L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | 25 January 2024 | Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | |
L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1) | 18 January 2024 | Inservice Inspection Program Owner'S Activity Report (OAR-1) | |
L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | 11 January 2024 | NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | Stretch Power Uprate |
L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update | 15 December 2023 | Quality Assurance Topical Report (FPL-1) Revision 30 Update | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination Safeguards Contingency Plan License Renewal Maintenance Rule Program Fire Protection Program Grace period Power Uprate |
L-2023-180, Submittal of Changes to the Technical Specification Bases | 13 December 2023 | Submittal of Changes to the Technical Specification Bases | Surveillance Frequency Control Program |
L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report | 6 December 2023 | Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule | 29 November 2023 | Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule | Time of Discovery Contraband Exemption Request |
L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | 29 November 2023 | Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | Exemption Request |
L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654 | 28 November 2023 | Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, | Health Physics Network High Radiation Area Offsite Dose Calculation Manual Met Tower Incorporated by reference FLEX Severe Accident Management Guideline Earthquake Deep Dose Equivalent Minimum staff Fire Protection Program Grace period Overexposure |
L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule | 16 November 2023 | Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule | Contraband Exemption Request |
L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | 16 November 2023 | Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | Contraband Exemption Request |
L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles | 15 November 2023 | License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Loop seal High Radiation Area Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Post Accident Monitoring Coatings Surveillance Frequency Control Program Operability Determination Exemption Request Subsequent License Renewal Earthquake Fuel cladding Recently irradiated fuel Offsite Circuit Grace period GOTHIC Unidentified leakage Accident Tolerant Fuel Power Uprate Affidavit |
L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis | 11 October 2023 | License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis | Surveillance Frequency Control Program Power Uprate |
L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | 25 August 2023 | Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | Hydrostatic Probabilistic Risk Assessment Large early release frequency Time Critical Operator Action Fire Protection Program Coast down Exclusive Use Affidavit |
L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1) | 21 August 2023 | Inservice Inspection Program Owner'S Activity Report (OAR-1) | Boric Acid |
L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update | 17 August 2023 | Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update | |
L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | 7 August 2023 | and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | Health Physics Network Cyber Security FLEX B.5.b Severe Accident Management Guideline Minimum staff Siren |
L-2023-104, Preparation and Scheduling of Operator Licensing Examinations | 3 August 2023 | Preparation and Scheduling of Operator Licensing Examinations | |
L-2023-103, Inservice Inspection Examination Report | 3 August 2023 | Inservice Inspection Examination Report | Moisture barrier |
L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | 27 July 2023 | Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | Internal Flooding Hydrostatic Probabilistic Risk Assessment Large early release frequency Earthquake Fire Protection Program |
L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) | 29 June 2023 | Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) | |
L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. | 28 June 2023 | Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. | |
L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update | 2 June 2023 | Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update | Decommissioning Funding Plan Authorized possession limits |
L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | 31 May 2023 | Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | Mission time Internal Flooding Hydrostatic Probabilistic Risk Assessment Large early release frequency Continuous fire watch Fire Protection Program |
L-2023-072, Preparation and Scheduling of Operator Licensing Examinations | 22 May 2023 | Preparation and Scheduling of Operator Licensing Examinations | |
L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal | 22 May 2023 | NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination Safeguards Contingency Plan License Renewal Maintenance Rule Program Fire Protection Program Grace period Power Uprate |
L-2023-061, 2022 Annual Radiological Environmental Operating Report | 12 May 2023 | 2022 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves | 11 May 2023 | License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves | |
L-2023-062, Cycle 33 Core Operating Limits Report | 27 April 2023 | Cycle 33 Core Operating Limits Report | Shutdown Margin |
L-2023-060, Radiological Emergency Plan, Revision 75 | 26 April 2023 | Radiological Emergency Plan, Revision 75 | |
L-2023-054, Submittal of Periodic Reports | 12 April 2023 | Submittal of Periodic Reports | Fuel cladding |
L-2023-053, Core Operating Limits Report for Cycle 23 | 5 April 2023 | Core Operating Limits Report for Cycle 23 | Boric Acid Shutdown Margin |
L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report | 30 March 2023 | Correction to U4R33 Steam Generator Tube Inspection Report | |
L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update | 28 March 2023 | Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update | Decommissioning Funding Plan Authorized possession limits |
L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications | 27 March 2023 | and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications | Fuel cladding |
L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 | 15 March 2023 | Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 | Non-Destructive Examination Probabilistic Risk Assessment |
L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves | 15 March 2023 | License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves | Anticipated operational occurrence Hydrostatic Probabilistic Risk Assessment Nonconservative Technical Specifications |
L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) | 10 March 2023 | and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) | |
L-2023-023, Revised Steam Generator Tube Inspection Report | 3 March 2023 | Revised Steam Generator Tube Inspection Report | Non-Destructive Examination |
L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application | 3 March 2023 | Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application | Annual Radioactive Effluent Release Report License Renewal Subsequent License Renewal Environmental Justice |
L-2023-037, Annual Radioactive Effluent Release Report | 1 March 2023 | Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
L-2023-034, Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) | 24 February 2023 | Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) | Boric Acid Weld Overlay Nondestructive Examination VT-2 Liquid penetrant Pressure Boundary Leakage |
L-2023-017, Radiological Emergency Plan Revision 73 and Revision 7 4 | 17 February 2023 | Radiological Emergency Plan Revision 73 and Revision 7 4 | |
L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis | 10 February 2023 | Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis | Cyber Security Surveillance Frequency Control Program Time Critical Operator Action |
L-2023-005, Response to Request for Additional Information for Seabrook Relief Request 4RA-22-001 | 26 January 2023 | Response to Request for Additional Information for Seabrook Relief Request 4RA-22-001 | Nondestructive Examination |
L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results | 17 January 2023 | Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results | Safe Shutdown Time Critical Operator Action Exclusive Use Affidavit |
L-2022-186, Submittal of Changes to the Seabrook Station Technical Specification Bases | 14 December 2022 | Submittal of Changes to the Seabrook Station Technical Specification Bases | |
L-2022-176, License Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements | 9 December 2022 | License Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements | Safe Shutdown High winds Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Earthquake |
L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | 9 December 2022 | Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | |
L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 | 1 December 2022 | Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 | |