Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CNS-18-008, License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing19 July 2018License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate TestingLocal Leak Rate Testing
CNS-18-032, Refueling Outage 22 (C2R22) Inservice Inspection Report Summary Report12 July 2018Refueling Outage 22 (C2R22) Inservice Inspection Report Summary ReportBoric Acid
VT-2
CNS-18-031, Notice of Enforcement Discretion (NOED) Request18 June 2018Notice of Enforcement Discretion (NOED) RequestInternal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
FLEX
Large early release frequency
Pandemic
Downpower
CNS-18-028, 2017 Annual Radiological Environmental Operating Report14 May 20182017 Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
Chernobyl
CNS-18-026, Transmittal of 2017/2018 10 CFR 50.59 Evaluation Summary Report10 May 2018Transmittal of 2017/2018 10 CFR 50.59 Evaluation Summary Report
CNS-18-023, (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System8 May 2018(Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water SystemSafe Shutdown
Probabilistic Risk Assessment
CNS-18-025, Submittal of 2017 Annual Radioactive Effluent Release Report30 April 2018Submittal of 2017 Annual Radioactive Effluent Release ReportAnnual Radioactive Effluent Release Report
CNS-18-022, Submittal of Emergency Plan Implementing Procedure12 April 2018Submittal of Emergency Plan Implementing ProcedureGrab sample
Exemption Request
Grace period
CNS-18-017, Catawba, Units 1 and 2, Submittal of Emergency Plan, Revision 18-1 and 18-224 March 2018Catawba, Units 1 and 2, Submittal of Emergency Plan, Revision 18-1 and 18-2
CNS-18-015, Commitment Change Evaluation Report for 201722 March 2018Commitment Change Evaluation Report for 2017
CNS-18-005, Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes8 February 2018Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment ChangesSafe Shutdown
Shutdown Margin
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Time to boil
Internal Flooding
Hydrostatic
Operator Manual Action
Qualified Offsite Circuit
Missed surveillance
Surveillance Frequency Control Program
Battery sizing
License Renewal
Power Operated Valves
Turbine Missile
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Fire Protection Program
Fire Watch
Grace period
Power change
Overspeed trip
CNS-18-006, Submittal of Special Report 2018-01 for the Loose Parts Monitoring System Non-Functional for Greater than 30 Days23 January 2018Submittal of Special Report 2018-01 for the Loose Parts Monitoring System Non-Functional for Greater than 30 Days
CNS-17-058, Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukus28 December 2017Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the FukushiFukushima Dai-Ichi
Overspeed trip
CNS-17-061, Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations Response to NRC Requests for Additional Information21 December 2017Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations Response to NRC Requests for Additional InformationIncorporated by reference
Through-Wall Leak
CNS-17-056, Catawba Nuclear Station Units 1 and 2, Resubmittal of Emergency Plan, Revision 17-21 November 2017Catawba Nuclear Station Units 1 and 2, Resubmittal of Emergency Plan, Revision 17-2
CNS-17-056, Catawba Nuclear Station Units 1 and 2, Submittal of Emergency Plan, Revision 17-223 October 2017Catawba Nuclear Station Units 1 and 2, Submittal of Emergency Plan, Revision 17-2
CNS-17-053, Transmittal of 2016 Annual Radioactive Effluent Release Report - Supplement12 October 2017Transmittal of 2016 Annual Radioactive Effluent Release Report - SupplementAnnual Radioactive Effluent Release Report
CNS-17-048, Supplemental Response to Preliminary White Finding, Apparent Violations, and NRC Inspection Report 05000414/2017012; Enforcement Action 17-12229 September 2017Supplemental Response to Preliminary White Finding, Apparent Violations, and NRC Inspection Report 05000414/2017012; Enforcement Action 17-122Condition Adverse to Quality
Significance Determination Process
Preliminary White Finding
CNS-17-049, Submittal of Ufsar/Selected Licensee Commitment Changes Manual28 September 2017Submittal of Ufsar/Selected Licensee Commitment Changes ManualSafe Shutdown
High Radiation Area
Fire Barrier
Stroke time
Hydrostatic
Operator Manual Action
Battery sizing
License Renewal
Fire Protection Program
Fire Watch
Hourly Fire Watch
Grace period
CNS-17-051, Independent Spent Fuel Storage Installation (ISFSI) Registration of Spent Fuel Storage Cask28 September 2017Independent Spent Fuel Storage Installation (ISFSI) Registration of Spent Fuel Storage Cask
CNS-17-014, License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion Time14 September 2017License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion TimeSafe Shutdown
Unanalyzed Condition
High winds
Packing leak
Ultimate heat sink
Mission time
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
FLEX
Aging Management
Fukushima Dai-Ichi
Seismically rugged
Surveillance Frequency Control Program
Design basis earthquake
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Through Wall Leak
Through-Wall Leakage
Fire Protection Program
CNS-17-050, ISFSI - Registration of Spent Fuel Storage Cask12 September 2017ISFSI - Registration of Spent Fuel Storage Cask
CNS-17-047, Response to NRC Inspection Report 05000414/2017012 and Preliminary White Finding29 August 2017Response to NRC Inspection Report 05000414/2017012 and Preliminary White FindingPreliminary White Finding
CNS-17-041, ISFSI - Registration of Spent Fuel Storage Cask15 August 2017ISFSI - Registration of Spent Fuel Storage Cask
CNS-17-040, Withdrawal of Inservice Testing Relief Request 17-CN-002 Regarding an Alternative Method to Establish New Reference Values for Testing Chemical and Volume Control Pump14 August 2017Withdrawal of Inservice Testing Relief Request 17-CN-002 Regarding an Alternative Method to Establish New Reference Values for Testing Chemical and Volume Control Pump
CNS-17-039, Relief Request 17-CN-002, Request for Alternative Method to Establish New Inservice Testing Values for a Chemical and Volume Control Pump27 July 2017Relief Request 17-CN-002, Request for Alternative Method to Establish New Inservice Testing Values for a Chemical and Volume Control PumpBoric Acid
Packing leak
Grace period
CNS-17-036, Mid-Cycle Power Uprate Ascension Startup Report29 June 2017Mid-Cycle Power Uprate Ascension Startup ReportPower Uprate
Measurement Uncertainty Recapture
Thermography
CNS-17-033, Technical Specification Bases Changes27 June 2017Technical Specification Bases ChangesBoric Acid
High Radiation Area
Stroke time
Surveillance Frequency Control Program
Power Operated Valves
Fuel cladding
CNS-17-029, Flood Hazard Mitigating Strategies Assessment Report Submittal20 June 2017Flood Hazard Mitigating Strategies Assessment Report SubmittalUltimate heat sink
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
CNS-17-030, Catawba, Unit 1, Submittal of Core Operating Limits Report (Colr) for Cycle 24 Reload Core20 June 2017Catawba, Unit 1, Submittal of Core Operating Limits Report (Colr) for Cycle 24 Reload CoreBoric Acid
Shutdown Margin
CNS-17-024, Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations25 May 2017Third Ten-Year Inservice Inspection Plan, Limited Volumetric ExaminationsNondestructive Examination
VT-2
Liquid penetrant
Operational leakage
CNS-17-031, Response to NRC Requests for Additional Information End of Cycle 21 Refueling Outage Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report24 May 2017Response to NRC Requests for Additional Information End of Cycle 21 Refueling Outage Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report
CNS-17-027, Submittal of 2015/2016 10 CFR 50.59 Evaluation Summary Report10 May 2017Submittal of 2015/2016 10 CFR 50.59 Evaluation Summary Report
CNS-17-015, Catawba Nuclear Station, Units 1 and 2 - Submittal of 2016 Annual Radioactive Effluent Release Report27 April 2017Catawba Nuclear Station, Units 1 and 2 - Submittal of 2016 Annual Radioactive Effluent Release ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
CNS-17-021, Special Report 2017-01 for the Units 1 and 2 Loose Parts Monitoring System Non-Functional for Greater than 30 Days20 April 2017Special Report 2017-01 for the Units 1 and 2 Loose Parts Monitoring System Non-Functional for Greater than 30 Days
CNS-17-020, Application to Adopt ASME Code Case OMN-20 (CN-GRR-01) for Pump and Valve Inservice Testing11 April 2017Application to Adopt ASME Code Case OMN-20 (CN-GRR-01) for Pump and Valve Inservice TestingIncorporated by reference
Operability Determination
CNS-17-008, Commitment Change Evaluation Report for 201616 March 2017Commitment Change Evaluation Report for 2016
CNS-17-004, Response to NRC Request for Additional Information on License Amendment Request to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants.26 January 2017Response to NRC Request for Additional Information on License Amendment Request to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants.Safe Shutdown
High winds
Fire Protection Program
CNS-17-002, End of Cycle 21 Refueling Outage, Lnservice Inspection Report and Steam Generator Lnservice Inspection Summary Report6 January 2017End of Cycle 21 Refueling Outage, Lnservice Inspection Report and Steam Generator Lnservice Inspection Summary ReportBoric Acid
Non-Destructive Examination
VT-2
CNS-16-080, Submittal of Emergency Plan Implementing Procedure20 December 2016Submittal of Emergency Plan Implementing ProcedureExemption Request
CNS-16-077, Expedited Seismic Evaluation Process Closeout, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident8 December 2016Expedited Seismic Evaluation Process Closeout, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentFukushima Dai-Ichi
CNS-16-066, Stations - Supplemental Information Regarding Reevaluated Seismic Hazard Screening and Prioritization Results - Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task..20 October 2016Stations - Supplemental Information Regarding Reevaluated Seismic Hazard Screening and Prioritization Results - Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task..Safe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
B.5.b
Fukushima Dai-Ichi
Significance Determination Process
Seismically rugged
Large early release frequency
Spent Fuel Pool Instrumentation
Earthquake
Hardened vent
Backfit
CNS-16-069, Submittal of Emergency Plan, Revision 16-210 October 2016Submittal of Emergency Plan, Revision 16-2B.5.b
Exemption Request
Minimum staff
Siren
CNS-16-068, Submittal of Emergency Plan Implementing Procedure Revisions10 October 2016Submittal of Emergency Plan Implementing Procedure RevisionsExemption Request
CNS-16-064, License Amendment Request to Adopt National Fire Protection and Revised Response to Probabilistic Risk Assessment Request for Additional Information 247 September 2016License Amendment Request to Adopt National Fire Protection and Revised Response to Probabilistic Risk Assessment Request for Additional Information 24Safe Shutdown
Probabilistic Risk Assessment
Fire Protection Program
CNS-16-061, Submittal of Design Basis Specification for the Plant Fire Protection Revision 2512 August 2016Submittal of Design Basis Specification for the Plant Fire Protection Revision 25Incorporated by reference
CNS-16-051, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, Response to NRC Request for Additional Information (RAI) an2 August 2016License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, Response to NRC Request for Additional Information (RAI) andSafe Shutdown
Fire Barrier
Probabilistic Risk Assessment
Fire Protection Program
CNS-16-049, ISFSI Registration of Spent Fuel Storage Cask14 July 2016ISFSI Registration of Spent Fuel Storage Cask
CNS-16-056, Transmittal of Emergency Plan Implementing Procedures, Including Revision 034 to RP/0/A/5000/006A and Revision 038 to RP/0/A/5000/006813 July 2016Transmittal of Emergency Plan Implementing Procedures, Including Revision 034 to RP/0/A/5000/006A and Revision 038 to RP/0/A/5000/0068Exemption Request
Earthquake
CNS-16-050, Unit 2 - Ufsar/Selected Licensee Commitment Changes12 July 2016Unit 2 - Ufsar/Selected Licensee Commitment ChangesOperability Determination
Overspeed trip
Thermography