ML23087A0392 May 2023PSDAR Comment ResolutionDecommissioning Funding Plan
PNP 2023-001, Regulatory Path to Reauthorize Power Operations13 March 2023Regulatory Path to Reauthorize Power OperationsCyber Security
Aging Management
Open Phase Condition
License Renewal
Exemption Request
Maintenance Rule Program
Fire Protection Program
Affidavit
CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L6 October 2021Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L
PNP 2019-001, Request for Deferral of Actions Related to a Beyond-Design-Basis External Seismic Event20 March 2019Request for Deferral of Actions Related to a Beyond-Design-Basis External Seismic EventBoric Acid
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Earthquake
Backfit
ML18354B13317 January 2019Staff Assessment of Flood Focused EvaluationHydrostatic
FLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
PNP 2016-066, Special Report for Inoperability of High Range Noble Gas Monitor20 December 2016Special Report for Inoperability of High Range Noble Gas MonitorOffsite Dose Calculation Manual
PNP 2016-042, Annual Status Notification in Response to Confirmatory Order, EA-14-01316 June 2016Annual Status Notification in Response to Confirmatory Order, EA-14-013Grace period
ML16048A34410 February 2016Annual Fatigue Reporting Form 2015
ML15351A35416 December 2015Attachment 3, Audit Open Item Responses
ML15351A36216 December 2015Attachment 6, System Operating Procedure 23, Plant Heating System, Attachment 14, Actions When Outside Temperatures Are Less than 20 Degrees Fahrenheit.
ML15351A36016 December 2015Attachment 5, Final Integrated Plan
ML15351A35516 December 2015Attachment 4, Interim Staff Evaluation Open Item and Confirmation Item Responses
ML15351A35216 December 2015Attachment 1, Compliance with Order EA-12-049
ML15351A35316 December 2015Attachment 2, Order EA-12-049 Compliance Elements Summary
PNP 2015-066, Submittal of Report on the 8-120B Cask20 August 2015Submittal of Report on the 8-120B Cask
ML15147A61922 May 2015Enclosure 2, Corrected Documentation for Relief Request Number RR 4-18Hydrostatic
Finite Element Analysis
Pressure Boundary Leakage
Dissimilar Metal Weld
ML15147A61822 May 2015Appendix a, Computer File Listing, File No. 1400669.323, Revision 0Hydrostatic
Finite Element Analysis
ML15147A61722 May 2015Enclosure 1, Relief Request Number RR 4-21 Proposed Alternative, in Accordance with 10 CFR 50.55a(z)(2), Hardship Without a Compensating Increase in Level of Quality and SafetyHydrostatic
Finite Element Analysis
Dissimilar Metal Weld
DM weld
Scaffolding
PNP 2015-037, Appendix a, Computer Files Listing, File No. 1200895.306, Revision 122 May 2015Appendix a, Computer Files Listing, File No. 1200895.306, Revision 1Hydrostatic
Finite Element Analysis
Earthquake
Dissimilar Metal Weld
PNP 2014-033, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.31 March 2014Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
PNP 2013-072, Report of Changes, Tests and Experiments and Summary of Commitment Changes14 October 2013Report of Changes, Tests and Experiments and Summary of Commitment ChangesBoric Acid
Offsite Dose Calculation Manual
FLEX
Dissimilar Metal Weld
Seismic Walkdown Report
PNP 2013-063, Unsatisfactory Laboratory Testing Report18 September 2013Unsatisfactory Laboratory Testing ReportFitness for Duty
PNP 2013-046, Updated Palisades Nuclear Plant Reactor Vessel Fluence Evaluation25 June 2013Updated Palisades Nuclear Plant Reactor Vessel Fluence Evaluation
PNP 2013-027, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application10 April 2013National Pollutant Discharge Elimination System (NPDES) Permit Renewal ApplicationBoric Acid
Hydrostatic
Zebra Mussel
PNP 2012-101, Flooding Walkdown Report - Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident27 November 2012Flooding Walkdown Report - Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentUltimate heat sink
Hydrostatic
Fukushima Dai-Ichi
ML12334A09627 November 2012PLP-RPT-12-00141, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 3Safe Shutdown
Unanalyzed Condition
Boric Acid
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Tornado Missile Protection
Earthquake
Scaffolding
ML12334A09727 November 2012PLP-RPT-12-0041, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 3Emergency Lighting
PNP 2012-102, PLP-RPT-12-0041, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 3 of 327 November 2012PLP-RPT-12-0041, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 3 of 3Safe Shutdown
Boric Acid
Time of Discovery
Scaffolding
PNP 2012-094, 2012 Steam Generator Tube Inspection Report1 November 20122012 Steam Generator Tube Inspection ReportNondestructive Examination
PNP 2012-059, 60-Day Reports Per Bulletin 2004-01 and CAL No NRR-07-023 Pressurizer Inspection Results for the 2012 Refueling Outage11 July 201260-Day Reports Per Bulletin 2004-01 and CAL No NRR-07-023 Pressurizer Inspection Results for the 2012 Refueling OutageBoric Acid
Nondestructive Examination
IR 05000255/201101914 February 2012Final Significance Determination of Yellow and White Findings with Assessment Followup and Notice of Violation NRC Inspection Report Nos. 05000255-11-019 and 05000255-11-020 Palisades Nuclear Plant
ML12023A18717 January 2012EA-PSA-SDP-D11-2-11-07, Rev. 2, SDP Assessment of DC Panel D11-2 Fault, Cover Through Appendix aBoric Acid
High winds
Ultimate heat sink
Mission time
Internal Flooding
Operator Manual Action
Significance Determination Process
Job Performance Measure
GOTHIC
Unidentified leakage
ML12023A18817 January 2012EA-PSA-SDP-D11-2-11-07, Rev. 2, SDP Assessment of DC Panel D11-2 Fault, Appendix B Through EndMission time
Temporary Modification
Emergency Lighting
Job Performance Measure
ML12006A0715 January 2012SDP Assessment of DC Panel D-11-2 Fault PalisadesBoric Acid
High winds
Ultimate heat sink
Mission time
Internal Flooding
Operator Manual Action
Emergency Lighting
Significance Determination Process
Job Performance Measure
Unidentified leakage
ML11342051219 December 2011Review of the 2010 Steam Generator Tube Inspections During Refueling Outage 21
ML12006A07217 October 2011Plant Trip During D-11-2 Maintenance Root CauseBoric Acid
Fitness for Duty
Temporary Modification
Arc flash
Condition Adverse to Quality
Missed surveillance
Fatigue Rule
ML11287057014 October 2011Report of Changes, Tests and Experiments and Summary of Commitment ChangesGOTHIC
ML12006A06728 September 2011SDP Assessment of Service Water Pump P-7C Coupling Failures Part 3Mission time
Internal Flooding
Past operability
Probabilistic Risk Assessment
Finite Element Analysis
Condition Adverse to Quality
Significance Determination Process
Earthquake
ML1031603379 November 2010Unsatisfactory Laboratory Testing ReportFitness for Duty
ML1012704395 May 2010Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants
ML10203016428 April 2010E-Mail. from Dotson to Cassidy, GZA 2007 Report
ML09295052522 October 2009Generator Tube Inspection ReportNondestructive Examination
ML09289033615 October 2009Report of Facility Changes, Tests and Experiments and Summary of Commitment ChangesGOTHIC
ML09014028716 July 2008E-mail from Ellegood to M. Chawla Et Al. Palisades SFP Racks with Attachment: Report on Resolution of Outstanding Concerns on Spent Fuel Pit Rack Localized Swelling Palisades Nuclear Plant
ML0810000798 April 2008Request for Enforcement Discretion - Technical Specification 3.8.1 Required Actions F.1 and F.2Safe Shutdown
Mission time
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Qualified Offsite Circuit
Emergency Lighting
Seismically rugged
Large early release frequency
Offsite Circuit
Continuous fire watch
Fire Watch
Loctite
ML07178021619 June 2007Revised Steam Generator Tube Integrity Assessment from the 2006 Refueling OutageNondestructive Examination
ML07194009115 September 2006Request for Relief from ASME Section Xl Code Requirements for Repair of Pressurizer Nozzle Penetrations (Non-Proprietary)Boric Acid
Nondestructive Examination
VT-2
Code Reconciliation
Liquid penetrant
ML06198033820 July 2006Review of the 2004 Steam Generator Tube Inspection Reports
ML06173011121 June 2006Day Report Per First Revised Order EA-03-009
ML06082035120 March 2006License Amendment Request: Removal of TSP from Palisades ContainmentBoric Acid
Probabilistic Risk Assessment
Coatings