Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000250/1990035 | 30 October 1990 | Forwards Insp Repts 50-250/90-35 & 50-251/90-35 on 901001-05.No Violations or Deviations Noted.Repts Withheld (Ref 10CFR73.21) | |
ML20062A215 | 11 October 1990 | Advises That 900926 Rev 7 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable for Inclusion in Plan | |
ML20062A209 | 11 October 1990 | Advises That 900926 Rev 27 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable.Plan Withheld (Ref 10CFR73.21) | |
ML20058N204 | 10 August 1990 | Advises That 900725 Rev 23 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable | |
ML20055J243 | 24 July 1990 | Advises That 900711 Rev 22 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable.Plan Withheld (Ref 10CFR73.21) | |
ML20059M946 | 13 June 1990 | Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl | |
ML20055C594 | 16 May 1990 | Advises That 900305 & 0416 Revs 20 & 21 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable | |
ML20055C392 | 26 February 1990 | Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166) | |
ML20248J042 | 29 September 1989 | Forwards Partially Withheld Insp Repts 50-250/89-42 & 50-251/89-42 on 890828-0901 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted | |
ML20248G973 | 20 September 1989 | Forwards Unexecuted Amend 13 to Indemnity Agreement B-69, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu | |
ML20247H819 | 13 September 1989 | Advises That 890823 Rev 22 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable | |
ML20247H641 | 12 September 1989 | Advises That 890816 Revisions to ATWS Mitigation Sys Acceptable W/Requirements of 10CFR50.62(c)(1) | |
ML20247K223 | 11 September 1989 | Forwards Amends 123 & 41 to Licenses DPR-61 & NPF-49, Respectively & Safety Evaluation.Amends Change Tech Specs 4.10.1.D.1.h & 4.4.5.4.a.8 to Allow Insp of Steam Generator Tubes by Insertion of Ultrasonic Test Probe | |
ML20247E337 | 7 September 1989 | Forwards Amends 122,34,143 & 40 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Change Tech Spec Sections 6.10.2.m & 6.10.3 Re Records Retention for Radiological Effluent Monitoring & ODCM | Offsite Dose Calculation Manual Process Control Program |
ML20246Q012 | 31 August 1989 | Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted | |
IR 05000029/1989014 | 31 August 1989 | Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted | |
ML20246J588 | 29 August 1989 | Notifies That plant-specific Review of Vital Area Validation Issue for Plant Terminated.Issue Will Be Resolved on Generic Basis | |
ML20246C394 | 15 August 1989 | Forwards Safeguards Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14.No Violations Noted | |
ML20246C821 | 11 August 1989 | Confirms 890808 Telcon Re Util Participation in NRC Regulatory Impact Survey on 891023 in Berlin,Ct.Schedule & General Discussion Groups Shown in Encl | |
ML20246B090 | 9 August 1989 | Forwards Insp Repts 50-250/89-33 & 50-251/89-33 on 890717-21.No Violations or Deviations Noted | |
ML20248D692 | 4 August 1989 | Advises That Rev 6b to Generating Stations Emergency Plan Transmitted by Util 890710 Form Acceptable & Does Not Decrease Effectiveness of Plan | Nuclear Accident Reporting System |
ML20248C056 | 3 August 1989 | Forwards Sser Accepting 880601,0909 & 890602 Changes to ATWS Mitigation Sys Actuation Circuitry for Plants.Nrc Requested to Be Notified Upon Completion of Human Factors Review | |
ML20245H533 | 2 August 1989 | Advises That 890519 Changes to QA Program Described in CPC-2A Acceptable.Issues Addressed Listed | |
ML20248B749 | 31 July 1989 | Advises That 890711 Rev 5 to Guard Training & Qualification Plan Consistent w/10CFR50.54(p) & Acceptable for Inclusion Into Plan | |
ML20248B757 | 31 July 1989 | Advises That 890711 Rev 6 to Guard Training & Qualification Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable | |
ML20248A132 | 28 July 1989 | Advises That 890711 Rev 21 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable | |
ML20248B648 | 28 July 1989 | Forwards Insp Repts 50-250/89-30 & 50-251/89-30 on 890614- 16.No Violations or Deviations Noted | |
ML20247H689 | 25 July 1989 | Requests Proposed Design Change to Containment Hydrogen Monitoring Sys,W/Schedule for Implementing Change or Justification for Existing Configuration | |
ML20247R914 | 24 July 1989 | Advises That 890711 Rev 17 to Plant Physical Security Plan Consistent w/10CFR50.54(p) & Acceptable for Inclusion Into Plan | |
ML20246J512 | 12 July 1989 | Forwards Safeguards Insp Repts 50-250/89-21 & 50-251/89-21 on 890424-28 & Notice of Violation.Advises That Penalty Unwarranted to Further Emphasize Need for Improvement in Security Program.Notice Withheld (Ref 10CFR2.790 & 73.21) | |
ML20246A295 | 29 June 1989 | Forwards Request for Addl Info Re NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs | |
ML20246L221 | 26 June 1989 | Forwards Amends 118,33,142 & 36 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Revise Tech Specs by Removing Tech Spec Figures 6.2-1 & 6.2-2 Re Organizations Functional Requirements | |
ML20245J330 | 22 June 1989 | Provides Background Info on Regulatory Analysis Supplementing NRC Proposed Backfit,Per 890413 Request.Util Expected to Provide Schedule for Implementation of Required Improvements | Backfit |
ML20245F269 | 16 June 1989 | Forwards SER Accepting Licensee 850612 Response to Generic Ltr 83-28,Item 4.5.3 Re Trip Reliability & on-line Functional Testing of Trip Sys | |
ML20245K088 | 16 June 1989 | Advises That 890327 Rev 16 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable | |
ML20245H149 | 15 June 1989 | Submits Correction/Clarificaton to Util 890508 Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Program on Critical Air Demand Equipment Is in Addition to Investigations Performed | |
ML20245B173 | 15 June 1989 | Ack Receipt of Rev 55 to QA Topical Rept CE-1-A.Program Satisfies Requirements of 10CFR50,App B & Acceptable | |
ML20244C294 | 9 June 1989 | Advises Tht Util 890329 Request for Approval to Use Fuses for Electrical Isolation of non-Class 1E Dc Power Sys Acceptable Provided That Circuit Breaker in Parallel to Two Fuses Locked Open | |
ML20244C509 | 1 June 1989 | Advises That Bunker Ramo Penetration Assemblies Environmentally Qualified to Perform Intended Functions for Plants,Per 890224 Rept & .Concerns Expressed in Re Byron Unit 2 Satisfied | |
ML20248C267 | 31 May 1989 | Forwards Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790(d) & 73.21) | |
ML20247M773 | 26 May 1989 | Forwards Director'S Decision Re Ohio Citizens for Responsible Energy 10CFR2.206 Petition Re 880309 Power Oscillation Event at Lasalle,Unit 2 | |
IR 05000250/1989009 | 24 May 1989 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/89-09 & 50-251/89-09 | |
ML20247H351 | 19 May 1989 | Advises That Licensee Response to Generic Ltr 82-33 Re post-accident Monitoring Instrumentation,Per Rev 3 to Reg Guide 1.97,acceptable,except for Four Items Listed in Technical Evaluation Rept | |
ML20247J780 | 19 May 1989 | Informs of Implementation Schedule for Item 1.b of NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification, Mutually Agreed Upon Between NRC & Westinghouse During 890411 Meeting | |
ML20247C152 | 18 May 1989 | Informs of Implementation Schedule for Item 1.b of NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. Understands That Westinghouse Will Provide Util W/Generic Bounding Analysis Re Seismic Loadings | |
ML20247G524 | 18 May 1989 | Responds to Re Util Position on Dealing W/Dc Grounds After Discussion W/Nrc in 890301 Meeting.Continued Plant Operation Will Be Allowed Only So Long as Applicable Limiting Conditions/Or Action Statements Met | |
ML20247B241 | 17 May 1989 | Comments on Expeditious Actions & Notice of Audit on Generic Ltr 88-17 Re Potential Loss of Dhr.Requests Addl Info Re Training Packages,Administrative Controls for Containment Closure & RCS Level Indications | |
ML20246Q151 | 16 May 1989 | Informs of Implementation Schedule for Item 1.b of NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification, Per 890411 Meeting W/Westinghouse Owners Group.Proposed Schedule for Analysis Must Be Accelerated | |
ML20246P814 | 15 May 1989 | Requests Addl Info Re 881130 Application for Amends to Licenses Per Generic Ltr 87-09.Affirmation Should Be Provided That Procedures,Mgt Directives & Onsite Reviews Limit Use of Spec 3.0.4 Exceptions | |
ML20246L274 | 11 May 1989 | Forwards Anl Draft Rept Re Main Steam Line Breaks in Plants Ice Condenser,Per Util 880613,0907 & 1012 Ltrs & WCAP-10988 & WCAP-10986P,for Review & Comments within 60 Days.W/O Encl |