAKER POWER AND BLDG CAT TRIP IND. meets or CONNECTING TO SUPPORT RELAY 6319234 exceeds EDGB SYSTEMS demand [1]

169 3ENS.ACB-G-B 4KV EMERGENCY AC/DC 51N Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC51AD1A [1] [1] Capacity BUS 34D BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand [1]

170 3ENS.ACB-G-B 4KV EMERGENCY AC/DC 51 NX-3ENSB07 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2P EPRI 3002002997 5.769 Capacity BUS 34D BREAKER POWER AND BLDG CD42 (DC) meets or CONNECTING TO SUPPORT exceeds EDG B SYSTEMS demand 171 3ENS.ACB-G-B 4KV EMERGENCY AC/DC 51V-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121JCV51 B21A [1] [1] Capacity BUS 34D BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand [1]

172 3ENS*ACB-G-B 4KV EMERGENCY AC/DC 51VX Switchgear CNTL 4'-6" 3.643 1.452 GE 12HGA111J2G EPRI NP-7147-SLR1, 7.040 Capacity BUS 34D BREAKER POWER AND BLDG (DC) GERS-RLY-ARH.5 meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand 173 3ENS.ACB-G-B 4KV EMERGENCY AC/DC 51X-3ENSB02 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2P EPRI 3002002997 5.769 Capacity BUS 34D BREAKER POWER AND BLDG CD42 (DC) meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand 174 3ENS.ACB-G-B 4KV EMERGENCY AC/DC 62M Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34D BREAKER POWER AND BLDG E7012PA002 GERS-RLY-PNT.7 meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 45 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function RelaylD(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 175 3ENS"ACB-G-B 4KV EMERGENCY AC/DC 81 (3EGSB05) Control EMER 24'-6" 3.132 1.936 GE 12SFF31A1A [1] [1] Capacity BUS 34D BREAKER POWER AND Cabinet GEN meets or CONNECTING TO SUPPORT ENCL exceeds EDGB SYSTEMS demand [1]

176 3ENS"ACB-G-B 4KV EMERGENCY AC/DC 86HBED4- Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D BREAKER POWER AND 3ENSB02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDG B SYSTEMS demand 177 3ENS"ACB-G-B 4KV EMERGENCY AC/DC 86HBU-3ENSB07 Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D BREAKER POWER AND BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand 178 3ENS"ACB-G-B 4KV EMERGENCY AC/DC 86HP Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D BREAKER POWER AND BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand 179 3ENS"ACB-G-B 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34D BREAKER POWER AND (3ENSB02) BLDG meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand [1]

180 3ENS"ACB-G-B 4KV EMERGENCY AC/DC 87G-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34D BREAKER POWER AND (3ENS"ACB-G-B) BLDG meets or CONNECTING TO SUPPORT exceeds EDG B SYSTEMS demand [1]

181 3ENS"ACB-G-B 4KV EMERGENCY AC/DC 87G-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34D BREAKER POWER AND (3ENS"ACB-G-B) BLDG meets or CONNECTING TO SUPPORT exceeds EDG B SYSTEMS demand [1]

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 46 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Cabinet Seismic Capacity Evaluation Item Equipment Key Safety No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 182 3ENS*ACB-G-B 4KV EMERGENCY AC/DC DGNSDR Control EMER 24'-6" 3.132 1.936 GOULD/ ITE EPRI TR-105988-V2 9.467 Capacity BUS 34D BREAKER POWER AND Cabinet GEN J13P2012 (SQURTS), Table 3-1 meets or CONNECTING TO SUPPORT ENCL exceeds EOG B SYSTEMS demand 183 3ENS*ACB-G-B 4KV EMERGENCY AC/DC ESCB/XK96 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D BREAKER POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or CONNECTING TO SUPPORT (increased by EPRI exceeds EDGB SYSTEMS TR-105988 demand

[SQURTS], Table 3-1) 184 3ENS*ACB-G-B 4KV EMERGENCY AC/DC Unit Substation Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC53AD1A [1] [1] Capacity BUS 34D BREAKER POWER AND FDR QC 1A, 2A, BLDG meets or CONNECTING TO SUPPORT 3A, 4A 51-A, B & exceeds EDGB SYSTEMS c demand [1]

185 3ENS*ACB-GNA 4KV EMERGENCY AC/DC 51NX-3ENSA07 Switchgear CNTL 4'-6" 3.643 1.452 N/A EPRI 3002002997 16.385 Capacity (15G-14U-2N) BUS 34C (SWGR A) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNA SYSTEMS demand 186 3ENS*ACB-GNA 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A (1] [1] Capacity (15G-14U-2N) BUS 34C (SWGR A) POWER AND (3ENSA02) BLDG meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNA SYSTEMS demand [1]

187 3ENS*ACB-GNA 4KV EMERGENCY AC/DC 87G-A, B&C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity (15G-14U-2N) BUS 34C (SWGR A) POWER AND (3ENS*ACB-G-A) BLDG meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNA SYSTEMS demand [1]

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 47 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Cabinet Seismic Capacity Evaluation Item Equipment Key Safety No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 188 3ENS*ACB-GNA 4KV EMERGENCY AC/DC 94EAE-3ENSA02 Switchgear CNTL 4'-6" 3.643 1.452 WESTINGHOUSE EPRI NP-7147-SLR1, 8.000 Capacity (15G-14U-2N) BUS 34C (SWGR A) POWER AND BLDG 774B470A12 GERS-RLY-Al1.4 meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNA SYSTEMS demand 189 3ENS*ACB-GNA 4KV EMERGENCY AC/DC 94G-3ENS*ACB- Switchgear CNTL 4'-6" 3.643 1.452 WESTINGHOUSE EPRI NP-7147-SLR1, 8.000 Capacity (15G-14U-2N) BUS 34C (SWGR A) POWER AND G-A BLDG 774B470A12 GERS-RLY-A11.4 meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNA SYSTEMS demand 190 3ENS*ACB-GNB 4KV EMERGENCY AC/DC 51 NX-3ENSB07 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2P EPRI 3002002997 16.385 Capacity (15G-15U-2N) BUS 34D (SWGR B) POWER AND BLDG CD42 (DC) meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNB SYSTEMS demand 191 3ENS*ACB-GNB 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity (15G-15U-2N) BUS 34D (SWGR B) POWER AND (3ENSB02) BLDG meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNB SYSTEMS demand [1]

192 3ENS*ACB-GNB 4KV EMERGENCY AC/DC 87G-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity (15G-15U-2N) BUS 34D (SWGR B) POWER AND (3ENS.ACB-G-B) BLDG meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNB SYSTEMS demand [1]

193 3ENS*ACB-GNB 4KV EMERGENCY AC/DC 94EBE-3ENSB02 Switchgear CNTL 4'-6" 3.643 1.452 WESTINGHOUSE EPRI NP-7147-SLR1, 8.000 Capacity (15G-15U-2N) BUS 34D (SWGR B) POWER AND BLDG 774B470A12 GERS-RLY-Al1.4 meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNB SYSTEMS demand

Serial No.16-455 . "'

Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 48 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 194 3ENS*ACB-GNB 4KV EMERGENCY AC/DC 94G-3ENS*ACB- Switchgear CNTL 4'-6" 3.643 1.452 WESTINGHOUSE EPRI NP-7147-SLR1, 8.000 Capacity (15G-15U-2N) BUS 34D (SWGR B) POWER AND G-B BLDG 774B470A12 GERS-RLY-Al1.4 meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNB SYSTEMS demand 195 3MSS*MOV17A TDAFWSTEAM CORE 42C MCC ESF 36'-6" 0.886 0.677 [2] EPRI NP-5223-SLR1, 1.200 Capacity (V12) SUPPLY VALVE COOLING BLDG. GERS-MCC.9 meets or FROM S/G A MOV exceeds demand 196 3MSS*MOV17B TDAFWSTEAM CORE 42C MCC ESF 36'-6" 0.886 0.677 [2] EPRI NP-5223-SLR1, 1.200 Capacity (V37) SUPPLY VALVE COOLING BLDG. GERS-MCC.9 meets or FROM S/G B MOV exceeds demand 197 3MSS*MOV17D TDAFWSTEAM CORE 42C MCC ESF 36'-6" 0.886 0.677 [2] EPRI NP-5223-SLR1, 1.200 Capacity (V38) SUPPLY VALVE COOLING BLDG. GERS-MCC.9 meets or FROM S/G D MOV exceeds demand 198 3MSS*MSV5 TURBINE DRIVEN CORE 1CON Control ESF 21'-6" 3.987 2.820 N/A [1] [1] Capacity AUXILIARY COOLING Cabinet BLDG. meets or FEEDWATER PUMP - exceeds TURBINE ISOLATION demand [1]

VALVE (INCLUSIVE OF TURBINE OVERSPEED TRIP SOLENOID 3FWL *sov104 SOV)

L

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 49 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,tt ICRS,v Relay Mfg. & Model Source Document TRS Result 199 3MSS*MSV5 TURBINE DRIVEN CORE 3CR Control ESF 21'-6" 3.987 2.820 GE CR 120B D03041 EPRI NP-7147-SL, 5.667 Capacity AUXILIARY COOLING Cabinet BLDG. GERS-RLY-Al1.4 meets or FEEDWATER PUMP - (increased by EPRI exceeds TURBINE ISOLATION TR-105988-V2 demand VALVE (INCLUSIVE [SQURTS], Table 3-1)

OF TURBINE OVERSPEED TRIP SOLENOID 3FWL*SOV104 SOV) 200 3MSS*MSV5 TURBINE DRIVEN CORE K2 Control ESF 21'-6" 3.987 2.820 NIA [1] [1] Capacity AUXILIARY COOLING Cabinet BLDG. meets or FEEDWATER PUMP - exceeds TURBINE ISOLATION demand [1]

VALVE (INCLUSIVE OF TURBINE OVERSPEED TRIP SOLENOID 3FWL*SOV104 SOV) 201 3MSS*PV20A S/G A MAIN STEAM CORE PSCB/K627 (SU) Control CNTL 47'-6" 3.987 2.491 POTIER& EPRI NP-7147-SL, 9.533 Capacity (V48) PRESSURE COOLING Cabinet BLDG BRUMFIELD MDR- GERS-RLY-ARR.3 meets or RELIEVING VALVE 4076 (LATCHING) (increased by EPRI exceeds TR-105988-V2 demand

[SQURTS], Table 3-1)

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 50 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 202 3MSS*PV20B SIG B MAIN STEAM CORE PSCA/K627 (SLI) Control CNTL 47'-6" 3.987 2.491 POTIER& EPRI NP-7147-SL, 9.533 Capacity (V55} PRESSURE COOLING Cabinet BLDG BRUMFIELD MDR- GERS-RLY-ARR.3 meets or RELIEVING VALVE 4076 (LATCHING} (increased by EPRI exceeds TR-105988-V2 demand

[SQURTS], Table 3-1) 203 3Mss*pv2oc SIG C MAIN STEAM CORE PSCBIK627 (SLI} Control CNTL 47'-6" 3.987 2.491 POTIER& EPRI NP-7147-SL, 9.533 Capacity (V62) PRESSURE COOLING Cabinet BLDG BRUMFIELD MDR- GERS-RLY-ARR.3 meets or RELIEVING VALVE 4076 (LATCHING} (increased by EPRI exceeds TR-105988-V2 demand

[SQURTS], Table 3-1) 204 3MSS*PV20D SIG D MAIN STEAM CORE PSCA/K627 (SLI) Control CNTL 47'-6" 3.987 2.491 POTIER& EPRI NP-7147-SL, 9.533 Capacity (V69) PRESSURE COOLING Cabinet BLDG BRUMFIELD MOR- GERS-RLY-ARR.3 meets or RELIEVING VALVE 4076 (LATCHING) (increased by EPRI exceeds TR-105988-V2 demand

[SQURTS], Table 3-1) 205 3RCS*PCV455A PRESSURE RCS PSCA11K628 Control CNTL 47'-6" 3.987 2.491 POTIER& EPRI NP-7147-SL, 6.667 Capacity (V168) OPERATED RELIEF INVENTORY Cabinet BLDG BRUMFIELD MOR- GERS-RLY-ARR.3 meets or VALVESOV CONTROL 134-1 (NON- exceeds LATCHING) demand 206 3RCS'PCV455A PRESSURE RCS PSCA2/K743 Control CNTL 47'-6" 3.987 2.491 POTIER& EPRI NP-7147-SL, 6.667 Capacity (V168) OPERATED RELIEF INVENTORY Cabinet BLDG BRUMFIELD MOR- GERS-RLY-ARR.3 meets or VALVESOV CONTROL 134-1 (NON- exceeds LATCHING) demand 207 3RCS 0 PCV456 PRESSURE RCS PSCB11K628 Control CNTL 47'-6" 3.987 2.491 POTIER& EPRI NP-7147-SL, 6.667 Capacity (V170) OPERATED RELIEF INVENTORY Cabinet BLDG BRUMFIELD MDR- GERS-RLY-ARR.3 meets or VALVE SOV CONTROL 134-1 (NON- exceeds LATCHING} demand

(_ '

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 51 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Item Equipment Key Safety Cabinet Seismic Capacity Evaluation No. Equipment ID Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 208 3RCS*PCV456 PRESSURE RCS PSCB2/K743 Control CNTL 47'-<l" 3.987 2.491 POTTER& EPRI NP-7147-SL, 6.667 Capacity (V170) OPERATED RELIEF INVENTORY Cabinet BLDG BRUMFIELD MDR- GERS-RLY-ARR.3 meets or VALVESOV CONTROL 134-1 (NON- exceeds LATCHING) demand 209 3VBNINV1 120VAC VITAL AC/DC Static Switch Control CNTL 4'-<l" 0.506 0.309 AMETEK Solidstate (1] [1] Capacity INVERTER INV-1 POWER AND Relays Cabinet BLDG Controls Model 85- meets or SUPPORT VC0250-29 exceeds SYSTEMS demand [1]

210 3VBA*INV2 120VAC VITAL AC/DC Static Switch Control CNTL 4"-13" 0.506 0.309 AMETEK Solidstate [1] [1] Capacity INVERTER INV-2 POWER AND Relays Cabinet BLDG Controls Model 85- meets or SUPPORT VC0250-29 exceeds SYSTEMS demand [1]

211 3VBA*INV3 120VAC VITAL AC/DC Static Switch Control CNTL 4'-<l" 0.506 0.309 AMETEK Solidstate [1] [1] Capacity INVERTER INV-3 POWER AND Relays Cabinet BLDG Controls Model 85- meets or SUPPORT VC0250-29 exceeds SYSTEMS demand [1]

212 3VBNINV4 120VAC VITAL AC/DC Static Switch Control CNTL 4'-<l" 0.506 0.309 AMETEK Solidstate [1] [1] Capacity INVERTER INV-4 POWER AND Relays Cabinet BLDG Controls Model 85- meets or SUPPORT VC0250-29 exceeds SYSTEMS demand [1]

Notes:

1. Acceptable margin to contact chatter is based on the MPS3 design basis seismic qualification of components as described in Section 4.1.
2. GERS capacity data for starter/contactors from EPRI NP-5223-SLR1, GERS-MCC.9 is not model-specific.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 52 of 54 Appendix 2 - Representative Sample Component Evaluations This appendix provides two (2) representative sample component evaluations for relays selected from the list in Appendix 1.

1st Example- Equipment ID 3EGS*EGB [Line Item 20 from Appendix 1]

Description of component:

Equipment ID 3EGS*EGB - EMERGENCY DIESEL GENERATOR EOG "B" - supporting the AC/DC POWER AND SUPPORT SYSTEMS function. Relay from seal-in I lockout circuit analysis - stopping relay 5E. Relay is an AGASTAT Model 7022PE.

Plant Location:

Mounted in panel 3EGS*TBEG1 B EOG "B" Control and Relay Box located in the Emergency Generator Enclosure Building, Elevation 24'6". Cabinet type: Control Cabinet.

Description of Mounting Point Demand Estimate:

Horizontal Response Estimate - Emergency Generator Enclosure Building foundation elevation:

4'6". Panel 3EGS*TBEG1 B is 24'6" - 4'6" = 20 feet above foundation. AFsH = 1.650 (from

Reference 8, Figure 4-3). SAGMRs 0.422g (from Reference 4). Then, SAcH 0.422

  • 1.650 =

0.696g.

Vertical Response Estimate - As described in Section 3.1.2, SAvGMRs = 0.309g. AFsv = 1.333 (from Reference 8, Figure 4-4). Then, SAcv = 0.309

  • 1.333 = 0.412g.

For cabinet type Control Cabinet, AFcH = 4.5 and AFcv = 4.7 (from Reference 8, Section 4.4).

Then, mounting point demand is:

ICRScH =0.696

  • 4.5 =3.132g ICRScv = 0.412
  • 4.7 = 1.936g Description of Relay Capacity The capacity of the relay is based on EPRI GERS - GERS- RLY-PNT. 7 (Reference 9 and 10).

For this relay, GERS capacity for non-operating, normally closed contact is applicable - SAT =

6g.

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 53 of 54 Appendix 2 - Representative Sample Component Evaluations The CDFM knockdown factor, FK, of 1.5 was selected based on the GERS capacity that represented the lowest test level without chatter. The FMs factor value of 1.0 was selected based on the cabinet relay mounting (similar stiffness in three directions).

Then, TRS = (6/1.5)

  • 1.0 = 4g.

Capacity I Demand Ratio:

CI D =TRS / ICRSc

= 4g I 3.132g = 1.277 - Horizontal (governing) - acceptable*

Capacity exceeds demand.

2"d Example - Equipment ID 3RCS*PCV455A (V168) [Line Item 206 from Appendix 1]

Description of component:

Equipment ID 3RCS*PCV455A (V168) - PRESSURIZER PRESSURE OPERATED RELIEF VALVE SOV - supporting the RCS Inventory Control function. Relay from seal-in I lockout circuit analysis - PSCA2/K743. Relay is a POTTER & BRUMFIELD MDR-134-1 (NON-LATCHING).

Plant Location:

Mounted in panel PSCA2 Reactor Protection System Relay Cabinet in the Control Building, Main Control Room, Elevation 47'6". Cabinet type: Control Cabinet.

Description of Mounting Point Demand Estimate:

Horizontal Response Estimate - Control Building foundation elevation: 4' 6". Panel PSCA2 is

47'6" - 4'6" 43 feet above foundation. AFsH 2.1 (from Reference 8, Figure 4-3). SAGMRS =

0.422g (from Reference 4). Then, SAcH 0.422

  • 2.1 0.886g.

Vertical Response Estimate -As described in Section 3.1.2, SAvGMRS = 0.309g. AFsv = 1.717 (from Reference 8, Figure 4-4). Then, SAcv =0.309

  • 1.717 =0.530g.

For cabinet type Control Cabinet, AFcH =4.5 and AFcv =4.7 (from Reference 8, Section 4.4).

Serial No.16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 54 of 54 Appendix 2 - Representative Sample Component Evaluations Then, mounting point demand is:

ICRScH =0.886

  • 4.5 =3.987g ICRScv =0.530
  • 4.7 =2.491g Description of Relay Capacity:

The capacity of the relay is based on EPRI GERS - GERS- RLY-ARR.3 (Reference 9 and 10).

For this relay, GERS capacity for non-operating, normally open contact is applicable - SAT =

10g.

The CDFM knockdown factor, FK, of 1.5 was selected based on the GERS capacity that represented the lowest test level without chatter. The FMs factor value of 1.0 was selected based on the cabinet relay mounting (similar stiffness in three directions).

Then, TRS =(10/1.50)

  • 1.0 =6.667g.

Capacity I Demand Ratio:

CID =TRS I ICRSc

=6.667g I 3.987g =1.672 - Horizontal (governing) - acceptable Capacity exceeds demand.