Issue date | Title | Topic | |
---|---|---|---|
ML20217A981 | 30 October 1999 | Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites | |
ML20205N987 | 14 April 1999 | Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11 | Safe Shutdown Packing leak High Radiation Area Stroke time Post Accident Monitoring Operating Basis Earthquake Temporary Modification Squib Job Performance Measure Scram Discharge Volume Overtravel Earthquake Downpower |
ML20203G008 | 12 February 1999 | Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06 | |
ML20202F610 | 16 July 1998 | Discusses Green Package Containing,In Part Corp Auditing Rept Numbers 739459-97,dtd 971015,redacted , 739459-1-97,dtd 971201,redacted & 739459-2-98, ,redacted | |
ML20202F634 | 16 April 1998 | Forwards Info from Very Vocal Alleger Caller Re RI-97-A-0145 Ltr.Allegation Disposition Record Encl | High Radiation Area Non-Destructive Examination Grab sample Enforcement Discretion Condition Adverse to Quality Job Performance Measure Foreign Material Exclusion Operability Determination |
ML20202F668 | 19 March 1998 | Dicusses Vocal Alleger Who Called Re OI Investigation on Union Guy.Nrc Conducted Insp & Need to Document Results in Insp Rept.Alleger Claims That Investigation Causing Hardships for Union Guy | |
ML20202F675 | 18 March 1998 | Forwards Reply to RI-98-A-0007,RI-97-A-0145 & RI-97-A-0282 Re Plant | |
ML20202F692 | 18 March 1998 | Requests to Be Informed If Review of Util Audit Will Be in Insp Rept | |
ML20202F719 | 2 March 1998 | Forwards Drafts to Be Used Before Replacing Originals Re SSES A-145 Colta | |
ML20202G410 | 18 February 1998 | Informs Alleger Caller That Info Requested Will Be Incorporated Into Next Insp Rept & Should Be Received by mid-March | |
ML20202G487 | 5 February 1998 | Requests Status of Updating Ltr of Alleger Caller | |
ML20202G501 | 5 February 1998 | Requests Status of Updating Ltr Re Alleger Caller | Fitness for Duty |
ML20202G629 | 16 January 1998 | Responds to 980115 Telcon with G Jones & M Urban Re Current Status of PP&L Internal Investigation | |
ML20202G590 | 11 January 1998 | Forwards Info Re Diagnostic Plant Control Operator (Pco) Interest in Radiological Waste Control Room Panel Test Computer Point | |
ML20202G608 | 9 January 1998 | Forwards Info Re Diagnostic Interest in Radiological Waste Control Room Panel Test Computer Point | |
ML20202G641 | 5 January 1998 | Informs That D Vito & C Anderson Will Be Sending Status Ltr to Alleger Caller | |
ML20202G673 | 11 December 1997 | Responds to Telcon with G Jones Discussing Delay in Completing Corporate Audit Re Allegation | |
ML20202H162 | 5 December 1997 | Partially Deleted Ltr Re Conversation with One of Two Allegers,Informing That Status Ltr Being Work on & Should Be Received by End of Month | |
ML20202G712 | 20 November 1997 | Informs That on 971105 NRC Attended Meeting with PP&L Mgt Representative from PP&L Corporate Auditing to Discuss Set of Four Related Issues Involving Operator Performance & Equipment Panel Testing | |
ML20211M567 | 3 October 1997 | Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 | |
ML20202G809 | 19 September 1997 | Forwards Status Rept on 970919 Allegations 97-A-0049 & 97-A-0145 | |
ML20202G829 | 21 August 1997 | Informs That Alleger Called in Reference to Topics Contained in RI-97-A-145 | Enforcement Discretion |
ML20202G857 | 30 July 1997 | Responds to Monthly Allegation Status Meeting | |
ML20202H194 | 17 July 1997 | Partially Deleted Ltr Re Followup Calls on 970624 | |
ML20149D785 | 14 July 1997 | Notification of Significant Licensee Meeting W/Util on 970731 in Arlington,Tx to Discuss Case Studies (Response Time & Reactor Feedwater Pump Trip Test) & Common Themes | |
ML20202H245 | 25 June 1997 | Partially Deleted Ltr Re Summary of Info Provided by Allegers | |
ML20202H073 | 25 June 1997 | Forwards Current PP&L Corporate Auditing Investigation Re Several Ongoing Investigations at SSES Site | |
ML20202H078 | 20 June 1997 | Informs That Fewell Spoke to Two Individuals & Conversation Being Documented & Placed on an Allegation Receipt Form | Fire Watch |
ML20148F720 | 30 May 1997 | Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs | Safe Shutdown Fire Barrier Exemption Request Fire Protection Program |
ML20137C920 | 20 March 1997 | Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement | Unanalyzed Condition |
ML20134P593 | 21 February 1997 | Forwards Order Imposing Civil Monetary Penalty for Transmittal to Ofc of Fr for Publication.W/O Encl | |
ML20132F542 | 19 December 1996 | Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11 | Coast down |
ML20135F694 | 27 November 1996 | Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Decision of Atomic Safety & Licensing Board Terminating Proceedings in Docket Has Expired.W/Certificate of Svc.Served on 961127 | |
ML20136A681 | 25 November 1996 | Partially Withheld Memo Re Director Decision 96-18 Re Petition Filed by P Blanch on 940413 | |
ML20129K256 | 5 November 1996 | Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness | |
ML20134E919 | 29 October 1996 | Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps | |
ML20128L776 | 10 October 1996 | Notification of 961023 Meeting W/Wppss,Energy Facility Site Evaluation Council & State & Local Govt Agencies in Elma,Wa to Discuss Proposed Termination of CP & OL Application for Plant | |
ML20203B989 | 20 November 1995 | Discusses OI Rept 4-95-032 Re Alleged False Statements by Fire Watches to NRC Inspectors.Oe Will Consider Matter Closed from Enforcement Perspective Unless Different View Received within 3 Wks of Date of This Memo | Fire Watch |
ML20211M623 | 30 November 1994 | Provides Info to Commission on Status of Rulemaking Activities Re Power Reactor Decommissioning Cost Issues,Per 930714 SRM | |
ML20236L563 | 10 August 1994 | Responds to Former Region V 930422 Request for NRR Evaluation of WPPSS Practices Associated W/Testing RHR Sys While Aligned in SPC Mode | |
ML20059M660 | 15 November 1993 | Forwards Revised Task Action Plan for Evaluation of Loss of SFP Cooling Events & Estimate of Staff Resources Required to Complete Action Plan Tasks | Ultimate heat sink |
ML20056E514 | 12 August 1993 | Submits SALP Schedule for FY94 Per Mgt Directive 8.6 | |
ML20056E457 | 5 August 1993 | Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant | |
ML20058C281 | 26 October 1990 | Summary of 901018 Meeting W/Util Re Potential Restart of Units 1 &/Or 3 | |
ML20058P502 | 15 August 1990 | Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program | |
ML20127B519 | 3 July 1990 | Clarifies Region I Ofc View of Allegation RI-89-A-0072, Adjustment of Molded Case Circuit Breakers (MCCB) at Susquehanna | Safe Shutdown Backfit Locktite |
ML20055C352 | 26 February 1990 | Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility | |
ML20248E939 | 29 September 1989 | Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed | |
ML20248C831 | 20 September 1989 | Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action | |
ML20247H926 | 9 September 1989 | Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 | Systematic Assessment of Licensee Performance |