Finding | |
|---|---|
| Title | Inadequate Post-Maintenance Testing of a Chiller |
| Description | A self-revealing, Green NCV of 10 CFR 50, Appendix B, Criterion XI, Test Control, was identified when PSEG did not perform adequate post-maintenance testing (PMT) of the 22 chiller. The chillers cool safety-related loads in the auxiliary building during normal and emergency conditions. After failing to pump-down, corrective maintenance, and restoration, the chiller failed to pump-down again three days later. PSEG entered this in their CAP, backdated inoperability, performed a crew clock reset, and investigated the issue. The finding was more than minor since it affected the Equipment Performance attribute of the Mitigating Systems cornerstone and its objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the inadequate PMT resulted in additional inoperability and unavailability of the 22 chiller. The finding was evaluated in accordance with IMC 0609, Appendix A, and screened to Green since it was not a design or qualification deficiency, not a loss of function, and did not involve equipment or function designed to mitigate a seismic, flooding, or severe weather initiating event. The finding was determined to have a cross-cutting aspect in the area of Human Performance, Consistent Process, in that individuals use a consistent, systematic approach to make decisions. Specifically, PSEG did not use a systematic approach to make decisions regarding the proper PMT. |
| Site: | Salem |
|---|---|
| Report | IR 05000311/2014002 Section 1R19 |
| Date counted | Mar 31, 2014 (2014Q1) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | Self-revealing |
| Inspection Procedure: | IP 71111.19 |
| Inspectors (proximate) | A Ziedonis E Burket G Dentel J Schoppy P Finney R Barkley R Nimitz |
| Violation of: | 10 CFR 50 Appendix B Criterion XI |
| CCA | H.13, Consistent Process |
| INPO aspect | DM.1 |
| ' | |