 SiteCompanyQuarterTitleSignificanceInspection procedureTopic
05000445/FIN-2014004-02Comanche PeakLuminant2014Q3Inadequate Acceptance Criteria for Inservice Testing of Auxiliary Feedwater Discharge Check ValvesGreenIP 71111.22
05000400/FIN-2014007-01HarrisDuke Energy2014Q3Failure to Establish Test That Verified Interlock CapabilityGreenIP 71111.21
05000482/FIN-2014007-03Wolf CreekWolf Creek Nuclear Operating Corporation2014Q3Failure to Include the Containment Coolers in a Test ProgramGreenIP 71152, Problem Identification and Resolution (PI&R)Significance Determination Process
05000458/FIN-2014007-01River BendEntergy2014Q3Improper Sequencing of Maintenance of 4160 Vac Circuit Breakers Prior to As-Found TestsGreenIP 71111.21Significance Determination Process
05000483/FIN-2014007-04CallawayAmeren2014Q2Failure to Establish Essential Service Water Pump House Supply Fan Testing.GreenIP 71111.21Significance Determination Process
05000483/FIN-2014007-07CallawayAmeren2014Q2Failure to Adequately Account for Motor Operated Valve Unseating Torque in Torque Calculation.GreenIP 71111.21Significance Determination Process
05000259/FIN-2014003-03Browns FerryTennessee Valley Authority2014Q2Licensee-Identified ViolationGreen
05000423/FIN-2014002-01MillstoneDominion2014Q1Failure to Evaluate Test Results Outside of Acceptance Criteria For A Service Water PumpGreenIP 71111.15, Operability Determinations and Functionality AssessmentsSignificance Determination Process
05000311/FIN-2014002-04SalemPSEG2014Q1Inadequate Post-Maintenance Testing of a ChillerGreenIP 71111.19
05000528/FIN-2013009-02Palo VerdeArizona Public Service2014Q1Deficiencies in Emergency Diesel Generator Engine Room and Control Room Ventilation Air Flow Testing and EvaluationGreenIP 71111.21Significance Determination Process
05000498/FIN-2013007-02South TexasSTP Nuclear Operating Company2014Q1Improper Sequencing of Maintenance of 4160 VAC Circuit Breakers Prior to As-Found TestsGreenIP 71111.21Significance Determination Process
05000327/FIN-2014002-03SequoyahTennessee Valley Authority2014Q1Licensee-Identified ViolationGreenSignificance Determination Process
05000373/FIN-2013008-01LaSalleConstellation2013Q4Pump Test Instruments Were Not Maintained Within Required Accuracy LimitsGreenIP 71111.21
05000454/FIN-2013005-01ByronConstellation2013Q4Essential Service Water Blowdown Isolation Valves Not TestedGreenIP 71111.07, Heat Sink Performance
05000341/FIN-2013005-01FermiDTE Energy2013Q4RHR Pump Seal Cooler Testing Was Not Adequately ImplementedGreenIP 71111.07, Heat Sink Performance
05000317/FIN-2013005-02Calvert CliffsConstellation2013Q4Preconditioning of Containment Air Coolers Emergency Outlet ValvesGreenIP 71111.22Stroke time
Significance Determination Process
Maintenance Rule Program
05000387/FIN-2013005-03SusquehannaTalen Energy2013Q4Missed Technical Specification Surveillance for Secondary Containment Drawdown TestingGreenIP 71111.22Missed surveillance
05000455/FIN-2013005-06Byron2013Q4Corrosion Effects on the Unit 2 Reactor Vessel Not MonitoredGreenIP 71111.18Boric Acid
05000373/FIN-2013005-05LaSalle2013Q4Failure to Maintain a Testing Program That Ensured RCIC Components Will Perform Satisfactorily in ServiceGreenIP 71152, Problem Identification and Resolution (PI&R)Significance Determination Process
05000382/FIN-2013005-03WaterfordEntergy2013Q4Licensee-Identified ViolationGreen
05000482/FIN-2013008-12Wolf Creek2013Q3Failure to Translate Design Basis Performance Requirements into Pump Surveillance TestsGreenIP 71111.21
05000454/FIN-2013007-03Byron2013Q3Acceptance Criteria for Battery Voltage in TS Surveillance Procedure Failed to Account for Test Equipment UncertaintyGreenIP 71152, Problem Identification and Resolution (PI&R)Significance Determination Process
05000259/FIN-2013011-14Browns Ferry2013Q2Failure to Implement an Adequate Test Program for RHRSWS and EECSGreenIP 95003
05000259/FIN-2013007-01Browns Ferry2013Q2Failure to Verify the Capability of HPCI to Achieve Required Flow and Pressure within 30 Seconds Under Accident ConditionsGreenIP 71111.21Significance Determination Process
05000445/FIN-2013007-07Comanche Peak2013Q2Failure to Provide Appropriate Acceptance Criteria and Testing Procedure InstructionsGreenIP 71111.21Significance Determination Process
05000445/FIN-2013007-08Comanche Peak2013Q2Failure to Provide Appropriate Acceptance Criteria for the Safety Chill Water PumpsGreenIP 71111.21Significance Determination Process
05000387/FIN-2013003-02Susquehanna2013Q2Unacceptable Preconditioning of RPS and EOC-RPT Time Response TestGreenIP 71111.15, Operability Determinations and Functionality Assessments
05000317/FIN-2013003-01Calvert Cliffs2013Q2Failure to Establish a Test Program for DFO Check ValvesGreenIP 71111.04Probabilistic Risk Assessment
Significance Determination Process
Reasonable doubt of operability
05000266/FIN-2013002-09Point BeachNextEra Energy2013Q1Engineered Safety Feature Steam Line Pressure Dynamics Modules Discovered Outside of Technical Specification ValuesGreenIP 71153, Event Followup
05000336/FIN-2013002-01Millstone2013Q1Inadequate Post Maintenance Testing Following PORV MaintenanceGreenIP 71152, Problem Identification and Resolution (PI&R)Maintenance Rule Program
05000255/FIN-2013002-01PalisadesEntergy2013Q1Failure to Establish an Acceptable Component Cooling Water Heat Exchanger Final Test FrequencyGreenIP 71111.07, Heat Sink Performance