Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217A98130 October 1999Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites
ML20211H44427 August 1999Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues
ML20211E14923 August 1999Notification of Licensee Meeting with Util on 990830 to Discuss Recent Refueling Maint Outage
ML20210S63713 August 1999Informs That Attached Info Transmitted by Facsimile on 990813 to P Duke of Pse&G to Facilitate Upcoming Conference Call in Order to Clarify Licensee Submittal ,which Provided Response to GL 98-04Coatings
ML20210P0145 August 1999Forwards Licensee Response to Facility Design & Operation for NRC Staff Questions Re Individual Operator Exam Appeals
ML20210F69827 July 1999Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts
ML20209G24214 July 1999Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group
ML20209G67214 July 1999Forwards Draft Request for Addl Info Re Inservice Insp - Second 10 Yr Interval
ML20209F61112 July 1999Revised Notification of 990805 Meeting with Util to Discuss Radiation Protection Issues Identified in NRC Insps Repts 50-458/98-10 & 50-458/99-04
ML20209D8277 July 1999Notification of 990719 Licensee Meeting in Arlington,Tx to Discuss Failed Fuel Recovery Project
ML20196H84928 June 1999Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999
ML20196G03224 June 1999Notification of 990726 Meeting with Util to Discuss Radiation Protection Issues
ML20196C50521 June 1999Informs That Attached Draft Request for Addl Info Transmitted by Facimile on 990617 to G Salamon of Pse&G. Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAIEarthquake
ML20195F88110 June 1999Notification of 990622 Meeting with Util in Rockville,Md to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation
ML20207E9232 June 1999Notification of 990611 Meeting with EOI in Rockville, Maryland to Be Briefed by EOI & to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation
ML20207G3762 June 1999Revised Notification of 990611 Meeting with EOI in Rockville,Maryland to Discuss Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation.Meeting Cancelled
ML20210F70230 April 1999Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A
DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action20 April 1999Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action
ML20205R88720 April 1999Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites
ML20205P48615 April 1999Forwards NRC Operator Licensing Exam Rept 50-354/98-03OL, (Including Completed & Graded Tests) for Tests Administered on 980223-0304
ML20205Q95215 April 1999Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980223-0304
ML20205N7109 April 1999Forwards Info Which Was Transmitted by Facsimile on 990409 to C Manges of Pse&G,To Facilitate Conference Call in Order to Clarify Licensees Submittal ,which Provided Addl Info Re Relief Request for First 10-year ISI for Plant
ML20196K9476 April 1999Notification of Significant Licensee Meeting with Util on 990420 to Discuss Results of Most Recent NRC Plant Performance Review
ML20205F98131 March 1999Informs That Encl RAI Was Transmitted by Facsimile on 990331 to G Salamon of Public Svs Electric & Gas Co.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI
IR 05000458/199930129 March 1999Forwards NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222-0303Shutdown Margin
High Radiation Area
Half scram
Grab sample
Offsite Dose Calculation Manual
Time to boil
Met Tower
Job Performance Measure
Scram Discharge Volume
ML20205C44829 March 1999Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990222-0303Safe Shutdown
Shutdown Margin
High Radiation Area
Half scram
Grab sample
Offsite Dose Calculation Manual
Time to boil
Met Tower
Job Performance Measure
Scram Discharge Volume
ML20207K91611 March 1999Notification of Significant Licensee Meeting with Util on 990325 to Discuss River Bend Station Engineering Program & Performance with Project,Maintenance & Engineering Branch Personnel
ML20207K3948 March 1999Notification of Significant Licensee Meeting 99-13 with Util on 990322 in King of Prussia,Pa to Review Util & NRC Assessments Re Dec 1998 Licensed Operator Exam,Including Applicant Performance & Quality of Util Proposed Exam
ML20203F54312 February 1999Notification of 990225 Meeting with Public Service Electric & Gas Co & Asea Brown Boveri in Rockville,Md to Discuss Fuel Design Changes for Hope Creek Generating Station
ML20199L05121 January 1999Notification of 990222 Meeting with Util in Rockville,Md for Ucs to Present Addl Info & Clarify Issues Raised in Two 10CFR2.206 Petitions Re River Bend Station & Perry Nuclear Power Plant
ML20198S3286 January 1999Informs That on 981218 & 22 Telcons,J Ondish & J Priest Discussed Encl Info with R Ennis.Info Clarifies Pse&G License Change Request LCR H98-03,dtd 980625 Which Requested in Part to Revise TS 4.4.2.1.b
ML20196H1443 December 1998Forwards Info from J Priets of Public Service Electric & Gas to R Ennis,Nrc Hope Creek Project Manager,Transmitted to Facilitate NRC Review of License Change Request Associated with Facility Filtration,Recirculation & Ventilation Sys
ML20196A63825 November 1998Notification of 981207 Meeting with Util in Rockville,Md to Discuss Proposed License Change Request Re Filtration, Recirculation & Ventilation Sys for Plant
ML20195G11217 November 1998Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1
ML20195F16912 November 1998Notification of 981123 Meeting with Entergy Operations,Inc in Arlington,Tx to Discuss Apparent Inoperability of Divs I & II Emergency DGs
ML20151U7978 September 1998Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan
ML20153H6678 September 1998Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929
ML20151T6143 September 1998Notification of Licensee Meeting W/Util on 980910 in Arlington,Tx to Discuss Plant Performance W/Regional Administrator & Division Directors
ML20238F58628 August 1998Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages
ML20237A28112 August 1998Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites
ML20236S33720 July 1998Notification of 980804 Meeting W/Util in Rockville,Md to Discuss Technical Issues Associated W/Pse&G Proposed License Change Request Re Ush for PlantUltimate heat sink
ML20236Q93713 July 1998Notification of Licensee Meeting W/Entergy Operations,Inc on 980729 in Arlington,Tx to Discuss Results of Plant Fire Protection Functional Insp
ML20249C13417 June 1998Notification of Significant Licensee Meeting 98-59 W/Util on 980629 in King of Prussia,Pa to Discuss Licensed Operator Initial Training Program & Performance Problems at Plant for February 1998 Initial Exam
ML20249A21011 June 1998Notification of 980702 Meeting W/Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan for Site
ML20248M0379 June 1998Notification of 980624 Meeting W/Util in Rockville,Md to Discuss Technical Issues Associated W/Pse&G Proposed License Change Request Related to Filtration,Recirculation & Ventilation Sys for Hope Creek Generating Station
ML20248M1968 June 1998Notification of Significant Licensee Meeting W/Util on 980626 in Arlington,Tx Re Predecisional EC to Discuss Apparent Violation of 10CFR50.9
ML20216D63513 April 1998Notification of 980416 Meeting W/Util in Rockville,Md to Discuss Entergy Operations,Inc Initial Proposal to Standardize Security Plans for Listed Plants
ML20217E84726 March 1998Notification of Significant Licensee Meeting W/Util on 980402 to Discuss Entergy Operations,Inc Annual Performance Assessment
ML20216B13910 March 1998Notification of Significant Licensee Meeting W/Util on 980324 to Consider Licensee Assessment of Performance Since Feb 1997 & to Discuss Design Basis of Standby Gas Treatment Sys & Effect on Operator Access to Reactor Bldg
ML20197B8725 March 1998Notification of 980401 Meeting W/Util in Jackson,Ms to Discuss Licensing Issues & Regulatory Performance Efficiencies W/Licensing Staff for Plants.Meeting Agenda Encl