CP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 1 | 31 January 2024 | License Renewal Application Revision 0 - Supplement 3, Revision 1 | |
ML24023A024 | 24 January 2024 | Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology | |
CP-202300494, License Renewal Application Revision 0, Supplement 3 | 6 December 2023 | License Renewal Application Revision 0, Supplement 3 | Boric Acid Finite Element Analysis Aging Management License Renewal |
CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation | 20 November 2023 | License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation | Shutdown Margin Probabilistic Risk Assessment |
CP-202300293, (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days | 14 September 2023 | (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days | Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Job Performance Measure Surveillance Frequency Control Program Large early release frequency Earthquake Maintenance Rule Program Fuel cladding Offsite Circuit Fire Protection Program |
L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 12 September 2023 | Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | |
CP-202300165, License Renewal Application Revision 0 - Supplement 2 | 24 April 2023 | License Renewal Application Revision 0 - Supplement 2 | Boric Acid Fire Barrier Safe Shutdown Earthquake Hydrostatic Coatings Finite Element Analysis Aging Management Moisture barrier License Renewal Subsequent License Renewal Earthquake EVT-1 Through-Wall Leak Through Wall Leak Fire Protection Program Dissimilar Metal Weld Stretch Power Uprate |
CP-202300096, License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements | 20 April 2023 | License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements | Safe Shutdown Operator Manual Action Surveillance Frequency Control Program |
CP-202300140, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-001 | 19 April 2023 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-001 | Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment Fukushima Dai-Ichi Large early release frequency |
CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 14 April 2023 | ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | Safe Shutdown Probabilistic Risk Assessment Cyber Security Decommissioning Funding Plan Large early release frequency Safeguards Contingency Plan License Renewal Fire Protection Program |
CP-202300135, License Renewal Application Revision 0 - Supplement 1 | 6 April 2023 | License Renewal Application Revision 0 - Supplement 1 | Safe Shutdown Boric Acid Fire Barrier Coatings Aging Management Foreign Material Exclusion Moisture barrier License Renewal Subsequent License Renewal Fire Protection Program Flow Induced Vibration |
CP-202200380, (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications | 21 November 2022 | (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications | Boric Acid Shutdown Margin Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report Surveillance Frequency Control Program Fuel cladding Power change |
CP-202200355, Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002 | 21 November 2022 | Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002 | Reactor Vessel Water Level Loop seal Stroke time Anticipated operational occurrence Hydrostatic Coatings Pressure and Temperature Limits Report Surveillance Frequency Control Program Fuel cladding |
CP-202200350, Facility Operating License Numbers NPF-87 and NPF-89 - License Renewal Application - Appendix E, Environmental Report | 3 October 2022 | Facility Operating License Numbers NPF-87 and NPF-89 - License Renewal Application - Appendix E, Environmental Report | |
ML22192A007 | 22 August 2022 | Issuance of Amendment Nos. 183 and 183 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 | Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Flooding Focused Evaluation Maintenance Rule Program Offsite Circuit |
CP-202200273, Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative | 20 July 2022 | Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative | Surveillance Frequency Control Program |
CP-202200006, (CPNPP) - Second Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended. | 17 February 2022 | (CPNPP) - Second Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended. | Safe Shutdown High winds High Radiation Area Ultimate heat sink Fire Barrier Slow transfer Anticipated operational occurrence Tornado Missile Internal Flooding Probabilistic Risk Assessment Fire impairment FLEX Fukushima Dai-Ichi Thermoset Surveillance Frequency Control Program Open Phase Condition Large early release frequency Frazil ice Earthquake Maintenance Rule Program Power Operated Valves Turbine Missile Fuel cladding Offsite Circuit Fire Protection Program Power change |
CP-202200075, Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | 15 February 2022 | Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | |
CP-202100575, (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | 31 August 2021 | (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | Post Accident Monitoring Nondestructive Examination Pressure and Temperature Limits Report |
CP-202100251, (CPNPP) - Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | 27 July 2021 | (CPNPP) - Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | Post Accident Monitoring Nondestructive Examination Pressure and Temperature Limits Report |
CP-202100394, Supplement to License Amendment Request (LAR) 20-006 | 13 July 2021 | Supplement to License Amendment Request (LAR) 20-006 | High winds Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Fuel cladding Offsite Circuit |
CP-202100065, Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 11 May 2021 | Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds High Radiation Area Ultimate heat sink Fire Barrier Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Frazil ice Earthquake Power Operated Valves Turbine Missile Offsite Circuit Fire Protection Program Power change |
CP-202000585, (CPNPP) - Supplement to License Amendment Request (LAR) 20-005, Revision to Technical Specification (TS) 3.6.8, Containment Sump | 27 January 2021 | (CPNPP) - Supplement to License Amendment Request (LAR) 20-005, Revision to Technical Specification (TS) 3.6.8, Containment Sump | Coatings Surveillance Frequency Control Program Fuel cladding |
CP-202000584, (CPNPP) - Supplement to License Amendment Request (LAR) 15-001, Revision to Technical Specification (TS) 3.8.l, AC SOURCES-OPERATING | 9 December 2020 | (CPNPP) - Supplement to License Amendment Request (LAR) 15-001, Revision to Technical Specification (TS) 3.8.l, AC SOURCES-OPERATING | |
CP-202000575, (CPNPP) - Exigent License Amendment Request (LAR) 20-007 Revision to Technical Specification (TS) 3.7.8, Station Service Water System and TS 3.8.1, AC Sources - Operating | 19 November 2020 | (CPNPP) - Exigent License Amendment Request (LAR) 20-007 Revision to Technical Specification (TS) 3.7.8, Station Service Water System and TS 3.8.1, AC Sources - Operating | Safe Shutdown High winds Ultimate heat sink Mission time Slow transfer Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Fire impairment FLEX Surveillance Frequency Control Program Large early release frequency Earthquake Offsite Circuit Fire Protection Program Fire Watch |
CP-202000365, Luminant, Comamche Leak Nuclear Power Plant, License Amendment Request 20-005, New Technical Specification 3.6.8, Containment Sump | 31 August 2020 | Luminant, Comamche Leak Nuclear Power Plant, License Amendment Request 20-005, New Technical Specification 3.6.8, Containment Sump | Ultimate heat sink Coatings Surveillance Frequency Control Program Fuel cladding |
CP-202000401, (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water | 28 July 2020 | (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water | Safe Shutdown Earthquake Surveillance Frequency Control Program Fire Watch |
CP-202000388, (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water | 16 July 2020 | (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water | Mission time Internal Flooding Fire impairment FLEX Fire Watch |
CP-202000321, (CPNPP) - License Amendment Request (LAR) 20-001 Technical Specification (TS) 1.1, Definitions - ESP & RTS Response Time | 2 July 2020 | (CPNPP) - License Amendment Request (LAR) 20-001 Technical Specification (TS) 1.1, Definitions - ESP & RTS Response Time | Shutdown Margin Pressure Boundary Leakage |
CP-202000305, (CPNPP) - Exigent License Amendment Request (LAR) 20-002 Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water | 24 June 2020 | (CPNPP) - Exigent License Amendment Request (LAR) 20-002 Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water | Safe Shutdown High winds Ultimate heat sink Mission time Fire Barrier Slow transfer Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Fire impairment VT-2 FLEX Surveillance Frequency Control Program Large early release frequency Earthquake Pandemic COVID-19 Fire Protection Program Fire Watch |
TXX-2002, Exigent License Amendment Request (LAR) 20-003 Revision to Technical Specification (TS) 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator Program | 10 April 2020 | Exigent License Amendment Request (LAR) 20-003 Revision to Technical Specification (TS) 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator Program | Non-Destructive Examination Grab sample Anticipated operational occurrence Nondestructive Examination Surveillance Frequency Control Program Pandemic COVID-19 |
CP-201900368, Revision to Technical Specifications 3.8.1, AC Sources - Operating | 31 March 2020 | Revision to Technical Specifications 3.8.1, AC Sources - Operating | Safe Shutdown Slow transfer Anticipated operational occurrence Condition Adverse to Quality Surveillance Frequency Control Program Offsite Circuit |
CP-202000016, Editorial Correction to License Amendment Request (LAR) 19-002 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. | 16 January 2020 | Editorial Correction to License Amendment Request (LAR) 19-002 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. | Surveillance Frequency Control Program |
CP-201900393, License Amendment Request (LAR) 19-001, Application to Adopt TSTF-513-A, Revision 3, PWR Operability Requirements and Actions for RCS Leakage Instrumentation | 7 November 2019 | License Amendment Request (LAR) 19-001, Application to Adopt TSTF-513-A, Revision 3, PWR Operability Requirements and Actions for RCS Leakage Instrumentation | Grab sample Surveillance Frequency Control Program Earthquake Pressure Boundary Leakage Power change |
CP-201900415, License Amendment Request (LAR) 19-002, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | 7 November 2019 | License Amendment Request (LAR) 19-002, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | Surveillance Frequency Control Program |
CP-201800115, License Amendment Request 17-001 Revision to Technical Specification 3.3.2. ESFAS Instrumentation | 29 March 2018 | License Amendment Request 17-001 Revision to Technical Specification 3.3.2. ESFAS Instrumentation | Anticipated operational occurrence |
ML17074A494 | 13 April 2017 | Issuance of Amendment Nos. 168 and 168 Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing | Incorporated by reference Missed surveillance Surveillance Frequency Control Program |
ML16351A200 | 14 December 2016 | Submittal of License Amendment Request 16-003, Administrative Change to License Name | Safe Shutdown Cyber Security Fire Protection Program |
CP-201600216, License Amendment Request 16-001, Application to Revise Technical Specifications to Adopt TSF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing. | 27 April 2016 | License Amendment Request 16-001, Application to Revise Technical Specifications to Adopt TSF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing. | Incorporated by reference Surveillance Frequency Control Program |
CP-201501062, ISFSI - Application for Order Approving Transfer of Licenses and Conforming License Amendments | 12 November 2015 | ISFSI - Application for Order Approving Transfer of Licenses and Conforming License Amendments | Safe Shutdown Cyber Security Fire Protection Program |
CP-201400165, (CPNPP) - Redacted Version of License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule | 4 February 2014 | (CPNPP) - Redacted Version of License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule | Safe Shutdown Cyber Security Fuel cladding Fire Protection Program |
CP-201301322, License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule | 21 November 2013 | License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule | Safe Shutdown Cyber Security Fire Protection Program |
CP-201301065, Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process | 29 August 2013 | Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process | Non-Destructive Examination Post Accident Monitoring Nondestructive Examination Pressure and Temperature Limits Report Surveillance Frequency Control Program |
CP-201300738, License Amendment Request 13-002, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item.. | 10 July 2013 | License Amendment Request 13-002, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item.. | Non-Destructive Examination Post Accident Monitoring Nondestructive Examination Pressure and Temperature Limits Report Surveillance Frequency Control Program |
CP-201300257, License Amendment Request (LAR) 13-01, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage, 4.3, Fuel Storage, and 5.5 Programs & Manuals. | 28 March 2013 | License Amendment Request (LAR) 13-01, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage, 4.3, Fuel Storage, and 5.5 Programs & Manuals. | Unanalyzed Condition Safe Shutdown Earthquake Cyber Security Incorporated by reference Surveillance Frequency Control Program |
CP-201300083, License Amendment Request 12-06, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage and 5.5 Programs and Manuals. | 15 January 2013 | License Amendment Request 12-06, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage and 5.5 Programs and Manuals. | Safe Shutdown Earthquake Surveillance Frequency Control Program |
CP-201200518, License Amendment Request (LAR) 12-004, Revision to Technical Specification 3.8.1, Ac Sources - Operating, for Two, 14-Day Completion Times for Offsite Circuits | 2 October 2012 | License Amendment Request (LAR) 12-004, Revision to Technical Specification 3.8.1, Ac Sources - Operating, for Two, 14-Day Completion Times for Offsite Circuits | Hot Short Safe Shutdown High winds Mission time Fire Barrier Anticipated operational occurrence Time to boil Internal Flooding Probabilistic Risk Assessment Emergency Lighting Large early release frequency Earthquake Maintenance Rule Program Offsite Circuit Hourly Fire Watch |
CP-201200552, License Amendment Request (LAR) 2012-001, Revision to Technical Specification 5.7, High Radiation Area and Technical Specifications Table 3.3.3-1 | 12 July 2012 | License Amendment Request (LAR) 2012-001, Revision to Technical Specification 5.7, High Radiation Area and Technical Specifications Table 3.3.3-1 | Reactor Vessel Water Level High Radiation Area Post Accident Monitoring |
CP-201200012, (Cpnpp), Revision to Technical Specification (TS) 5.5.9, Unit 1 D76 and Unit 2 D5 Steam Generator (SG) Program, and TS 5.6.9, Unit 1 D76 and Unit 2 D5 Steam Generator Tube Inspection Report, for a Permanent .... | 28 March 2012 | (Cpnpp), Revision to Technical Specification (TS) 5.5.9, Unit 1 D76 and Unit 2 D5 Steam Generator (SG) Program, and TS 5.6.9, Unit 1 D76 and Unit 2 D5 Steam Generator Tube Inspection Report, for a Permanent .... | Post Accident Monitoring Nondestructive Examination Pressure and Temperature Limits Report |
CP-201101038, License Amendment Request (LAR) 11-001, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled | 1 August 2011 | License Amendment Request (LAR) 11-001, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Grab sample Stroke time Post Accident Monitoring Internal Flooding Hydrostatic Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Battery sizing Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage |