Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23333A01427 November 2023Attachment F - Groundwater Tek Inc - Peer Review Study Final-1Power Uprate
ML23333A01727 November 2023Attachment I - Chin - the Cooling Canal System at the FPL-Turkey-Point Power Station
ML24012A04216 November 2023FAQ 23-03 Turkey Point IE01 Proposed NRC ResponsePower change
ML23265A55122 September 2023Enclosure 3: WCAP-18830-NP, Turkey Point Fuel Storage Criticality Analysis for 24 Month CyclesAging Management
Fuel cladding
Coast down
Power Uprate
L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)21 August 2023Inservice Inspection Program Owner'S Activity Report (OAR-1)Boric Acid
L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections24 July 2023Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections
L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report30 March 2023Correction to U4R33 Steam Generator Tube Inspection Report
L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications27 March 2023and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or ApplicationsFuel cladding
L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis10 February 2023Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / NisCyber Security
Surveillance Frequency Control Program
Time Critical Operator Action
L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report26 October 2022and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report
L-2020-159, 10 CFR 50.59 Evaluation and Commitment Change Summary Report4 October 202210 CFR 50.59 Evaluation and Commitment Change Summary ReportShutdown Margin
L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)26 August 2022License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)Probabilistic Risk Assessment
Fire Protection Program
L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-00419 August 2022Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Anticipated operational occurrence
Fuel cladding
L-2022-121, Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-0229 July 2022Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02Safe Shutdown
Boric Acid
High winds
Reactor Vessel Water Level
Mission time
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
FLEX
Foreign Material Exclusion
Large early release frequency
Severe Accident Management Guideline
Exemption Request
Earthquake
Maintenance Rule Program
Turbine Missile
Fuel cladding
Scaffolding
NRC 2022-0007, Enclosure 11 - Monitoring Program20 May 2022Enclosure 11 - Monitoring ProgramFire Barrier
Probabilistic Risk Assessment
Large early release frequency
ML22140A14420 May 2022Enclosure 8 - Attributes of the Configuration Risk Management ModelInternal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML22140A14320 May 2022Enclosure 4 - Information Supporting Justification of Excluding Sources of Risk Not Addressed by PRA ModelsSafe Shutdown
High winds
Ultimate heat sink
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Turbine Missile
ML22140A14220 May 2022Enclosure 1 - List of Revised Required Actions to Corresponding PRA Functions and Additional Supporting InformationInternal Flooding
Probabilistic Risk Assessment
ML22140A14120 May 2022Attachment 6 - Point Beach RICT Program Pre-Implementation Items
ML22140A14020 May 2022Attachment 5 - Evaluation of Plant-Specific VariationsSafe Shutdown
Emergency Lighting
Earthquake
Offsite Circuit
ML22140A13920 May 2022Attachment 4 - Cross-Reference of TSTF-505, Revision 2, and Point Beach Proposed Changes
ML22140A13820 May 2022Containment Isolation ValvesSafe Shutdown
Offsite Circuit
ML22140A13620 May 2022Containment Isolation ValvesHigh Radiation Area
Surveillance Frequency Control Program
ML22140A13520 May 2022RPS InstrumentationHigh Radiation Area
Hydrostatic
Surveillance Frequency Control Program
ML22140A13320 May 2022Attachment 1 - Evaluation of the Proposed ChangesProbabilistic Risk Assessment
Large early release frequency
L-2022-038, Emergency Response Data System (Eros) Changes17 May 2022Emergency Response Data System (Eros) Changes
L-2022-073, Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0043 May 2022Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004Anticipated operational occurrence
L-2022-022, Updated Conditions of Certification Report14 February 2022Updated Conditions of Certification ReportEnforcement Discretion
Incorporated by reference
Annual Radiological Environmental Operating Report
SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program30 September 2021Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program
L-2021-182, Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions16 September 2021Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment RevisionsSafe Shutdown
FLEX
ML21214A0432 August 2021SLRA June 30, 2021, Public Meeting Discussion Questions
L-2021-069, Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds)24 June 2021Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds)Boric Acid
Aging Management
License Renewal
Subsequent License Renewal
Unidentified leakage
ML21126A2396 May 2021Subsequent License Renewal Application, Aging Management Supplement 2Boric Acid
Fire Barrier
Coatings
Aging Management
Foreign Material Exclusion
Subsequent License Renewal
Biofouling
Through-Wall Leak
Fire Protection Program
ML21062A14621 April 2021Memo to File: Final Ea/Fonsi of 2012 and 2015 Decommissioning Funding Plans for Seabrook Station Unit 1 Independent Spent Fuel Storage Installation (2012 and 2015)Decommissioning Funding Plan
ML21040A4859 February 2021Fws to NRC, Verification Letter for Point Beach SLR Under Programmatic Biological Opinion for Northern Long-eared Bat
ML21040A4849 February 2021Fws to NRC, Point Beach Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location And/Or May Be Affected by Your Project
NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report21 January 2021Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation ReportFinite Element Analysis
Aging Management
Liquid penetrant
ML21008A01725 October 2020Revised ANS Design Report
IR 05000250/202001123 July 2020NRC Inspection Report 05000250-2020011 and 05000251-2020011 and Investigation Report 2-2019-011; and Apparent Violation FinalSignificance Determination Process
L-2020-073, Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping13 April 2020Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return PipingUltimate heat sink
Non-Destructive Examination
Past operability
Coatings
Nondestructive Examination
Incorporated by reference
Through-Wall Leak
ML20098F3417 April 2020Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional InformationDownpower
NRC 2020-0001, Pressure Temperature Limits Report (PTLR)9 January 2020Pressure Temperature Limits Report (PTLR)Hydrostatic
Pressure and Temperature Limits Report
L-2019-204, Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification25 November 2019Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - NotificationHydrostatic
Moisture barrier
Biofouling
NRC 2019-0026, Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure29 August 2019Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP EnclosureSafe Shutdown Earthquake
Weld Overlay
Nondestructive Examination
VT-2
Finite Element Analysis
Earthquake
Liquid penetrant
Dissimilar Metal Weld
DM weld
L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report6 August 201910 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report
L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds19 March 2019Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic WeldsNondestructive Examination
Dissimilar Metal Weld
L-2019-054, Baffle-Former Bolts Predictive Evaluations13 March 2019Baffle-Former Bolts Predictive EvaluationsFinite Element Analysis
Aging Management
ML19002A16012 March 2019Nrc'S Record of Decision for the License Renewal Application for Seabrook Station, Unit 1 - 1-4-19Incorporated by reference
License Renewal
Environmental Justice
ML19072A1625 March 2019National Park Service, Southeast Regional Office, Comments Dated March 5, 2019, on Turkey Point Nuclear Generating Units 3 and 4 Preliminary Draft SEIS Regarding Subsequent License RenewalUltimate heat sink
NRC 2019-0002, Refueling Outage U2R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations24 January 2019Refueling Outage U2R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations