Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24036A265 | 5 February 2024 | Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 | |
IR 05000266/2023004 | 1 February 2024 | Integrated Inspection Report 05000266/2023004 and 05000301/2023004 | |
ML24030A035 | 30 January 2024 | Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection | |
L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements | 26 January 2024 | Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements | |
L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | 25 January 2024 | Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | |
ML24005A324 | 24 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | |
ML23352A275 | 23 January 2024 | Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program | |
L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update | 15 December 2023 | Quality Assurance Topical Report (FPL-1) Revision 30 Update | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination Safeguards Contingency Plan License Renewal Maintenance Rule Program Fire Protection Program Grace period Power Uprate |
L-2023-174, Subsequent License Renewal Application - Third Annual Update | 13 December 2023 | Subsequent License Renewal Application - Third Annual Update | Boric Acid Fire Barrier Coatings Aging Management License Renewal Subsequent License Renewal |
L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | 29 November 2023 | Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | Time of Discovery Contraband Exemption Request |
L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654 | 28 November 2023 | Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, | Health Physics Network High Radiation Area Offsite Dose Calculation Manual Met Tower Incorporated by reference FLEX Severe Accident Management Guideline Earthquake Deep Dose Equivalent Minimum staff Fire Protection Program Grace period Overexposure |
L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule | 16 November 2023 | Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule | Exemption Request |
IR 05000266/2023402 | 14 November 2023 | Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402 | |
ML23279A067 | 9 November 2023 | Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval | VT-2 |
IR 05000266/2023003 | 16 October 2023 | Integrated Inspection Report 05000266/2023003 and 05000301/2023003 | Functionality Assessment FLEX Operability Determination Fire Protection Program |
ML23346A132 | 6 October 2023 | Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published | Pandemic COVID-19 Siren |
L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program | 19 September 2023 | License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program | Incorporated by reference |
ML23243A910 | 6 September 2023 | Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | Exemption Request |
IR 05000266/2023501 | 29 August 2023 | Emergency Preparedness Biennial Exercise Inspection Report 05000266/2023501 and 05000301/2023501 | Siren |
ML23208A095 | 28 August 2023 | Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach | Boric Acid High winds Mission time Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Coatings Temporary Modification Finite Element Analysis FLEX Large early release frequency Exemption Request Earthquake Maintenance Rule Program Turbine Missile Fuel cladding |
ML23208A226 | 28 August 2023 | Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026) - Letter | |
IR 05000266/2023005 | 24 August 2023 | Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) | |
ML23160A064 | 21 August 2023 | Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring System | Shutdown Margin Probabilistic Risk Assessment Surveillance Frequency Control Program Fuel cladding |
L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update | 17 August 2023 | Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update | |
ML23221A052 | 9 August 2023 | Confirmation of Initial License Examination, March 2024 | |
L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | 7 August 2023 | and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | Health Physics Network Cyber Security FLEX B.5.b Severe Accident Management Guideline Minimum staff Siren |
ML23201A087 | 3 August 2023 | Audit Plan in Support of Review of License Amendment | FLEX |
L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections | 24 July 2023 | Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections | |
IR 05000266/2023002 | 18 July 2023 | Integrated Inspection Report 05000266/2023002 and 05000301/2023002 | Boric Acid Internal Flooding Past operability Functionality Assessment Operability Determination License Renewal Maintenance Rule Program Fire Protection Program |
IR 05000266/2023401 | 13 July 2023 | Public-Point Beach Nuclear Plant-Security Baseline Inspection Report 05000266/2023401; 05000301/2023401; Independent Spent Fuel Storage Security Inspection Report 07200005/2023401 | Affidavit |
ML23191A050 | 5 July 2023 | Notification of Use of Radioactive Materials Design Package USA/9168/B(U)-96 | |
L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) | 29 June 2023 | Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) | |
ML23178A242 | 28 June 2023 | Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III | |
L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval | 27 June 2023 | 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval | |
ML23171B106 | 21 June 2023 | Info Meeting with a Question and Answer Session to Discuss NRC 2022 EOC Plant Performance Assessment of Ptbh, Units 1 and 2 | |
ML23163A242 | 13 June 2023 | Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 | Boric Acid Non-Destructive Examination Aging Management Foreign Material Exclusion Scaffolding |
L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 | 9 June 2023 | Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 | Boric Acid Non-Destructive Examination Weld Overlay Probabilistic Risk Assessment Coatings Functionality Assessment Condition Adverse to Quality Aging Management Exemption Request Liquid penetrant Pressure Boundary Leakage Through Wall Leak Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld DM weld Grace period |
ML23103A133 | 1 June 2023 | Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds High Radiation Area Hydrostatic Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Flooding Focused Evaluation Maintenance Rule Program Fuel cladding Offsite Circuit |
L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response | 1 June 2023 | Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response | Aging Management |
L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal | 22 May 2023 | NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination Safeguards Contingency Plan License Renewal Maintenance Rule Program Fire Protection Program Grace period Power Uprate |
ML23118A176 | 4 May 2023 | Audit Summary for License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue 191 | Coatings Exemption Request |
IR 05000266/2023001 | 1 May 2023 | Integrated Inspection Report 05000266/2023001 and 05000301/2023001 | Boric Acid Internal Flooding Nondestructive Examination Temporary Modification Nuclear Accident Reporting System Functionality Assessment FLEX Significance Determination Process Foreign Material Exclusion Operability Determination Liquid penetrant Fire Protection Program Power change Operability Assessment |
ML23114A122 | 25 April 2023 | Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection | |
L-2023-058, 2022 Annual Monitoring Report | 10 April 2023 | 2022 Annual Monitoring Report | Boric Acid Grab sample Offsite Dose Calculation Manual Hydrostatic Met Tower Process Control Program Chernobyl |
L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update | 28 March 2023 | Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update | Decommissioning Funding Plan Authorized possession limits |