RA-23-0314, AP1000 Combined License Application Departure Report Update
ML23324A145 | |
Person / Time | |
---|---|
Site: | 05200022, 05200023 |
Issue date: | 11/17/2023 |
From: | Nolan M Duke Energy Progress |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
RA-23-0314 | |
Download: ML23324A145 (2) | |
Text
e/'_,DUKE
,eiENERGY. New Nuclear Generation Strategy& Regulatoty Engagement 132251-!agers FElrry Rd., MG011E Hunter&vHle, NC 28078 (704) 382~7426 Chris.Nolan@duke-enenw.cpm Serial: RA-23-0314 November 17, 2023 10 CFR 52, Appendix D, X.B U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SHEARON HARRIS NUCLEAR POWER PLANT, UNITS 2 AND 3 DOCKET NOS. 52*022 AND 52-023
SUBJECT:
AP1000 Combined License Application Departure Report Update
REFERENCE:
- 1. Letter from J. Scarola (Duke Energy) to U.S. Nuclear Regulatory Commission {NRC), dated February 18, 2008, "Application for Combined License for Shearon Harris Nuclear Power Plant Units 2 and 3,°
{ADAMS Accession No. ML080580078).
- 2. Letter from Jim Wells (Duke Energy) to NRC, dated May 3, 2023, "AP1000 Combined License Application (COLA) Departure Report Update and 10 CFR 50.46 Annual Update," (ADAMS Accession No. ML23123A194).
Duke Energy Progress, Inc. {DEP) submitted an application, dated February 18, 2008, for a combined license {COL} for two AP1000 advanced pressurized water reactors to be located at the Shearon Harris Nuclear Power Plant Site (Reference 1). Part 7 of the application is entitled "Departures and Exemption Requests." This letter provides an update to the report describing plant-specific departures from the AP1000 Design Control Document (i.e., Departures Report}
as required by 10 CFR 52, Appendix D, paragraphs X.B.1 and X.B.3.b.
There have been no new departures or changes to the departures described in the Shearon Harris Nuclear Power Plant, Units 2 and 3, COLA Part 7, *Departures and Exemption Requests" for the period of May 3, 2023 to November 17, 2023 (Reference 2).
This submittal contains no new regulatory commitments.
Please address any comments or questions regarding this matter to Lee Grzeck, Licensing Manager- New Nuclear Generation at (980) 373-1530.
M. Christopher Nolan Vice-.President, New Nuclear Generation Strategy and Regulatory Engagement
U.S. Nuclear Regulatory Commission RA-23-0314 Page2 cc: L.Dudes, U.S. NRC Region II Administrator D. Murray, U.S. NRC Project Manager