CNS-18-008, License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing | 19 July 2018 | License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing | Local Leak Rate Testing |
CNS-18-032, Refueling Outage 22 (C2R22) Inservice Inspection Report Summary Report | 12 July 2018 | Refueling Outage 22 (C2R22) Inservice Inspection Report Summary Report | Boric Acid VT-2 |
CNS-18-031, Notice of Enforcement Discretion (NOED) Request | 18 June 2018 | Notice of Enforcement Discretion (NOED) Request | Internal Flooding Enforcement Discretion Probabilistic Risk Assessment FLEX Large early release frequency Pandemic Downpower |
CNS-18-028, 2017 Annual Radiological Environmental Operating Report | 14 May 2018 | 2017 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Chernobyl |
CNS-18-026, Transmittal of 2017/2018 10 CFR 50.59 Evaluation Summary Report | 10 May 2018 | Transmittal of 2017/2018 10 CFR 50.59 Evaluation Summary Report | |
CNS-18-023, (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System | 8 May 2018 | (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System | Safe Shutdown Probabilistic Risk Assessment |
CNS-18-025, Submittal of 2017 Annual Radioactive Effluent Release Report | 30 April 2018 | Submittal of 2017 Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report |
CNS-18-022, Submittal of Emergency Plan Implementing Procedure | 12 April 2018 | Submittal of Emergency Plan Implementing Procedure | Grab sample Exemption Request Grace period |
CNS-18-017, Catawba, Units 1 and 2, Submittal of Emergency Plan, Revision 18-1 and 18-2 | 24 March 2018 | Catawba, Units 1 and 2, Submittal of Emergency Plan, Revision 18-1 and 18-2 | |
CNS-18-015, Commitment Change Evaluation Report for 2017 | 22 March 2018 | Commitment Change Evaluation Report for 2017 | |
CNS-18-005, Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes | 8 February 2018 | Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes | Safe Shutdown Shutdown Margin High Radiation Area Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Anticipated operational occurrence Tornado Missile Time to boil Internal Flooding Hydrostatic Operator Manual Action Qualified Offsite Circuit Missed surveillance Surveillance Frequency Control Program Battery sizing License Renewal Power Operated Valves Turbine Missile Fuel cladding Recently irradiated fuel Offsite Circuit Fire Protection Program Fire Watch Grace period Power change Overspeed trip |
CNS-18-006, Submittal of Special Report 2018-01 for the Loose Parts Monitoring System Non-Functional for Greater than 30 Days | 23 January 2018 | Submittal of Special Report 2018-01 for the Loose Parts Monitoring System Non-Functional for Greater than 30 Days | |
CNS-17-058, Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukus | 28 December 2017 | Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushi | Fukushima Dai-Ichi Overspeed trip |
CNS-17-061, Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations Response to NRC Requests for Additional Information | 21 December 2017 | Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations Response to NRC Requests for Additional Information | Incorporated by reference Through-Wall Leak |
CNS-17-056, Catawba Nuclear Station Units 1 and 2, Resubmittal of Emergency Plan, Revision 17-2 | 1 November 2017 | Catawba Nuclear Station Units 1 and 2, Resubmittal of Emergency Plan, Revision 17-2 | |
CNS-17-056, Catawba Nuclear Station Units 1 and 2, Submittal of Emergency Plan, Revision 17-2 | 23 October 2017 | Catawba Nuclear Station Units 1 and 2, Submittal of Emergency Plan, Revision 17-2 | |
CNS-17-053, Transmittal of 2016 Annual Radioactive Effluent Release Report - Supplement | 12 October 2017 | Transmittal of 2016 Annual Radioactive Effluent Release Report - Supplement | Annual Radioactive Effluent Release Report |
CNS-17-048, Supplemental Response to Preliminary White Finding, Apparent Violations, and NRC Inspection Report 05000414/2017012; Enforcement Action 17-122 | 29 September 2017 | Supplemental Response to Preliminary White Finding, Apparent Violations, and NRC Inspection Report 05000414/2017012; Enforcement Action 17-122 | Condition Adverse to Quality Significance Determination Process Preliminary White Finding |
CNS-17-049, Submittal of Ufsar/Selected Licensee Commitment Changes Manual | 28 September 2017 | Submittal of Ufsar/Selected Licensee Commitment Changes Manual | Safe Shutdown High Radiation Area Fire Barrier Stroke time Hydrostatic Operator Manual Action Battery sizing License Renewal Fire Protection Program Fire Watch Hourly Fire Watch Grace period |
CNS-17-051, Independent Spent Fuel Storage Installation (ISFSI) Registration of Spent Fuel Storage Cask | 28 September 2017 | Independent Spent Fuel Storage Installation (ISFSI) Registration of Spent Fuel Storage Cask | |
CNS-17-014, License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion Time | 14 September 2017 | License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion Time | Safe Shutdown Unanalyzed Condition High winds Packing leak Ultimate heat sink Mission time Fire Barrier Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Aging Management Fukushima Dai-Ichi Seismically rugged Surveillance Frequency Control Program Design basis earthquake Spent Fuel Pool Instrumentation Earthquake Fuel cladding Through Wall Leak Through-Wall Leakage Fire Protection Program |
CNS-17-050, ISFSI - Registration of Spent Fuel Storage Cask | 12 September 2017 | ISFSI - Registration of Spent Fuel Storage Cask | |
CNS-17-047, Response to NRC Inspection Report 05000414/2017012 and Preliminary White Finding | 29 August 2017 | Response to NRC Inspection Report 05000414/2017012 and Preliminary White Finding | Preliminary White Finding |
CNS-17-041, ISFSI - Registration of Spent Fuel Storage Cask | 15 August 2017 | ISFSI - Registration of Spent Fuel Storage Cask | |
CNS-17-040, Withdrawal of Inservice Testing Relief Request 17-CN-002 Regarding an Alternative Method to Establish New Reference Values for Testing Chemical and Volume Control Pump | 14 August 2017 | Withdrawal of Inservice Testing Relief Request 17-CN-002 Regarding an Alternative Method to Establish New Reference Values for Testing Chemical and Volume Control Pump | |
CNS-17-039, Relief Request 17-CN-002, Request for Alternative Method to Establish New Inservice Testing Values for a Chemical and Volume Control Pump | 27 July 2017 | Relief Request 17-CN-002, Request for Alternative Method to Establish New Inservice Testing Values for a Chemical and Volume Control Pump | Boric Acid Packing leak Grace period |
CNS-17-036, Mid-Cycle Power Uprate Ascension Startup Report | 29 June 2017 | Mid-Cycle Power Uprate Ascension Startup Report | Power Uprate Measurement Uncertainty Recapture Thermography |
CNS-17-033, Technical Specification Bases Changes | 27 June 2017 | Technical Specification Bases Changes | Boric Acid High Radiation Area Stroke time Surveillance Frequency Control Program Power Operated Valves Fuel cladding |
CNS-17-029, Flood Hazard Mitigating Strategies Assessment Report Submittal | 20 June 2017 | Flood Hazard Mitigating Strategies Assessment Report Submittal | Ultimate heat sink FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation |
CNS-17-030, Catawba, Unit 1, Submittal of Core Operating Limits Report (Colr) for Cycle 24 Reload Core | 20 June 2017 | Catawba, Unit 1, Submittal of Core Operating Limits Report (Colr) for Cycle 24 Reload Core | Boric Acid Shutdown Margin |
CNS-17-024, Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations | 25 May 2017 | Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations | Nondestructive Examination VT-2 Liquid penetrant Operational leakage |
CNS-17-031, Response to NRC Requests for Additional Information End of Cycle 21 Refueling Outage Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report | 24 May 2017 | Response to NRC Requests for Additional Information End of Cycle 21 Refueling Outage Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report | |
CNS-17-027, Submittal of 2015/2016 10 CFR 50.59 Evaluation Summary Report | 10 May 2017 | Submittal of 2015/2016 10 CFR 50.59 Evaluation Summary Report | |
CNS-17-015, Catawba Nuclear Station, Units 1 and 2 - Submittal of 2016 Annual Radioactive Effluent Release Report | 27 April 2017 | Catawba Nuclear Station, Units 1 and 2 - Submittal of 2016 Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
CNS-17-021, Special Report 2017-01 for the Units 1 and 2 Loose Parts Monitoring System Non-Functional for Greater than 30 Days | 20 April 2017 | Special Report 2017-01 for the Units 1 and 2 Loose Parts Monitoring System Non-Functional for Greater than 30 Days | |
CNS-17-020, Application to Adopt ASME Code Case OMN-20 (CN-GRR-01) for Pump and Valve Inservice Testing | 11 April 2017 | Application to Adopt ASME Code Case OMN-20 (CN-GRR-01) for Pump and Valve Inservice Testing | Incorporated by reference Operability Determination |
CNS-17-008, Commitment Change Evaluation Report for 2016 | 16 March 2017 | Commitment Change Evaluation Report for 2016 | |
CNS-17-004, Response to NRC Request for Additional Information on License Amendment Request to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants. | 26 January 2017 | Response to NRC Request for Additional Information on License Amendment Request to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants. | Safe Shutdown High winds Fire Protection Program |
CNS-17-002, End of Cycle 21 Refueling Outage, Lnservice Inspection Report and Steam Generator Lnservice Inspection Summary Report | 6 January 2017 | End of Cycle 21 Refueling Outage, Lnservice Inspection Report and Steam Generator Lnservice Inspection Summary Report | Boric Acid Non-Destructive Examination VT-2 |
CNS-16-080, Submittal of Emergency Plan Implementing Procedure | 20 December 2016 | Submittal of Emergency Plan Implementing Procedure | Exemption Request |
CNS-16-077, Expedited Seismic Evaluation Process Closeout, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 8 December 2016 | Expedited Seismic Evaluation Process Closeout, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Fukushima Dai-Ichi |
CNS-16-066, Stations - Supplemental Information Regarding Reevaluated Seismic Hazard Screening and Prioritization Results - Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task.. | 20 October 2016 | Stations - Supplemental Information Regarding Reevaluated Seismic Hazard Screening and Prioritization Results - Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task.. | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment FLEX B.5.b Fukushima Dai-Ichi Significance Determination Process Seismically rugged Large early release frequency Spent Fuel Pool Instrumentation Earthquake Hardened vent Backfit |
CNS-16-069, Submittal of Emergency Plan, Revision 16-2 | 10 October 2016 | Submittal of Emergency Plan, Revision 16-2 | B.5.b Exemption Request Minimum staff Siren |
CNS-16-068, Submittal of Emergency Plan Implementing Procedure Revisions | 10 October 2016 | Submittal of Emergency Plan Implementing Procedure Revisions | Exemption Request |
CNS-16-064, License Amendment Request to Adopt National Fire Protection and Revised Response to Probabilistic Risk Assessment Request for Additional Information 24 | 7 September 2016 | License Amendment Request to Adopt National Fire Protection and Revised Response to Probabilistic Risk Assessment Request for Additional Information 24 | Safe Shutdown Probabilistic Risk Assessment Fire Protection Program |
CNS-16-061, Submittal of Design Basis Specification for the Plant Fire Protection Revision 25 | 12 August 2016 | Submittal of Design Basis Specification for the Plant Fire Protection Revision 25 | Incorporated by reference |
CNS-16-051, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, Response to NRC Request for Additional Information (RAI) an | 2 August 2016 | License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, Response to NRC Request for Additional Information (RAI) and | Safe Shutdown Fire Barrier Probabilistic Risk Assessment Fire Protection Program |
CNS-16-049, ISFSI Registration of Spent Fuel Storage Cask | 14 July 2016 | ISFSI Registration of Spent Fuel Storage Cask | |
CNS-16-056, Transmittal of Emergency Plan Implementing Procedures, Including Revision 034 to RP/0/A/5000/006A and Revision 038 to RP/0/A/5000/0068 | 13 July 2016 | Transmittal of Emergency Plan Implementing Procedures, Including Revision 034 to RP/0/A/5000/006A and Revision 038 to RP/0/A/5000/0068 | Exemption Request Earthquake |
CNS-16-050, Unit 2 - Ufsar/Selected Licensee Commitment Changes | 12 July 2016 | Unit 2 - Ufsar/Selected Licensee Commitment Changes | Operability Determination Overspeed trip Thermography |