Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17229B084 | 7 April 1999 | Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. | |
ML17241A493 | 1 November 1998 | Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project). | |
ML17229A720 | 4 May 1998 | Five Yr Population Estimates for Ten Mile Area Surrounding for St Lucie Plant. | |
ML17229A677 | 27 March 1998 | Status Meeting. | |
ML17229A486 | 22 September 1997 | Status Meeting. | Boric Acid Fitness for Duty Loop seal Fire Barrier Coatings |
ML17229A452 | 14 August 1997 | Status Meeting for Units 1 & 2. | Boric Acid Fitness for Duty Loop seal Scaffolding |
ML17229A420 | 11 July 1997 | Status Meeting. | Boric Acid Fitness for Duty Loop seal Packing leak |
ML17229A390 | 17 June 1997 | Rev 0 to ER-97-010, Preliminary Waste Characterization of St Lucie Sgs. | |
ML17229A370 | 29 April 1997 | Final Analysis of Radiological Consequences of Main Steam Line Break Outside Containment for St Lucie Unit 1 Nuclear Power Plant Using NUREG-0800 Std Review Plan Section 15.1.5, App a, Rev 1 | |
ML20137K961 | 2 April 1997 | Rev 0 to JPN-PSL-SENP-95-100, Letdown Pressure Controller PIC-2201 Set Pressure Reduction | Safe Shutdown |
ML20137L016 | 2 April 1997 | Undated Rev 2 to JPN-PSL-SENP-95-101, Engineering Evaluation,Assessment of Effects on Plant Operation of Lifting LPSI Pump Discharge Header Thermal Relief Valve | |
ML20137K761 | 25 March 1997 | Maint Rule Baseline Insp Notebook | Safe Shutdown Boric Acid Stroke time Probabilistic Risk Assessment Systematic Assessment of Licensee Performance Maintenance Rule Program |
ML17229A249 | 21 February 1997 | Status Meeting. | Loop seal Coatings Scaffolding Power change |
ML17229A184 | 18 December 1996 | Rev 1 to St Lucie Unit 1 Small Break LOCA Analysis w/30% SG Tube Plugging. | Loop seal |
ML20137M212 | 17 December 1996 | Monthly Indicator Rept, Nov 1996 | Deep Dose Equivalent |
ML17229A169 | 11 December 1996 | Status Meeting on 961211. | Coatings Scaffolding Power change |
ML17229A093 | 31 October 1996 | Analysis of Odscc/Iga at Tubesheet & Tube Support Locations at St Lucie Unit 1. | |
ML20137M926 | 31 October 1996 | Monthly Indicator Rept | Maintenance Rule Program Deep Dose Equivalent |
ML17229A092 | 24 October 1996 | Steam Generator Run Time Analysis,Cycle 14, for St Lucie Unit 1 | Boric Acid Non-Destructive Examination Hydrostatic Nondestructive Examination Large early release frequency Through-Wall Leak |
ML20137K664 | 18 October 1996 | Rev 1,Self Assessment for St Lucie Npp | Past operability Foreign Material Exclusion Systematic Assessment of Licensee Performance |
ML17229A102 | 17 October 1996 | Status Meeting on 961017. | Loop seal Coatings Maintenance Rule Program Pressure Boundary Leakage Scaffolding |
ML20137N194 | 17 October 1996 | Monthly Indicator Rept, Sept 1996 | Maintenance Rule Program Deep Dose Equivalent |
ML17229A061 | 30 September 1996 | Psl Self-Assessment. | Past operability Nondestructive Examination Foreign Material Exclusion Systematic Assessment of Licensee Performance |
ML20137P440 | 13 September 1996 | Rev 31 to St Lucie Plant Radiological Emergency Plan | Fitness for Duty Finite Element Analysis Minimum staff Overexposure |
ML20137K803 | 4 September 1996 | Evaluation of Temporary Operating Configuration w/1B Main Transformer Out of Svc,For St Lucie Np,Unit 1 | |
ML20137K822 | 3 September 1996 | Evaluation of Temporary Operating Configuration w/1B Main Transformer Out of Svc,For St Lucie Np,Unit 1 | |
ML17229A179 | 27 August 1996 | Rev 0 to JPN-PSL-SEES-96-059, Engineering Evaluation of Application of Thermo-Lag to Meet Rg 1.75 Requirements. | |
ML20137L009 | 22 August 1996 | Rev 0 to JPN-PSL-SEIP-96-067, Engineering Evaluation,Impact of Past Incorrect Calibration of S/G Level Transmitters on Low S/G Level Trip Setpoints | Safe Shutdown Hydrostatic Coatings Downpower |
ML20137K945 | 22 July 1996 | Rev 0 to JPN-PSL-SEMS-96-051, Engineering Evaluation,2B Charging Pump Seal Leakage Evaluation | |
ML20137N791 | 28 June 1996 | Scoping Document for Implementation of Maint Rule for Monitoring Effectiveness of Maint on Structures | Time of Discovery Ultimate heat sink Fire Barrier Coatings Maintenance Rule Program Scaffolding Downpower |
ML20137N205 | 14 June 1996 | Monthly Indicator Rept, May 1996 | Deep Dose Equivalent |
ML20137L389 | 10 June 1996 | Rev 0 to JPN-PSL-SENS-96-039, 10CFR50.59 Safety Evaluation, Temporary Configuration for CEDMCS Cooling Sys & Encl | |
ML17228B505 | 31 May 1996 | Chapter 15 Event Review & Analysis for 30% SG Tube Plugging. | Shutdown Margin Anticipated operational occurrence |
ML20137L359 | 24 May 1996 | Rev 1 to JPN-PSL-SEIS-96-028, Safety Evaluation,Wide Range Ni Temporary Sys Alteration | |
ML20137N211 | 14 May 1996 | Monthly Indicator Rept, Apr 1996 | |
ML20137L226 | 11 May 1996 | Rev 2 to JPN-PSL-SEFJ-96-020, Safety Evaluation,Refueling Equipment Underload & Overload Settings | |
ML20137L205 | 8 May 1996 | Rev 1 to JPN-PSL-SEFJ-96-020, Engineering Evaluation, Refueling Equipment Underload & Overload Settings | |
ML20137L191 | 29 April 1996 | Rev 0 to JPN-PSL-SEFJ-96-020, Engineering Evaluation, Refueling Equipment Underload & Overload Settings | |
ML17228B478 | 18 April 1996 | Plant,Status Meeting for Units 1 & 2. | Boric Acid |
ML20137N220 | 17 April 1996 | Monthly Indicator Rept, Mar 1996 | Deep Dose Equivalent |
ML20137N343 | 29 March 1996 | Rev 0 to JPN-PSL-SEMS-96-007, 10CFR50.59 Safety Evaluation for Addition of Three Manual Isolation Valves within Rcgvs Process Vent Lines | Anchor Darling Power Operated Valves |
ML20137N238 | 19 March 1996 | Monthly Indicator Rept, Feb 1996 | Deep Dose Equivalent |
ML17228B438 | 15 March 1996 | Status Meeting for Units 1 & 2. | Boric Acid Fitness for Duty |
ML20137L346 | 5 March 1996 | Rev 3 to JPN-PSL-SEFJ-95-023, Safety Evaluation for 1995 Boraflex Blackness Testing Results | Shutdown Margin |
ML20137L055 | 22 February 1996 | Impact of Past Incorrect Calibration of SG Levels of Afas Setpoints,Rev 0. Actual Rept Number JPN-PSL-SEIP-96-068 Rev 0 | Fitness for Duty |
ML20137R317 | 15 February 1996 | Rev 0 to JPN-PSL-SENS-96-003, 10CFR50.59 Safety Evaluation for Chemical & Volume Control System Operation | |
ML17228B023 | 31 December 1995 | Plant Ref Simulator Certification Rept. | Shutdown Margin |
ML20137M416 | 21 December 1995 | Independent Assessment of Maint Rule Implementation at Plant, 951211-15 | Time of Discovery Maintenance Rule Program |
ML20137N366 | 18 December 1995 | Monthly Performance Monitoring Mgt Info Rept, Nov 1995 | |
ML20137M204 | 15 December 1995 | Rev 2 to JPN-PSL-SEFJ-95-023, Safety Evaluation for 1995 Boraflex Blackness Testing Results | Boric Acid |