Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report5 February 2024Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release ReportAnnual Radioactive Effluent Release Report
RA-24-0045, Cycle 29, Revision 0, Core Operating Limits Report (COLR)1 February 2024Cycle 29, Revision 0, Core Operating Limits Report (COLR)
RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)10 January 2024Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)
RA-24-0015, Submittal of 2023 Sea Turtle Annual Report10 January 2024Submittal of 2023 Sea Turtle Annual Report
RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX8 January 2024Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEXPacking leak
Offsite Dose Calculation Manual
Operating Basis Earthquake
Exemption Request
Earthquake
Pressure Boundary Leakage
Grace period
Unidentified leakage
Operational leakage
RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval4 January 2024Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval
RA-24-0006, 10 CFR 50.54(q) Evaluation4 January 202410 CFR 50.54(q) Evaluation
RA23-072, Regulatory Commitment Change Summary Report15 December 2023Regulatory Commitment Change Summary Report
RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation14 December 2023Baffle-Former Bolt (Bfb) Subsequent Inspection Interval EvaluationFinite Element Analysis
Aging Management
Stress corrosion cracking
Affidavit
RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency14 December 2023Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency
RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.12 December 2023Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.Exemption Request
Pressure Boundary Leakage
Grace period
Unidentified leakage
Operational leakage
RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation4 December 2023Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationExemption Request
RA-23-0314, AP1000 Combined License Application Departure Report Update17 November 2023AP1000 Combined License Application Departure Report UpdateExemption Request
RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency16 November 2023Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test FrequencySafe Shutdown
Mission time
Offsite Dose Calculation Manual
Coatings
Incorporated by reference
Aging Management
Local Leak Rate Testing
Moisture barrier
Recently irradiated fuel
Scaffolding
RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation16 November 2023RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Fitness for Duty
Contraband
Condition Adverse to Quality
Safeguards Contingency Plan
Preemption Authority
Exemption Request
RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report16 November 2023End of Cycle 27 (C1 R27) Steam Generator Tube Inspection ReportNondestructive Examination
Flow Accelerated Corrosion
RA-23-0304, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0)14 November 2023Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0)Boric Acid
Shutdown Margin
RA-23-0276, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific6 November 2023Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical SpecificSafe Shutdown
Surveillance Frequency Control Program
RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2 November 2023Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear PowerSafe Shutdown
High winds
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Qualified Offsite Circuit
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Large early release frequency
Flooding Focused Evaluation
Earthquake
Commercial Grade
Maintenance Rule Program
Pandemic
Turbine Missile
COVID-19
Offsite Circuit
Seismic Walkdown Report
RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes1 November 2023Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of ChangesExemption Request
Siren
RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)12 October 2023Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)Subsequent License Renewal
RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area5 October 2023License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation AreaHigh Radiation Area
Fuel cladding
RA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan29 September 2023Transmittal of Sixth 10-Year Inservice Testing Interval Program PlanSafe Shutdown
Boric Acid
Stroke time
Incorporated by reference
Missed surveillance
Local Leak Rate Testing
Large early release frequency
Operability Determination
Cold shutdown justification
Power Operated Valves
Scaffolding
Grace period
Exclusive Use
Subsequent actuation
Manual Operator Action
RA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)28 September 2023Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)
RA-23-0230, Refuel 27 (C1 R27) Inservice Inspection (ISI) Report25 September 2023Refuel 27 (C1 R27) Inservice Inspection (ISI) Report
RA-23-0243, SR-370-2023-001 for McGuire Nuclear Station25 September 2023SR-370-2023-001 for McGuire Nuclear Station
RA-23-0218, Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals21 September 2023Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel InternalsSafe Shutdown
Unanalyzed Condition
Non-Destructive Examination
Nondestructive Examination
Functionality Assessment
Aging Management
Stress corrosion cracking
Eddy Current Testing
License Renewal
Subsequent License Renewal
EVT-1
Power change
Power Uprate
Measurement Uncertainty Recapture
Thermal fatigue
RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes20 September 2023Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of ChangesMet Tower
Exemption Request
RA-23-0228, Registration for Use of General License Spent Fuel Cask Number 17514 September 2023Registration for Use of General License Spent Fuel Cask Number 175
RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology30 August 2023License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break MethodologySafe Shutdown Earthquake
Stress corrosion cracking
License Renewal
Fuel cladding
Pressure Boundary Leakage
Pressure boundary leak
Unidentified leakage
Affidavit
Operational leakage
RA-23-0215, Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks28 August 2023Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks
RA-23-0223, Registration for Use of General License Spent Fuel Cask Numbers 173 and 17423 August 2023Registration for Use of General License Spent Fuel Cask Numbers 173 and 174
RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 123 August 2023On-Shift Staffing Analysis (Ossa), Revision 1Safe Shutdown
Severe Accident Management Guideline
Fire Protection Program
RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks22 August 2023Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks
RA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner18 August 2023Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic LinerCoatings
Through-Wall Leak
Through Wall Leak
RA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .17 August 2023License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .Safe Shutdown
High winds
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Fukushima Dai-Ichi
Earthquake
Seismic Walkdown Report
RA-23-0211, Reply to a Notice of Violation (NOV) 05000270/2023010-0217 August 2023Reply to a Notice of Violation (NOV) 05000270/2023010-02Condition Adverse to Quality
Significance Determination Process
RA23-057, Registration of Use of Cask to Store Spent Fuel11 August 2023Registration of Use of Cask to Store Spent Fuel
RA23-055, Registration of Use of Cask to Store Spent Fuel11 August 2023Registration of Use of Cask to Store Spent Fuel
RA23-052, Registration of Use of Cask to Store Spent Fuel4 August 2023Registration of Use of Cask to Store Spent Fuel
RA-23-0150, End of Cycle 28 (M2R28) Inservice Inspection Summary Report27 July 2023End of Cycle 28 (M2R28) Inservice Inspection Summary ReportBoric Acid
VT-2
Moisture barrier
RA23-051, Registration of Use of Cask to Store Spent Fuel21 July 2023Registration of Use of Cask to Store Spent Fuel
RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)20 July 2023Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Non-Destructive Examination
Weld Overlay
Finite Element Analysis
RA-23-0195, Notice of Intentions Regarding Apparent Violation Response; (EA-23-060)20 July 2023Notice of Intentions Regarding Apparent Violation Response; (EA-23-060)
RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)20 July 2023Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)Non-Destructive Examination
RA-23-0186, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3)18 July 2023Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3)Boric Acid
Shutdown Margin
RA23-048, Registration of Use of Cask to Store Spent Fuel14 July 2023Registration of Use of Cask to Store Spent Fuel
RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule12 July 2023Revision to Reactor Vessel Surveillance Capsule Withdrawal ScheduleLicense Renewal
Subsequent License Renewal
RA-23-0184, Registration for Use of General License Spent Fuel Cask Numbers 171 and 17210 July 2023Registration for Use of General License Spent Fuel Cask Numbers 171 and 172
RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require7 July 2023Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance RequireIncorporated by reference
Surveillance Frequency Control Program
Operational leakage