Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML14010A4612014-01-15015 January 2014 Acceptance of Requested Licensing Action License Amendment Request to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants Project stage: Acceptance Review ML14293A7312014-10-21021 October 2014 Regulatory Audit in Support of the License Amendment Request to Implement a Risk-Informed, Performance-Based, Fire Protection Program Project stage: Other ML14308A0372014-11-20020 November 2014 Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program Project stage: RAI CNS-15-001, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, 75-Day Response to NRC Request for Additional...2015-01-13013 January 2015 License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, 75-Day Response to NRC Request for Additional... Project stage: Request CNS-15-018, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, 120-Day Response to NRC RAI2015-02-27027 February 2015 License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, 120-Day Response to NRC RAI Project stage: Response to RAI CNS-15-027, License Amendment Request (LAR) to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants2015-03-30030 March 2015 License Amendment Request (LAR) to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants Project stage: Request ML15099A5872015-04-14014 April 2015 Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson Project stage: Meeting ML15110A4532015-04-22022 April 2015 Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program Project stage: RAI ML15125A5212015-05-10010 May 2015 Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program Project stage: RAI ML15147A6762015-06-18018 June 2015 Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program Project stage: RAI ML15169A8752015-06-25025 June 2015 Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program Project stage: RAI ML15175A0712015-07-0202 July 2015 Request for Additional Information Regarding License Amendments Request to Implement a Risk-Informed, Performance-Based Fire Protection Program Project stage: RAI CNS-15-067, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, Supplemental Response to NRC Request For..2015-07-15015 July 2015 License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, Supplemental Response to NRC Request For.. Project stage: Supplement CNS-15-070, Supplemental Response to NRC Request for License Amendment Request to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants2015-08-14014 August 2015 Supplemental Response to NRC Request for License Amendment Request to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants Project stage: Supplement CNS-15-101, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants2015-12-11011 December 2015 License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants Project stage: Request CNS-16-002, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plan, LAR Supplement to Transmit Entire Attachment.2016-01-0707 January 2016 License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plan, LAR Supplement to Transmit Entire Attachment. Project stage: Supplement CNS-16-014, License Amendment Request (LAR) to Adopt National Fire Protection (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, LAR Submittal to Correct a Legacy Submittal Discrepancy And.2016-03-23023 March 2016 License Amendment Request (LAR) to Adopt National Fire Protection (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, LAR Submittal to Correct a Legacy Submittal Discrepancy And. Project stage: Request CNS-16-030, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants - LAR Supplement to Address ...2016-06-15015 June 2016 License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants - LAR Supplement to Address ... Project stage: Supplement CNS-16-051, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, Response to NRC Request for Additional Information (RAI) an2016-08-0202 August 2016 License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, Response to NRC Request for Additional Information (RAI) and Project stage: Response to RAI CNS-16-064, License Amendment Request to Adopt National Fire Protection and Revised Response to Probabilistic Risk Assessment Request for Additional Information 242016-09-0707 September 2016 License Amendment Request to Adopt National Fire Protection and Revised Response to Probabilistic Risk Assessment Request for Additional Information 24 Project stage: Request CNS-17-004, Response to NRC Request for Additional Information on License Amendment Request to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants.2017-01-26026 January 2017 Response to NRC Request for Additional Information on License Amendment Request to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants. Project stage: Response to RAI 2015-06-18
[Table View] |
|
---|
Category:Fire Protection Plan
[Table view] Category:Letter type:CNS
MONTHYEARCNS-18-008, License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing2018-07-19019 July 2018 License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing CNS-18-032, Refueling Outage 22 (C2R22) Inservice Inspection Report Summary Report2018-07-12012 July 2018 Refueling Outage 22 (C2R22) Inservice Inspection Report Summary Report CNS-18-031, Notice of Enforcement Discretion (NOED) Request2018-06-18018 June 2018 Notice of Enforcement Discretion (NOED) Request CNS-18-028, 2017 Annual Radiological Environmental Operating Report2018-05-14014 May 2018 2017 Annual Radiological Environmental Operating Report CNS-18-026, Transmittal of 2017/2018 10 CFR 50.59 Evaluation Summary Report2018-05-10010 May 2018 Transmittal of 2017/2018 10 CFR 50.59 Evaluation Summary Report CNS-18-023, (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System2018-05-0808 May 2018 (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System CNS-18-025, Submittal of 2017 Annual Radioactive Effluent Release Report2018-04-30030 April 2018 Submittal of 2017 Annual Radioactive Effluent Release Report CNS-18-022, Submittal of Emergency Plan Implementing Procedure2018-04-12012 April 2018 Submittal of Emergency Plan Implementing Procedure CNS-18-017, Catawba, Units 1 and 2, Submittal of Emergency Plan, Revision 18-1 and 18-22018-03-24024 March 2018 Catawba, Units 1 and 2, Submittal of Emergency Plan, Revision 18-1 and 18-2 CNS-18-015, Commitment Change Evaluation Report for 20172018-03-22022 March 2018 Commitment Change Evaluation Report for 2017 CNS-18-005, Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes2018-02-0808 February 2018 Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes CNS-18-006, Submittal of Special Report 2018-01 for the Loose Parts Monitoring System Non-Functional for Greater than 30 Days2018-01-23023 January 2018 Submittal of Special Report 2018-01 for the Loose Parts Monitoring System Non-Functional for Greater than 30 Days CNS-17-058, Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukus2017-12-28028 December 2017 Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushi CNS-17-061, Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations Response to NRC Requests for Additional Information2017-12-21021 December 2017 Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations Response to NRC Requests for Additional Information CNS-17-056, Catawba Nuclear Station Units 1 and 2, Resubmittal of Emergency Plan, Revision 17-22017-11-0101 November 2017 Catawba Nuclear Station Units 1 and 2, Resubmittal of Emergency Plan, Revision 17-2 CNS-17-056, Catawba Nuclear Station Units 1 and 2, Submittal of Emergency Plan, Revision 17-22017-10-23023 October 2017 Catawba Nuclear Station Units 1 and 2, Submittal of Emergency Plan, Revision 17-2 CNS-17-053, Transmittal of 2016 Annual Radioactive Effluent Release Report - Supplement2017-10-12012 October 2017 Transmittal of 2016 Annual Radioactive Effluent Release Report - Supplement CNS-17-048, Supplemental Response to Preliminary White Finding, Apparent Violations, and NRC Inspection Report 05000414/2017012; Enforcement Action 17-1222017-09-29029 September 2017 Supplemental Response to Preliminary White Finding, Apparent Violations, and NRC Inspection Report 05000414/2017012; Enforcement Action 17-122 CNS-17-049, Submittal of Ufsar/Selected Licensee Commitment Changes Manual2017-09-28028 September 2017 Submittal of Ufsar/Selected Licensee Commitment Changes Manual CNS-17-051, Independent Spent Fuel Storage Installation (ISFSI) Registration of Spent Fuel Storage Cask2017-09-28028 September 2017 Independent Spent Fuel Storage Installation (ISFSI) Registration of Spent Fuel Storage Cask CNS-17-014, License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion Time2017-09-14014 September 2017 License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion Time CNS-17-050, ISFSI - Registration of Spent Fuel Storage Cask2017-09-12012 September 2017 ISFSI - Registration of Spent Fuel Storage Cask CNS-17-047, Response to NRC Inspection Report 05000414/2017012 and Preliminary White Finding2017-08-29029 August 2017 Response to NRC Inspection Report 05000414/2017012 and Preliminary White Finding CNS-17-041, ISFSI - Registration of Spent Fuel Storage Cask2017-08-15015 August 2017 ISFSI - Registration of Spent Fuel Storage Cask CNS-17-040, Withdrawal of Inservice Testing Relief Request 17-CN-002 Regarding an Alternative Method to Establish New Reference Values for Testing Chemical and Volume Control Pump2017-08-14014 August 2017 Withdrawal of Inservice Testing Relief Request 17-CN-002 Regarding an Alternative Method to Establish New Reference Values for Testing Chemical and Volume Control Pump CNS-17-039, Relief Request 17-CN-002, Request for Alternative Method to Establish New Inservice Testing Values for a Chemical and Volume Control Pump2017-07-27027 July 2017 Relief Request 17-CN-002, Request for Alternative Method to Establish New Inservice Testing Values for a Chemical and Volume Control Pump CNS-17-036, Mid-Cycle Power Uprate Ascension Startup Report2017-06-29029 June 2017 Mid-Cycle Power Uprate Ascension Startup Report CNS-17-033, Technical Specification Bases Changes2017-06-27027 June 2017 Technical Specification Bases Changes CNS-17-029, Flood Hazard Mitigating Strategies Assessment Report Submittal2017-06-20020 June 2017 Flood Hazard Mitigating Strategies Assessment Report Submittal CNS-17-030, Catawba, Unit 1, Submittal of Core Operating Limits Report (Colr) for Cycle 24 Reload Core2017-06-20020 June 2017 Catawba, Unit 1, Submittal of Core Operating Limits Report (Colr) for Cycle 24 Reload Core CNS-17-024, Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations2017-05-25025 May 2017 Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations CNS-17-031, Response to NRC Requests for Additional Information End of Cycle 21 Refueling Outage Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report2017-05-24024 May 2017 Response to NRC Requests for Additional Information End of Cycle 21 Refueling Outage Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report CNS-17-027, Submittal of 2015/2016 10 CFR 50.59 Evaluation Summary Report2017-05-10010 May 2017 Submittal of 2015/2016 10 CFR 50.59 Evaluation Summary Report CNS-17-015, Catawba Nuclear Station, Units 1 and 2 - Submittal of 2016 Annual Radioactive Effluent Release Report2017-04-27027 April 2017 Catawba Nuclear Station, Units 1 and 2 - Submittal of 2016 Annual Radioactive Effluent Release Report CNS-17-021, Special Report 2017-01 for the Units 1 and 2 Loose Parts Monitoring System Non-Functional for Greater than 30 Days2017-04-20020 April 2017 Special Report 2017-01 for the Units 1 and 2 Loose Parts Monitoring System Non-Functional for Greater than 30 Days CNS-17-020, Application to Adopt ASME Code Case OMN-20 (CN-GRR-01) for Pump and Valve Inservice Testing2017-04-11011 April 2017 Application to Adopt ASME Code Case OMN-20 (CN-GRR-01) for Pump and Valve Inservice Testing CNS-17-008, Commitment Change Evaluation Report for 20162017-03-16016 March 2017 Commitment Change Evaluation Report for 2016 CNS-17-004, Response to NRC Request for Additional Information on License Amendment Request to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants.2017-01-26026 January 2017 Response to NRC Request for Additional Information on License Amendment Request to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants. CNS-17-002, End of Cycle 21 Refueling Outage, Lnservice Inspection Report and Steam Generator Lnservice Inspection Summary Report2017-01-0606 January 2017 End of Cycle 21 Refueling Outage, Lnservice Inspection Report and Steam Generator Lnservice Inspection Summary Report CNS-16-080, Submittal of Emergency Plan Implementing Procedure2016-12-20020 December 2016 Submittal of Emergency Plan Implementing Procedure CNS-16-077, Expedited Seismic Evaluation Process Closeout, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-12-0808 December 2016 Expedited Seismic Evaluation Process Closeout, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident CNS-16-066, Stations - Supplemental Information Regarding Reevaluated Seismic Hazard Screening and Prioritization Results - Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task..2016-10-20020 October 2016 Stations - Supplemental Information Regarding Reevaluated Seismic Hazard Screening and Prioritization Results - Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task.. CNS-16-069, Submittal of Emergency Plan, Revision 16-22016-10-10010 October 2016 Submittal of Emergency Plan, Revision 16-2 CNS-16-068, Submittal of Emergency Plan Implementing Procedure Revisions2016-10-10010 October 2016 Submittal of Emergency Plan Implementing Procedure Revisions CNS-16-064, License Amendment Request to Adopt National Fire Protection and Revised Response to Probabilistic Risk Assessment Request for Additional Information 242016-09-0707 September 2016 License Amendment Request to Adopt National Fire Protection and Revised Response to Probabilistic Risk Assessment Request for Additional Information 24 CNS-16-061, Submittal of Design Basis Specification for the Plant Fire Protection Revision 252016-08-12012 August 2016 Submittal of Design Basis Specification for the Plant Fire Protection Revision 25 CNS-16-051, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, Response to NRC Request for Additional Information (RAI) an2016-08-0202 August 2016 License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, Response to NRC Request for Additional Information (RAI) and CNS-16-049, ISFSI Registration of Spent Fuel Storage Cask2016-07-14014 July 2016 ISFSI Registration of Spent Fuel Storage Cask CNS-16-056, Transmittal of Emergency Plan Implementing Procedures, Including Revision 034 to RP/0/A/5000/006A and Revision 038 to RP/0/A/5000/00682016-07-13013 July 2016 Transmittal of Emergency Plan Implementing Procedures, Including Revision 034 to RP/0/A/5000/006A and Revision 038 to RP/0/A/5000/0068 CNS-16-050, Unit 2 - Ufsar/Selected Licensee Commitment Changes2016-07-12012 July 2016 Unit 2 - Ufsar/Selected Licensee Commitment Changes 2018-07-19
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-22-0195, Response to Request for Additional Information (RAI) for the Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue for the Safety Injection Nozzle2022-06-29029 June 2022 Response to Request for Additional Information (RAI) for the Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue for the Safety Injection Nozzle RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility2022-05-13013 May 2022 Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility RA-22-0102, Response to Request for Additional Information (RAI) Regarding Revision 1 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology2022-04-0707 April 2022 Response to Request for Additional Information (RAI) Regarding Revision 1 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology RA-22-0003, Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative2022-01-31031 January 2022 Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative RA-21-0321, Response to Request for Additional Information (RAI) Regarding Refuel 24 (C2R24) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report2021-12-14014 December 2021 Response to Request for Additional Information (RAI) Regarding Refuel 24 (C2R24) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan2021-03-11011 March 2021 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan RA-21-0032, Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(42021-02-11011 February 2021 Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)( RA-21-0017, Response to Request for Additional Information Re License Amendment Request to Revise Tech Spec 3.8.1 to Reduce Emergency Diesel Generator Maximum Steady State Voltage2021-01-29029 January 2021 Response to Request for Additional Information Re License Amendment Request to Revise Tech Spec 3.8.1 to Reduce Emergency Diesel Generator Maximum Steady State Voltage RA-20-0104, Response to NRC Request for Additional Information - Catawba Nuclear Station-SG Report (RA-19-0391)-C2R232020-04-0606 April 2020 Response to NRC Request for Additional Information - Catawba Nuclear Station-SG Report (RA-19-0391)-C2R23 RA-20-0002, Response to Request for Additional Information (RAI) Regarding License Amendment Request to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits2020-02-13013 February 2020 Response to Request for Additional Information (RAI) Regarding License Amendment Request to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits RA-19-0280, Response to NRC RAI Clarifications Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.12019-07-10010 July 2019 Response to NRC RAI Clarifications Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 RA-19-0189, Supplement to Response for Request for Additional Information Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.12019-04-0808 April 2019 Supplement to Response for Request for Additional Information Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 RA-19-0004, Response to NRC for Additional Information (RAI) Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 for Catawba Nuclear Station, Units 1 and 22019-03-0707 March 2019 Response to NRC for Additional Information (RAI) Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 for Catawba Nuclear Station, Units 1 and 2 RA-19-0026, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001)2019-02-11011 February 2019 Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001) RA-18-0162, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2018-12-0606 December 2018 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal RA-18-0097, (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System2018-08-17017 August 2018 (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System CNS-18-023, (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System2018-05-0808 May 2018 (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System NRC-18-0016, Response to Request for Additional Information (Set 2) Regarding License Amendment Request to Revise Technical Specifications to Eliminate Main Steam Line Radiation Monitor Reactor Trip and Primary Containment Isolation System Group 1..2018-02-21021 February 2018 Response to Request for Additional Information (Set 2) Regarding License Amendment Request to Revise Technical Specifications to Eliminate Main Steam Line Radiation Monitor Reactor Trip and Primary Containment Isolation System Group 1.. CNS-17-058, Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukus2017-12-28028 December 2017 Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushi CNS-17-061, Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations Response to NRC Requests for Additional Information2017-12-21021 December 2017 Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations Response to NRC Requests for Additional Information CNS-17-047, Response to NRC Inspection Report 05000414/2017012 and Preliminary White Finding2017-08-29029 August 2017 Response to NRC Inspection Report 05000414/2017012 and Preliminary White Finding RA-17-0039, Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001)2017-08-0909 August 2017 Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001) RA-17-0035, Supplement to License Amendment Request Proposing Changes to Technical Specification 3.5.1, AC Sources - Operating.2017-07-20020 July 2017 Supplement to License Amendment Request Proposing Changes to Technical Specification 3.5.1, AC Sources - Operating. RA-17-0036, Supplement to the Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers2017-07-17017 July 2017 Supplement to the Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers RA-17-0029, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers2017-06-0808 June 2017 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers CNS-17-031, Response to NRC Requests for Additional Information End of Cycle 21 Refueling Outage Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report2017-05-24024 May 2017 Response to NRC Requests for Additional Information End of Cycle 21 Refueling Outage Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report CNS-17-004, Response to NRC Request for Additional Information on License Amendment Request to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants.2017-01-26026 January 2017 Response to NRC Request for Additional Information on License Amendment Request to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants. CNS-16-077, Expedited Seismic Evaluation Process Closeout, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-12-0808 December 2016 Expedited Seismic Evaluation Process Closeout, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident CNS-16-066, Stations - Supplemental Information Regarding Reevaluated Seismic Hazard Screening and Prioritization Results - Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task..2016-10-20020 October 2016 Stations - Supplemental Information Regarding Reevaluated Seismic Hazard Screening and Prioritization Results - Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task.. RA-16-0035, Response to Request for Additional Information (RAI) Regarding Application for Emergency Operations Facility (EOF) Consolidation2016-10-0303 October 2016 Response to Request for Additional Information (RAI) Regarding Application for Emergency Operations Facility (EOF) Consolidation CNS-16-064, License Amendment Request to Adopt National Fire Protection and Revised Response to Probabilistic Risk Assessment Request for Additional Information 242016-09-0707 September 2016 License Amendment Request to Adopt National Fire Protection and Revised Response to Probabilistic Risk Assessment Request for Additional Information 24 CNS-16-051, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, Response to NRC Request for Additional Information (RAI) an2016-08-0202 August 2016 License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, Response to NRC Request for Additional Information (RAI) and ML16204A0602016-07-20020 July 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant, Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident RA-16-0027, Response to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations2016-07-14014 July 2016 Response to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations CNS-16-043, Additional Information Regarding Flood Hazard Reevaluation Report, Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Forc2016-06-23023 June 2016 Additional Information Regarding Flood Hazard Reevaluation Report, Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force CNS-16-035, License Amendment Request to Revise Technical Specifications Permanent Extension of Type a and Type C Leak Rate Test Frequencies, Responses to NRC Requests for Additional Information CAC Nos. MF7265 and MF72662016-06-20020 June 2016 License Amendment Request to Revise Technical Specifications Permanent Extension of Type a and Type C Leak Rate Test Frequencies, Responses to NRC Requests for Additional Information CAC Nos. MF7265 and MF7266 CNS-16-022, Supplemental Information to the Final Notification of Full Compliance with Order EA-12-049,Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and with Order EA-12-051, Et2016-03-31031 March 2016 Supplemental Information to the Final Notification of Full Compliance with Order EA-12-049,Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and with Order EA-12-051, Et A MNS-16-023, Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding License Amendment Request for Control Room Chilled Water System Technical Specifications2016-03-16016 March 2016 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding License Amendment Request for Control Room Chilled Water System Technical Specifications ML16102A1562016-03-11011 March 2016 Proposed Technical Specifications Amendments, TS 3.4.1, Reactor Coolant System Pressure, Temperature and Flow Departure from Nucleate Boiling Limits, Response to NRC Request for Additional Information ML16055A2272016-02-19019 February 2016 Response to Request for Additional Information and Emergency Action Level Technical Bases Document, Revision 1, Redline Version. Part 1 of 4 ML16055A2282016-02-19019 February 2016 Response to Request for Additional Information and Emergency Action Level Technical Bases Document, Revision 1, Redline Version. Part 2 of 4 CNS-16-010, Response to Request for Additional Information and Emergency Action Level Technical Bases Document, Revision 1, Clean Version. Part 4 of 42016-02-19019 February 2016 Response to Request for Additional Information and Emergency Action Level Technical Bases Document, Revision 1, Clean Version. Part 4 of 4 ML16055A2302016-02-19019 February 2016 Response to Request for Additional Information and Emergency Action Level Technical Bases Document, Revision 1, Redline Version. Part 3 of 4 RA-16-0006, Response to NRC Request for Additional Information (RAI) Regarding Application to Use Alternate Fission Gas Gap Release Fractions2016-02-0101 February 2016 Response to NRC Request for Additional Information (RAI) Regarding Application to Use Alternate Fission Gas Gap Release Fractions ML15324A0832015-11-16016 November 2015 License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate, Response to NRC Requests for Additional Information (Rais) CNS-15-086, License Amendment Request (LAR) for Changes to Technical Specification (TS) 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation and TS 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start..2015-10-23023 October 2015 License Amendment Request (LAR) for Changes to Technical Specification (TS) 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation and TS 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start.. CNS-15-075, License Amendment Request (LAR) for Changes to Technical Specification (TS) 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation and TS 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start..2015-08-17017 August 2015 License Amendment Request (LAR) for Changes to Technical Specification (TS) 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation and TS 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start.. 2023-07-07
[Table view] |
Text
e.(.~DUKE Kelvin Henderson
~ ENERGY~ Vice President Catawba Nuclear Station Duke Energy CN01VP I 4800 Concord Road York, SC 29745 o: 803. 701.4251 f: 803.701.3221 CNS-16-051 August 2, 2016 10 CFR 50.90 U.S. Nuclear Regulatory Commission (NRC)
Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Duke Energy Carolinas, LLC (Duke Energy)
Catawba Nuclear Station, Units 1 and 2 Docket Numbers 50-413 and 50-414 License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants Response to NRC Request for Additional Information (RAI) and Revision to RAI Response (TAC Nos. MF2936 and MF2937)
References:
- 1. Letters from Duke Energy to the NRC, dated September 25, 2013
. (ADAMS Accession Number ML13276A503), January 13, 2015 (ADAMS Accession Number ML15015A409), January 28, 2015 (ADAMS Accession Number ML15029A697), February 27, 2015 (ADAMS Accession Number ML15065A107), March 30, 2015 (ADAMS Accession Number ML15091A339),
April 28, 2015 (ADAMS Accession Number ML15119A533), July 15, 2015 (ADAMS Accession Number ML15198A036), August 14, 2015 (ADAMS Accession Number ML15231A010), September 3, 2015 (ADAMS Accession Number ML15310A123), December 11, 2015 (ADAMS Accession Number
. ML15350A014), January 7, 2016 (ADAMS Accession Number ML 16011A'121), March 23, 2016 (ADAMS Accession Number ML16096A262, and June 15, 2016 ADAMS Accession Number ML16169A107)
- 2. Letter from the NRC to Duke Energy, "Catawba Nuclear Station, Units 1 and
Document Control Desk Page2 August2,2016
- 3. Letter from the NRC to Duke Energy, "Catawba Nuclear Station, Units 1 and 2 - Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program (TAC Nos. MF2936 and MF2937)", dated July 7, 2016 (ADAMS Accession Number ML16187A066)
The Reference 1 letters comprise in their entirety Duke Energy's request for NRC review and approval for adoption of a new fire protection licensing basis which complies with the requirements in 10 CFR 50.48(a), 10 CFR 50.48(c), and the guidance in Regulatory Guide (RG) 1.205, "Risk-Informed, Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants," Revision 1, dated December 2009. The September 25, 2013, reference LAR was developed in accordance with the guidance contained in Nuclear Energy Institute (NEI) 04-02, "Guidance for Implementing a Risk-Informed, Performance-Based Fire Protection Program Under 10 CFR 50.48(c)," Revision 2.
The Reference 2 letter, from the NRC to Duke Energy, transmitted RAls necessary for the NRC to continue its review of the September 25, 2013, reference LAR. The Reference 1 letter dated January 28, 2015 (ML15029A697), provided Duke Energy's 90-day response to the RAls.
The Reference 3 letter transmitted an RAI necessary for the NRC to continue its review of the September 25, 2013, r~ference LAR.
The purpose of this letter is to provide a revision to a response provided in the Reference 1 letter dated January 28, 2015 (specifically, FPE RAI 02). As a result of this revision, a revision to "Transition to 10 CFR 50.48(c)- NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, Transition Report,"
(specifically, page L-16 of Attachment L) is also required. Attachment L of the Transition Report was provided to the NRC in the Reference 1 letter dated February 27, 2015(ML15065A107).
The purpose of this letter is also to provide the response to the RAI transmitted in Reference 3 (specifically, PRA RAI 24).
The enclosures to this letter provide the revised FPE RAI 02, the revised (Revision 7) cover letter and affected page L-16 of the Transition Report, and the PRA RAI 24 response. For the specified RAls, the format of the enclosure is to restate each RAI question, followed by its associated response. Enclosures 1 and 2 have the revisions designated by revision bars.
The conclusions of the No Significant Hazards Consideration and the Environmental Consideration contained in the September 25, 2013 reference LAR are unaffected by this submittal.
There are no new regulatory commitments contained in this letter.
Pursuant to 10 CFR 50.91, a copy of this LAR supplement is being sent to the appropriate State of South Carolina official.
Inquiries on this matter should be directed to Sherry Andrews at (803) 701-3424.
Document Control Desk Page 3 August 2, 2016 I declare under penalty of perjury that the foregoing is true and correct.
Executed on August 2, 2016.
Very truly yours,
µ;;~
Kelvin Henderson Vice President, Catawba Nuclear Station Enclosures
Document Control Desk Page 4 August 2, 2016 xc:
C. Haney Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 J.D. Austin Senior Resident Inspector (Catawba)
U.S. Nuclear Regulatory Commission Catawba Nuclear Station M.D. Orenak (addressee only)
NRC Project Manager (Catawba)
U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 S.E. Jenkins Manager Radioactive and Infectious Waste Management Division of Waste Management South Carolina Department of Health and Environmental Control 2600 Bull St.
Columbia, SC 29201
Enclosure 1 Revised FPE RAI 02
Fire Protection Engineering (FPE) Request for Additional Information (RAI) 02 NFPA 805, Section 3.9.2 requires that each automatic and manual water-based fire suppression system be equipped with a water flow alarm. The compliance basis for LAR Attachment A, Section 3.9.2 is "Complies with Clarification" and indicates that manual water-based suppression systems are not provided with water flow alarms. Nuclear Energy Institute (NEI) 04-02, "Guidance for Implementing a Risk- Informed, Performance-Based Program Under 10 CFR 50.48(c)," defines "complies with clarification" as an editorial issue and compliance should be explained in the compliance basis field. The NRC staff does not consider the lack of water flow alarms as an editorial issue.
Provide a compliance strategy commensurate with the guidance of NEI 04-02 that demonstrates compliance with NFPA 805 or provide a detailed justification for not meeting the requirement of NFPA 805 Section 3.9.2.
Duke Energy Response:
Catawba will revise LAR Attachment A Section 3.9.2 compliance statements to include "Comply" and "Submit for NRC Approval" compliance statements. Catawba automatic water-based suppression systems comply with Section 3.9.2 as each system is provided with a water flow alarm. The manual water-based suppression systems do not have water flow alarms and approval is requested for this configuration under 10 CFR 50.48(c)(2)(vii). The approval request is as follows:
Approval Request 5 NFPA 805 Section 3.9.2 NFPA 805, Section 3.9.2 states:
"Each system shall be equipped with a water flow alarm."
At Catawba the automatic water-based suppression systems are provided with water flow alarms. Certain manual water-based suppression systems are not provided with water flow alarms. The manual suppression systems without water flow alarms are those which are located in containment. The manual sprinkler systems are provided for the reactor coolant pumps, the lower containment filters (carbon beds), and the reactor building pipe corridors. These systems require opening of the containment isolation valve in order for water to reach the system and therefore are considered manual suppression systems.
The containment isolation valve is opened if there is indication that there may be fire.
Each system is equipped with closed head fusible link sprinklers. Each system also has an independent detection system in the area consisting of either line-type heat, photo-electric smoke, or rate-of-rise devices. Indication of suppression system actuation would be visual confirmation based on operator response to a detection alarm, personnel in the area observing system operation, or abnormal fire pump/jockey pump operation.
Due to the limited times the containment isolation valve is open, inadvertent actuation without water flow alarm indication is not a concern.
Basis for Request:
The basis for the approval request of this deviation is:
- The control room authorizes opening of the containment isolation valve.
- The suppression systems will only operate after an operator opens the containment isolation valve.
- Each area protected by the manual water-based suppression systems are also protected by automatic detection systems.
- Multiple alternative means of indication of suppression system operation are available.
Nuclear Safety and Radiological Release Performance Criteria:
The lack of water flow alarms does not affect nuclear safety. The manual suppression systems are normally isolated. The Fire PRA and the Fire Risk Evaluations have evaluated the reactor building fire areas and do not credit the manual suppression systems for risk reduction or for defense-in-depth. The suppression systems will only operate after the containment isolation valve is opened. If a fire were to occur there are multiple means of indication that the suppression system has actuated. Therefore there is no impact on the nuclear safety performance criteria.
The radiological review was performed based on the potential location of radiological concerns and is not dependent on water flow alarms in fire protection suppression systems. The lack of water flow alarms does not change the results of the radiological release evaluation performed that concluded that potentially contaminated water is contained and smoke is monitored. The lack of water flow alarms does not add additional radiological materials to the areas or challenge system boundaries.
Safety Margin and Defense-in-Depth:
The methods, input parameters, and acceptance criteria used in this analysis were reviewed against those used for NFPA 805 Chapter 3 acceptance. The methods, input parameters, and acceptance criteria used to determine the adequacy of the fire suppression systems were not altered. The suppression systems will actuate when water is present and the lack of a water flow alarm will not impact the ability of the suppression system to perform its design objectives. Therefore, the safety margin inherent in the analysis of the fire event has been preserved.
The three echelons of defense-in-depth are 1) to prevent fires from starting (combustible/hot work controls), 2) rapidly detect, control and extinguish fires that do occur thereby limiting damage (fire detection systems, automatic fire suppression, manual fire suppression, pre-fire plans), and 3) to provide adequate level of fire protection for systems and structures so that a fire will not prevent essential safety functions from being performed (fire barriers, fire rated cable, success path remains free of fire damage, recovery actions). The manual suppression systems will actuate when the containment isolation valve is open. The lack of water flow alarms does not impact fire protection defense-in-depth and does not result in compromising automatic fire suppression functions, manual fire suppression functions, or post-fire safe shutdown capability. Since both the automatic and manual fire suppression functions are maintained, defense-in-depth is maintained.
==
Conclusion:==
NRC approval is requested for the lack of a water flow alarm on the manual water based suppression systems.
The engineering analysis performed determined that the performance-based approach utilized to evaluate a variance from the requirements of NFPA 805 Chapter 3:
(A) Satisfies the performance goals, performance objectives, and performance criteria specified in NFPA 805 related to nuclear safety and radiological release; (B) Maintains safety margins; and (C) Maintains fire protection defense-in-depth (fire prevention, fire detection, fire suppression, mitigation, and post-fire safe shutdown capability).
A revision to LAR Section 4.1.2.3, Attachment A, and Attachment L for this item is planned to be submitted with the 120 day RAI responses that will include this clarification.
Enclosure 2 Revised Transition Report Pages
Duke Energy Carolinas, LLC Catawba Nuclear Station Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition e/_'->DUKE
"'e ENERGYo Transition Report Revision 7 July 2016
Duke Energy Carolinas, LLC Attachment L - NFPA 805 Chapter 3 Requirements for Approval Approval Request 5 NFPA 805 Section 3.9.2 NFPA 805, Section 3.9.2 states:
"Each system shall be equipped with a water flow alarm."
At CNS the automatic water-based suppression systems are provided with water flow alarms. Certain manual water-based suppression systems are not provided with water flow alarms. The manual suppression systems without water flow alarms are those which are located in containment. The manual sprinkler systems are provided for the
- reactor coolant pumps, the lower containment filters (carbon beds), and the reactor building pipe corridors. These systems require opening of the containment isolation valve in order for water to reach the system and therefore are considered manual suppression systems.
The containment isolation valve is opened if there is indication that there may be fire.
Each system is equipped with closed head fusible link sprinklers. Each system also has an independent detection system in the area consisting of either line-type heat, photo-electric smoke, or rate-of-rise devices. Indication of suppression system actuation would be visual confirmation based on operator response to a detection alarm, personnel in the area observing system operation, or abnormal fire pump/jockey pump operation.
Due to the limited times the containment isolation valve is open, inadvertent actuation without water flow alarm indication is not a concern.
Basis for Request:
The basis for the approval request of this deviation is:
- The control room authorizes opening of the containment isolation valve.
- The suppression systems will only operate after an operator opens the containment isolation valve.
- Each area protected by the manual water-based suppression systems are also protected by automatic detection systems.
- Multiple alternative means of indication of suppression system operation are available.
Nuclear Safety and Radiological Release Performance Criteria:
The lack of water flow alarms does not affect nuclear safety. The manual suppression systems are normally isolated. The Fire PRA and the Fire Risk Evaluations have evaluated the reactor building fire areas and do not credit the manual suppression systems for risk reduction or for defense-in-depth. The suppression systems will only operate after the containment isolation valve is opened. If a fire were to occur there are multiple means of indication that the suppression system has actuated. Therefore there is no impact on the nuclear safety performance criteria.
The radiological review was performed based on the potential location of radiological concerns and is not dependent on water flow alarms in fire protection suppression Rev7 Page L-16
Enclosure 3 PRA RAI 24 Response
Probabilistic Risk Assessment (PRA) Request for Additional Information (RAI) 24 In its letter dated June 15, 2016, the licensee stated that "a gap was identified in the NFPA 805 safe shutdown analysis related to the reactor coolant pump seals and the time available to start the Standby Shutdown Facility's (SSF) standby make-up pump (SMUP)." The NRC staff's understanding of the licensee's PRA is that the SSF is an important contributor to keeping the risk from fires low, and that RCP seal LOCAs are an important contributor to fire risk. Because of the potential importance of the scenarios, the NRC staff requires additional information to determine whether the risk results following the RCP analysis update will remain acceptable or whether additional modifications or evaluations are needed. Please provide the following:
- Summarize the PRA models in which the time available to start the SSF SMUP are used.
- Describe the changes to the PRA input values that may occur when the time available will change.
- Provide the risk results (total CDF, total LERF, change-in-risk associated with transition to NFPA-805) of a sensitivity study based on a reasonable bounding estimate of the change in the time available.
- If the risk results indicate that the risk acceptance guidelines would be exceeded after the RCP analysis update, describe what actions can be taken to bring the risk results below the acceptance guidelines.
Duke Energy Response:
The Catawba Fire PRA uses the Westinghouse Owners' Group (WOG) 2000 Reactor Coolant Pump Seal LOCA model to determine the probability of a potential seal LOCA following an event. A time available of 13 minutes is used to calculate the human error probability (HEP) associated with starting the SSF SMUP. CNS is currently pursuing an analysis to address the gap related to the reactor coolant pump seals and the time available to start the SSF SMUP. It is expected that the new analysis will indicate that the time available for the action to start the SSF SMUP on a loss of all seal cooling will be at least the same or exceed the time currently used for this action's HEP. The new analysis is expected to show a time available of 20 to 30 minutes based on analysis for a similar plant.
The timing results of this analysis will be compared to the assumptions in the Fire PRA to confirm that the HEP is still representative of or bounds the as-built as operated plant.
If the time available, based on the current analysis, does not bound the results of the updated analysis, the requested sensitivity and evaluation of impact on the risk acceptance guidelines will be provided via update to the RAI - 03 response.