Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217A98130 October 1999Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites
ML20202F61016 July 1998Discusses Green Package Containing,In Part Corp Auditing Rept Numbers 739459-97,dtd 971015,redacted , 739459-1-97,dtd 971201,redacted & 739459-2-98, ,redacted
ML20202F63416 April 1998Forwards Info from Very Vocal Alleger Caller Re RI-97-A-0145 Ltr.Allegation Disposition Record EnclHigh Radiation Area
Non-Destructive Examination
Grab sample
Enforcement Discretion
Condition Adverse to Quality
Job Performance Measure
Foreign Material Exclusion
Operability Determination
ML20202F66819 March 1998Dicusses Vocal Alleger Who Called Re OI Investigation on Union Guy.Nrc Conducted Insp & Need to Document Results in Insp Rept.Alleger Claims That Investigation Causing Hardships for Union Guy
ML20202F67518 March 1998Forwards Reply to RI-98-A-0007,RI-97-A-0145 & RI-97-A-0282 Re Plant
ML20202F69218 March 1998Requests to Be Informed If Review of Util Audit Will Be in Insp Rept
ML20202F7192 March 1998Forwards Drafts to Be Used Before Replacing Originals Re SSES A-145 Colta
ML20202G41018 February 1998Informs Alleger Caller That Info Requested Will Be Incorporated Into Next Insp Rept & Should Be Received by mid-March
ML20202G4875 February 1998Requests Status of Updating Ltr of Alleger Caller
ML20202G5015 February 1998Requests Status of Updating Ltr Re Alleger CallerFitness for Duty
ML20202G62916 January 1998Responds to 980115 Telcon with G Jones & M Urban Re Current Status of PP&L Internal Investigation
ML20202G59011 January 1998Forwards Info Re Diagnostic Plant Control Operator (Pco) Interest in Radiological Waste Control Room Panel Test Computer Point
ML20202G6089 January 1998Forwards Info Re Diagnostic Interest in Radiological Waste Control Room Panel Test Computer Point
ML20202G6415 January 1998Informs That D Vito & C Anderson Will Be Sending Status Ltr to Alleger Caller
ML20202G67311 December 1997Responds to Telcon with G Jones Discussing Delay in Completing Corporate Audit Re Allegation
ML20202H1625 December 1997Partially Deleted Ltr Re Conversation with One of Two Allegers,Informing That Status Ltr Being Work on & Should Be Received by End of Month
ML20202G71220 November 1997Informs That on 971105 NRC Attended Meeting with PP&L Mgt Representative from PP&L Corporate Auditing to Discuss Set of Four Related Issues Involving Operator Performance & Equipment Panel Testing
ML20202G80919 September 1997Forwards Status Rept on 970919 Allegations 97-A-0049 & 97-A-0145
ML20202G82921 August 1997Informs That Alleger Called in Reference to Topics Contained in RI-97-A-145Enforcement Discretion
ML20202G85730 July 1997Responds to Monthly Allegation Status Meeting
ML20202H19417 July 1997Partially Deleted Ltr Re Followup Calls on 970624
ML20202H07325 June 1997Forwards Current PP&L Corporate Auditing Investigation Re Several Ongoing Investigations at SSES Site
ML20202H24525 June 1997Partially Deleted Ltr Re Summary of Info Provided by Allegers
ML20202H07820 June 1997Informs That Fewell Spoke to Two Individuals & Conversation Being Documented & Placed on an Allegation Receipt FormFire Watch
ML20148F72030 May 1997Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action ProgramsSafe Shutdown
Fire Barrier
Exemption Request
Fire Protection Program
ML20136A68125 November 1996Partially Withheld Memo Re Director Decision 96-18 Re Petition Filed by P Blanch on 940413
ML20129K2565 November 1996Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness
ML20059M66015 November 1993Forwards Revised Task Action Plan for Evaluation of Loss of SFP Cooling Events & Estimate of Staff Resources Required to Complete Action Plan TasksUltimate heat sink
ML20058P50215 August 1990Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program
ML20127B5193 July 1990Clarifies Region I Ofc View of Allegation RI-89-A-0072, Adjustment of Molded Case Circuit Breakers (MCCB) at SusquehannaSafe Shutdown
Backfit
Locktite
ML20055C35226 February 1990Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility
ML20248E93929 September 1989Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed
ML20248C83120 September 1989Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action
ML20247H9269 September 1989Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016Systematic Assessment of Licensee Performance
ML20245E8507 August 1989Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate
ML20245H6454 August 1989Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR
ML20248D14327 July 1989Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants
ML20247B75419 July 1989Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete
ML20247E67217 July 1989Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List
ML20246K59912 July 1989Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl
ML20246L68010 July 1989Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization
ML20247A9566 July 1989Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS
ML20246D88419 June 1989Staff Requirements Memo Re 890601 Briefing on Operating Reactors & Fuel Facilities in Rockville,Md.Commission Expressed Disappointment in Long Term Operating Performance of Turkey Point Nuclear Power Plant
ML20246H37712 May 1989ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512
ML20246P96010 May 1989Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl
NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13532 May 1989Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353High Radiation Area
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Design basis earthquake
Earthquake
Control of Heavy Loads
Chernobyl
Turbine Missile
Fuel cladding
Backfit
Fatality
ML20245E97817 April 1989Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178)
ML20245B75015 April 1989Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart
ML20245B61915 April 1989Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both
ML20245B65315 April 1989Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys