Issue date | Title | Topic | |
---|---|---|---|
PLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl | 22 October 1999 | Forwards Change J to SSES Security Training & Qualification Plan.Without Encl | |
ML20217K283 | 14 October 1999 | Submits Response to NRC Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, for Fiscal Yrs 2000 & 2001 | |
ML20217H321 | 8 October 1999 | Forwards Changed Pages for Issue 5,rev 1 of Nine Mile Point Station Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p).Without Encls | |
ML20216J931 | 30 September 1999 | Forwards Response to NRC 981119 Suppl RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions | Hydrostatic |
ML18040A370 | 30 September 1999 | Provides Changes to Application for Amend Re Volumes 1-11 of 981016 Submittal & Discard & Insertion Instructions Re Integration of Proposed Changes,In Response to NRC RAIs | Post Accident Monitoring Scram Discharge Volume Fuel cladding |
ML20217D521 | 30 September 1999 | Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule | |
ML20216J398 | 29 September 1999 | Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity | |
ML20212H640 | 24 September 1999 | Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl | |
ML20212E980 | 23 September 1999 | Submits Info in Response to Request for Estimated Initial Operator Licensing Exam Needs,Per Administrative Ltr 99-03 | Generic Fundamentals Examination |
ML20212E794 | 22 September 1999 | Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS | |
ML20212E808 | 22 September 1999 | Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 | |
ML20212F548 | 20 September 1999 | Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 | Generic Fundamentals Examination |
ML20212F899 | 17 September 1999 | Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed | Safe Shutdown Fire Barrier |
ML20216F710 | 17 September 1999 | Forwards Response to NRC 990806 RAI Re USI A-46,verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors.Nrc Is Informed That Actions Required for Resolution of USI A-46 Have Been Completed | |
05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl | 16 September 1999 | Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl | |
ML20212D898 | 14 September 1999 | Forwards ISI Summary Rept for Refueling Outage 15 & Flaw Indication Repts.Supporting Info Repts & Calculations, Encl | |
ML20211P577 | 10 September 1999 | Forwards Application for Amends to Licenses DPR-63 & NPF-69, to Transfer Licenses to Amergen Energy Co,Llc.Ts Pages & Proprietary Addendum,Included.Proprietary Encl Withheld | |
ML20212B258 | 10 September 1999 | Requests That Name of Bm Bordenick Be Removed from Nine Mile Point,Units 1 & 2 Service List | |
ML20212A009 | 9 September 1999 | Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment | |
ML18040B295 | 8 September 1999 | Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment Annual Radiological Environmental Operating Report Weak link Operability Assessment |
ML20212A134 | 7 September 1999 | Forwards Summary Rept Secondary Containment Leakage Testing, Dtd June 1999 for Nine Mile Point,Unit 1,IAW TS 6.9.3.f | |
ML20211L922 | 1 September 1999 | Confirms That Licensee Will Retain Weld 32-WD-050 as IGSCC Category F Until Completion of Reinspection Program,In Response to NRC | |
ML20211K814 | 1 September 1999 | Forwards Reactor Containment Bldg Ilrt,Iaw Plant TS 6.9.3.e.Testing Confirmed That TS 3.3.3/4.3.3 & 6.16 Primary Containment Leakage Requirements Were Satisfactorily Met | |
05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed | 1 September 1999 | Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed | |
ML20211K300 | 30 August 1999 | Forwards Semi-Annual Radioactive Effluent Release Rept for 990101-990630 & Revised ODCM, for Nine Mile Point,Unit 1. Format Used for Effluent Data Is Outlined in App B of Regulatory Guide 1.21,rev 1 | Offsite Dose Calculation Manual Process Control Program |
ML20211J646 | 30 August 1999 | Forwards Response to NRC 990625 RAI Re NMPC Responses to GL 92-01,rev 1,supplement 1, Reactor Vessel Structural Integrity | |
ML20211H192 | 26 August 1999 | Forwards Application for Amend to License DPR-63,supporting Implementation of Noble Metal Chemical Addition by Raising Reactor Water Conductivity Limits in TSs 3.2.3.a,3.2.3.c.1 & 3.2.3.b | |
PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl | 24 August 1999 | Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl | |
ML20211E919 | 24 August 1999 | Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info | Fitness for Duty Contraband |
ML20211E973 | 23 August 1999 | Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) | |
ML20211D676 | 20 August 1999 | Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) | |
ML20211D773 | 20 August 1999 | Forwards Semiannual FFD Program Performance Data Rept Covering Period 990101 Through 990630 | Fitness for Duty |
ML20211B937 | 18 August 1999 | Provides Addl Info Re Application of Method a at Nmp,Unit 1 as Described in Generic Implementation Procedure,Rev 2 (GIP-2),NRC Supplemental SER 2 & Documents Ref in GIP-2 Upon Which GIP-2 Is Based | Safe Shutdown Safe Shutdown Earthquake Earthquake Backfit |
ML18040A369 | 16 August 1999 | Forwards Response to NRC 990510 RAI Pertaining to NMP Application for Amend Re Conversion of NMPNS Unit 2 Current TS to Its.Nrc Requested Info Re Several Sections,Including Section 3.6, Containment Sys. | High Radiation Area Post Accident Monitoring Hydrostatic |
ML20210R666 | 10 August 1999 | Confirms Conversation on 990721 Re Concerns of Syracuse Anti-Nuclear Effort on Status of 2.206 Petition (Filed 990524) & Upcoming NRC Performance Review Meeting on Nine Mile Point Units 1 & 2 | Unanalyzed Condition Hydrostatic |
ML20210R810 | 10 August 1999 | Forwards 1998 Annual Repts for NMP & co-tenants,including Rg&E,Energy East Corp/Nyse&G,Chg&E & Long Island Power Authority,Per 10CFR50.71(b) | |
05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint | 10 August 1999 | Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint | |
ML20210M757 | 4 August 1999 | Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response | |
ML18041A071 | 30 July 1999 | Forwards Rev 1 to NMP2-ISI-006, Second Ten Year Interval ISI Program Plan for Nine Mile Point Nuclear Power Station Unit 2. Significant Changes from Rev 0 Listed | |
ML20210J935 | 29 July 1999 | Informs That NMP Is Changing Completion Date for Replacement of Valves Having O Rings with Installed Life Greater than Eight Years.Replacement to Be Completed by 991031, During Hydrogen Monitoring Sys Maintenance Outage | |
ML20210L201 | 28 July 1999 | Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh | |
ML20211F264 | 27 July 1999 | Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls | |
05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs | 23 July 1999 | Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs | |
05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator | 23 July 1999 | Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator | |
ML20210E621 | 22 July 1999 | Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 | |
ML20216D804 | 19 July 1999 | Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 | |
ML20216D308 | 19 July 1999 | Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl | |
05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error | 12 July 1999 | Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error | Grab sample |
ML20209G371 | 12 July 1999 | Provides Final Root Cause Evaluation Re GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 1 | |
ML20209G791 | 12 July 1999 | Provides Info Requested in NRC Re 990407 Generic Fundamentals Exam Failure Causes & Corrective Actions | Generic Fundamentals Examination |