CNS-18-017, Catawba, Units 1 and 2, Submittal of Emergency Plan, Revision 18-1 and 18-2

From kanterella
Jump to navigation Jump to search
Catawba, Units 1 and 2, Submittal of Emergency Plan, Revision 18-1 and 18-2
ML18088A186
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/24/2018
From: Simril T
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNS-18-017
Download: ML18088A186 (2)


Text

~-* (/_~DUKE ENERG'l CNS-18-017 March 24, 2018 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk* Washington, DC 20555-0001

Subject:

Duke Energy Carolinas, LLC Catawba Nuclear Station Units 1 and 2 Docket Nos. 50-413 and 50-414 Emergency Plan, Revision 18-1 and 18-2 Tom Simril Vice President Catawba Nuclear Station Duke Energy CN01VP 14800 Concord Road York, SC 29745 o: 803.701.3340 f: 803. 701.3221 tom.simril@duke-energy.com 10CFR 50.54(q) Enclosed for NRC Staff use is Revision 18-1 to the Catawba Nuclear Station Emergency Plan. All changes have been specifically highlighted (side-barred).

This revision is effective as of March 1, 2018. Also enclosed is Revision 18-2 due to Revision 18-1 incorrectly having an issue date of January 2018 on some sections of the Catawba Nuclear Station Emergency Plan. These revisions are being submitted in accordance with 1 OCFR 50.54( q) and are not a reduction in the effectiveness of the Emergency Plan. The 10CFR 50.54(q) Evaluations for Revision 18-1 are provided as Attachment 1, as are the 1 OCFR 50.54( q) Screens for the strictly editorial changes made in Revision 18-2. By copy of this letter, two copies of these documents are being provided to the NRC, Region II. If there are any questions, please contact Tom Arlow at 803-701-4027.

Sincerely, _ ---r£7Y'A~

Tom Simril Vice President, Catawba Nuclear Station Attachments:

1. 1 OCFRS0.54 (q) Evaluations and screens 2. Plan update instructions
3. Emergency Plan, Revision 18-1 4. Emergency Plan, Revision 18-2 www.duke-energy.com

'~ ,, Catawba Nuclear Station E-Plan Revision 18-1 and 18-2 CNS-18-017 March 24, 2018 Page 2 xc (w/attachments):

Catherine Haney, Regional Administrator U. S. Nuclear Regulatory Commission

-Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 xc (w/o attachments):

Michael Mahoney NRG Project Manager (CNS) U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 0881A 11555 Rockville Pike Rockville, MD 20852-2738 Joseph D. Austin NRG Senior Resident Inspector (CNS)