RA-22-0121, Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification of | 29 June 2022 | Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification of Co | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin Reactor Vessel Water Level Grab sample Fire Barrier Tornado Missile Time to boil Post Accident Monitoring Internal Flooding Past operability Probabilistic Risk Assessment Functionality Assessment Incorporated by reference Aging Management Missed surveillance Tornado Missile Protection Surveillance Frequency Control Program Operability Determination Time Critical Operator Action Battery sizing License Renewal Power Operated Valves Turbine Missile Pressure Boundary Leakage Offsite Circuit Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Power change Unidentified leakage Power Uprate Measurement Uncertainty Recapture Overspeed trip Manual Operator Action Operational leakage |
ML20189A100 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B. Figures | |
ML20189A093 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A. Tables | Boric Acid Tornado Missile |
ML20189A080 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | Safe Shutdown Boric Acid Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Aging Management Design basis earthquake Stress corrosion cracking License Renewal Earthquake Fuel cladding Liquid penetrant Fire Protection Program Dissimilar Metal Weld Flow Induced Vibration Overspeed trip Thermal fatigue |
ML20189A092 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Mission time Tornado Missile Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Emergency Lighting FLEX B.5.b Tornado-Generated Missile Tornado Generated Missile Tornado Missile Protection License Renewal Earthquake Control of Heavy Loads Turbine Missile Fuel cladding Recently irradiated fuel Fire Protection Program Backfit Overspeed trip |
ML20189A111 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 16, Selected Licensee Commitments | |
ML20189A113 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Activities | Boric Acid Non-Destructive Examination Weld Overlay Coatings Nondestructive Examination Incorporated by reference Aging Management Flow Accelerated Corrosion Stress corrosion cracking Eddy Current Testing License Renewal EVT-1 Fire Protection Program Grace period Operational leakage Thermal fatigue |
ML20189A110 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures | |
ML20189A081 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5A, Tables | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Power change |
ML20189A104 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13A. Tables | |
ML20189A102 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 12, Appendix 12A. Tables | Boric Acid |
ML20189A105 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures | |
ML20189A103 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations | Fitness for Duty Fire impairment Cyber Security Stress corrosion cracking Safeguards Contingency Plan Earthquake Maintenance Rule Program Cyber attack |
ML20189A099 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11A. Tables | Annual Radioactive Effluent Release Report |
ML20189A098 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Boric Acid High Radiation Area Grab sample Tornado Missile Hydrostatic Operating Basis Earthquake Process Control Program Earthquake Pressure Boundary Leakage |
ML20189A069 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1A, Tables | |
ML20189A094 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B. Figures, (Redacted Version) | |
ML20189A088 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 7, Appendix 7B, Figures | |
ML20189A106 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation | Shutdown Margin |
ML20189A087 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 7, Appendix 7A, Tables | |
ML20189A083 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards | Safe Shutdown Boric Acid Shutdown Margin Safe Shutdown Earthquake Coatings Condition Adverse to Quality B.5.b Foreign Material Exclusion Eddy Current Testing Earthquake Liquid penetrant Recently irradiated fuel Scaffolding GOTHIC Manual Operator Action |
ML20189A082 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5B, Figures | |
ML20189A085 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6B, Figures, (Redacted Version) | |
ML20189A084 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6A, Tables | Boric Acid Liquid penetrant |
ML20189A076 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Figures | |
ML20189A072 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Tables | Earthquake |
ML20189A091 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures | |
ML20189A068 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | Safe Shutdown Boric Acid Shutdown Margin |
ML20189A067 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Document History | |
ML20189A089 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | Safe Shutdown Emergency Lighting Early Warning Fire Detection |
ML20181A118 | 29 June 2020 | Submittal of Revision 28 to Updated Final Safety Analysis Report, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions and 10CFR50.59 Evaluation Summary Report | Safe Shutdown Boric Acid Non-Destructive Examination Fire Barrier Tornado Missile Internal Flooding Probabilistic Risk Assessment Incorporated by reference FLEX Aging Management Missed surveillance Tornado Missile Protection Surveillance Frequency Control Program Open Phase Condition Local Leak Rate Testing Time Critical Operator Action Battery sizing License Renewal Earthquake Turbine Missile Fuel cladding Preliminary White Finding Offsite Circuit Fire Protection Program Hourly Fire Watch |
ML20189A070 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1B, Figures, (Redacted Version) | |
ML20189A101 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | High Radiation Area Anticipated operational occurrence Locked High Radiation Area |
ML20189A077 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 4, Reactor | Shutdown Margin Hydrostatic Nondestructive Examination Incorporated by reference Overtravel License Renewal Earthquake Fuel cladding Liquid penetrant Flow Induced Vibration Coast down Overspeed trip Thermal fatigue |
ML20189A074 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems | Safe Shutdown Boric Acid High winds Shutdown Margin Tornado Missile Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Operating Basis Earthquake Nondestructive Examination Finite Element Analysis FLEX Tornado-Generated Missile Tornado Generated Missile Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation License Renewal Earthquake Control of Heavy Loads Turbine Missile Backfit Power change Flow Induced Vibration Overspeed trip Thermal fatigue |
ML20189A075 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Tables | Safe Shutdown Boric Acid Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Design basis earthquake Earthquake |
ML20189A108 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses | Boric Acid Shutdown Margin Loop seal Stroke time Anticipated operational occurrence Fuel cladding Coast down Overspeed trip Manual Operator Action Loss of condenser vacuum |
ML20189A086 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Mission time Post Accident Monitoring Emergency Lighting Operability Determination Commercial Grade Power change |
ML20189A073 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures | Earthquake |
ML20189A109 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15A. Tables | Coast down |
ML20189A095 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Safe Shutdown Loop seal Mission time Anticipated operational occurrence Tornado Missile B.5.b Design basis earthquake Stress corrosion cracking Earthquake Overspeed trip Manual Operator Action Loss of condenser vacuum |
ML20189A112 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance | Incorporated by reference |
ML20189A097 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B. Figures | |
ML20189A096 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10A, Tables | |
ML20189A107 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 14, Appendix 14A, Tables | Hydrostatic |
ML20189A079 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4B, Figures | |
ML20189A090 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8A, Tables | |
ML20189A078 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4A, Tables | Shutdown Margin |
ML20189A071 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics | Hydrostatic Earthquake |
RA-20-0136, 8 to Updated Final Safety Analysis Report, Chapter 18, Appendix 18A. Tables | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 18, Appendix 18A. Tables | Boric Acid Coatings Aging Management Flow Accelerated Corrosion Control of Heavy Loads Fire Protection Program Thermal fatigue |