ML20217A8646 October 1999Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990829-0903Unanalyzed Condition
Boric Acid
Shutdown Margin
ML20211H44427 August 1999Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues
ML20138K0096 May 1997Forwards NRC Approved Operator Licensing Exam (as-given Operating Exam) for Tests Administered on 970324-28Boric Acid
Shutdown Margin
High Radiation Area
Stroke time
Safe Shutdown Earthquake
Operating Basis Earthquake
Job Performance Measure
Earthquake
Fire Watch
Downpower
ML20138K0136 May 1997Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 970324-28Boric Acid
Shutdown Margin
High Radiation Area
Safe Shutdown Earthquake
Operating Basis Earthquake
Job Performance Measure
Earthquake
Fire Watch
Power change
Downpower
ML20137F23524 March 1997Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer PlantsProbabilistic Risk Assessment
ML20137C92020 March 1997Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated EnforcementUnanalyzed Condition
ML20135E7163 March 1997Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961118-22Boric Acid
Shutdown Margin
High Radiation Area
Job Performance Measure
ML20134P22320 February 1997Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122
ML20134M24714 February 1997Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13
ML20236U93920 December 1995Discusses Oi,Region IV Rept of Investigation,Dtd 940511, Case 5-93-023R,which Reported OI Investigative Efforts Re Alleged Employee Discrimination at Plant Units 1,2 & 3.Rept Was Sent to Us Attorney Office in Phoenix,Az in May 1994
IA-96-341, Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr3 August 1994Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr
ML20138F9873 August 1994Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by
ML20056E51412 August 1993Submits SALP Schedule for FY94 Per Mgt Directive 8.6
ML20198E32720 October 1992Notification of Significant Licensee Meeting W/Util on 921027 to Discuss Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Programs within Security DeptFire Watch
ML20126L84414 September 1992Provides Status Rept Concerning Actions Re Det Performed at Plant
ML20127C2462 March 1992Forwards AEOD SALP Input for Facilities in Support of Ongoing SALP Reviews.Two of Six Important Operating Events Involved Deficiencies of Reactor Power Cutback Sys Which Relies on Proper Functioning of Steam Bypass to CondenserSafe Shutdown
Emergency Lighting
IA-92-218, Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility31 December 1990Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at FacilitySystematic Assessment of Licensee Performance
ML20127B62831 December 1990Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at FacilitySystematic Assessment of Licensee Performance
ML20127B56712 December 1990Forwards NRR Input for SALP Rept,Per NRC Ofc Ltr 907,Rev 1 ,NRC Manual Chapter 0516 & 901120 MemoEmergency Lighting
Systematic Assessment of Licensee Performance
Scaffolding
ML20059M20427 September 1990Notification of Significant Licensee Meeting W/Util on 901003 to Discuss Licensee Response to Diagnostic Evaluation Team Findings & Overall Status of Programs. Addl NRC Attendees Should Be Made Known by 901002
ML20059L65320 September 1990Notification of 900921 Meeting W/Util in Walnut Creek,Ca to Discuss Licensee Initiatives & Status in Area of QA
ML20059D63627 August 1990Notification of 900831 Enforcement Conference W/Util in Walnut Creek,Ca to Discuss Medical Qualifications & Exams of Licensed Operators
ML20127B45724 August 1990Comments on Response to Facility Diagnostic Evaluation Team Rept.Suggests That Region V Followup & Closely Monitor Development & Implementation of Specific Tasks Which Will Address Team Findings
ML20058M3446 August 1990Forwards List of Open Items in Sims for Plant.Documented Basis Exists for Closure of TMI Related Items at Plant
ML20126L82714 June 1990Provides Summary of Schedule & Status of Items Re Det of Plant Performed by Aeod,In Response to 900314 MemoSystematic Assessment of Licensee Performance
ML20055C35226 February 1990Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility
ML20127B21718 January 1990Forwards AEOD Input for Commissioner Curtiss Visit to Plant on 900201,consisting of Summary of Operating Experience from Oct 1988 to Dec 1989Systematic Assessment of Licensee Performance
ML20127B1689 November 1989Forwards NRR Input to SALP for Facilities.Category 2 Rating Assigned in Functional Areas of Plant Operations, Radiological Controls,Emergency Preparedness,Security & Safety Assessment/Quality VerificationSystematic Assessment of Licensee Performance
ML20248E93929 September 1989Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed
ML20248C83120 September 1989Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action
ML20247H9269 September 1989Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016Systematic Assessment of Licensee Performance
ML20246N73729 August 1989Notification of Maint Team Insp Meeting on 890901 W/Util in Phoenix,Az to Discuss Status of Licensee Commitments from 890605 Mgt Meeting in Consideration of Unit 3 Restart
ML20245E8507 August 1989Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate
ML20127B1407 August 1989Forwards for Info & Consideration for Info Notice,Lers Describing Potter & Brumfield Relay Problems & Atmospheric Dump Valve Deficiencies.Info Provided as Part of AEOD Function to Identify Potential Adverse EventsSafe Shutdown
ML20245H6454 August 1989Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR
ML20248D14327 July 1989Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants
ML20247B75419 July 1989Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete
ML20247E67217 July 1989Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List
ML20246K59912 July 1989Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl
ML20246L68010 July 1989Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization
ML20247A9566 July 1989Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS
ML20246D88419 June 1989Staff Requirements Memo Re 890601 Briefing on Operating Reactors & Fuel Facilities in Rockville,Md.Commission Expressed Disappointment in Long Term Operating Performance of Turkey Point Nuclear Power Plant
ML20246H37712 May 1989ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512
ML20246P96010 May 1989Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl
NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13532 May 1989Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353High Radiation Area
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Design basis earthquake
Earthquake
Control of Heavy Loads
Chernobyl
Turbine Missile
Fuel cladding
Backfit
Fatality
ML20245E97817 April 1989Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178)
ML20245B75015 April 1989Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart
ML20245B65315 April 1989Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys
ML20245B64215 April 1989Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart
ML20245B61915 April 1989Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both