ML23333A014 | 27 November 2023 | Attachment F - Groundwater Tek Inc - Peer Review Study Final-1 | Power Uprate |
ML23333A017 | 27 November 2023 | Attachment I - Chin - the Cooling Canal System at the FPL-Turkey-Point Power Station | |
ML24012A042 | 16 November 2023 | FAQ 23-03 Turkey Point IE01 Proposed NRC Response | Power change |
ML23265A551 | 22 September 2023 | Enclosure 3: WCAP-18830-NP, Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles | Aging Management Fuel cladding Coast down Power Uprate |
L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1) | 21 August 2023 | Inservice Inspection Program Owner'S Activity Report (OAR-1) | Boric Acid |
L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections | 24 July 2023 | Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections | |
L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report | 30 March 2023 | Correction to U4R33 Steam Generator Tube Inspection Report | |
L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications | 27 March 2023 | and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications | Fuel cladding |
L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis | 10 February 2023 | Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis | Cyber Security Surveillance Frequency Control Program Time Critical Operator Action |
L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | 26 October 2022 | and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | |
L-2020-159, 10 CFR 50.59 Evaluation and Commitment Change Summary Report | 4 October 2022 | 10 CFR 50.59 Evaluation and Commitment Change Summary Report | Shutdown Margin |
L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) | 26 August 2022 | License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) | Probabilistic Risk Assessment Fire Protection Program |
L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 | 19 August 2022 | Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 | Safe Shutdown Boric Acid Shutdown Margin Loop seal Anticipated operational occurrence Fuel cladding |
L-2022-121, Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02 | 29 July 2022 | Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02 | Safe Shutdown Boric Acid High winds Reactor Vessel Water Level Mission time Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Operating Basis Earthquake FLEX Foreign Material Exclusion Large early release frequency Severe Accident Management Guideline Exemption Request Earthquake Maintenance Rule Program Turbine Missile Fuel cladding Scaffolding |
NRC 2022-0007, Enclosure 11 - Monitoring Program | 20 May 2022 | Enclosure 11 - Monitoring Program | Fire Barrier Probabilistic Risk Assessment Large early release frequency |
ML22140A144 | 20 May 2022 | Enclosure 8 - Attributes of the Configuration Risk Management Model | Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML22140A143 | 20 May 2022 | Enclosure 4 - Information Supporting Justification of Excluding Sources of Risk Not Addressed by PRA Models | Safe Shutdown High winds Ultimate heat sink Internal Flooding Hydrostatic Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Turbine Missile |
ML22140A142 | 20 May 2022 | Enclosure 1 - List of Revised Required Actions to Corresponding PRA Functions and Additional Supporting Information | Internal Flooding Probabilistic Risk Assessment |
ML22140A141 | 20 May 2022 | Attachment 6 - Point Beach RICT Program Pre-Implementation Items | |
ML22140A140 | 20 May 2022 | Attachment 5 - Evaluation of Plant-Specific Variations | Safe Shutdown Emergency Lighting Earthquake Offsite Circuit |
ML22140A139 | 20 May 2022 | Attachment 4 - Cross-Reference of TSTF-505, Revision 2, and Point Beach Proposed Changes | |
ML22140A138 | 20 May 2022 | Containment Isolation Valves | Safe Shutdown Offsite Circuit |
ML22140A136 | 20 May 2022 | Containment Isolation Valves | High Radiation Area Surveillance Frequency Control Program |
ML22140A135 | 20 May 2022 | RPS Instrumentation | High Radiation Area Hydrostatic Surveillance Frequency Control Program |
ML22140A133 | 20 May 2022 | Attachment 1 - Evaluation of the Proposed Changes | Probabilistic Risk Assessment Large early release frequency |
L-2022-038, Emergency Response Data System (Eros) Changes | 17 May 2022 | Emergency Response Data System (Eros) Changes | |
L-2022-073, Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 | 3 May 2022 | Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 | Anticipated operational occurrence |
L-2022-022, Updated Conditions of Certification Report | 14 February 2022 | Updated Conditions of Certification Report | Enforcement Discretion Incorporated by reference Annual Radiological Environmental Operating Report |
SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program | 30 September 2021 | Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program | |
L-2021-182, Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions | 16 September 2021 | Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions | Safe Shutdown FLEX |
ML21214A043 | 2 August 2021 | SLRA June 30, 2021, Public Meeting Discussion Questions | |
L-2021-069, Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds) | 24 June 2021 | Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds) | Boric Acid Aging Management License Renewal Subsequent License Renewal Unidentified leakage |
ML21126A239 | 6 May 2021 | Subsequent License Renewal Application, Aging Management Supplement 2 | Boric Acid Fire Barrier Coatings Aging Management Foreign Material Exclusion Subsequent License Renewal Biofouling Through-Wall Leak Fire Protection Program |
ML21062A146 | 21 April 2021 | Memo to File: Final Ea/Fonsi of 2012 and 2015 Decommissioning Funding Plans for Seabrook Station Unit 1 Independent Spent Fuel Storage Installation (2012 and 2015) | Decommissioning Funding Plan |
ML21040A485 | 9 February 2021 | Fws to NRC, Verification Letter for Point Beach SLR Under Programmatic Biological Opinion for Northern Long-eared Bat | |
ML21040A484 | 9 February 2021 | Fws to NRC, Point Beach Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location And/Or May Be Affected by Your Project | |
NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report | 21 January 2021 | Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report | Finite Element Analysis Aging Management Liquid penetrant |
ML21008A017 | 25 October 2020 | Revised ANS Design Report | |
IR 05000250/2020011 | 23 July 2020 | NRC Inspection Report 05000250-2020011 and 05000251-2020011 and Investigation Report 2-2019-011; and Apparent Violation Final | Significance Determination Process |
L-2020-073, Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping | 13 April 2020 | Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping | Ultimate heat sink Non-Destructive Examination Past operability Coatings Nondestructive Examination Incorporated by reference Through-Wall Leak |
ML20098F341 | 7 April 2020 | Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information | Downpower |
NRC 2020-0001, Pressure Temperature Limits Report (PTLR) | 9 January 2020 | Pressure Temperature Limits Report (PTLR) | Hydrostatic Pressure and Temperature Limits Report |
L-2019-204, Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification | 25 November 2019 | Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification | Hydrostatic Moisture barrier Biofouling |
NRC 2019-0026, Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure | 29 August 2019 | Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure | Safe Shutdown Earthquake Weld Overlay Nondestructive Examination VT-2 Finite Element Analysis Earthquake Liquid penetrant Dissimilar Metal Weld DM weld |
L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | 6 August 2019 | 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | |
L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds | 19 March 2019 | Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds | Nondestructive Examination Dissimilar Metal Weld |
L-2019-054, Baffle-Former Bolts Predictive Evaluations | 13 March 2019 | Baffle-Former Bolts Predictive Evaluations | Finite Element Analysis Aging Management |
ML19002A160 | 12 March 2019 | Nrc'S Record of Decision for the License Renewal Application for Seabrook Station, Unit 1 - 1-4-19 | Incorporated by reference License Renewal Environmental Justice |
ML19072A162 | 5 March 2019 | National Park Service, Southeast Regional Office, Comments Dated March 5, 2019, on Turkey Point Nuclear Generating Units 3 and 4 Preliminary Draft SEIS Regarding Subsequent License Renewal | Ultimate heat sink |
NRC 2019-0002, Refueling Outage U2R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations | 24 January 2019 | Refueling Outage U2R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations | |