Issue date | Title | Topic | |
---|---|---|---|
ML23320A112 | 18 January 2024 | NRC to Fws, Concurrence with Endangered Species Act Determinations for North Anna Power Station, Units 1 and 2, Subsequent License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment | License Renewal Subsequent License Renewal |
ML24009A111 | 9 January 2024 | NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169) | Ultimate heat sink |
ML23355A272 | 21 December 2023 | NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request | |
ML23354A203 | 18 December 2023 | Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 | Process Control Program |
ML23349A027 | 15 December 2023 | Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 5.5.2 | |
ML23318A117 | 13 November 2023 | NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) | High winds Earthquake |
ML23284A332 | 11 October 2023 | Request for Additional Information Alternative Request (RA-22-0174) (L-2022-LLR-0060) | Non-Destructive Examination |
ML23270B836 | 26 September 2023 | Code Case N-752 Audit September 26, 2023, E-mail Providing Additional Information Regarding the Use of Owner'S Requirements and Engineering Judgment in Lieu of Code and Standards | Nondestructive Examination Aging Management License Renewal Operational leakage |
ML23267A003 | 21 September 2023 | RP Inspection Document Request | |
ML23257A209 | 14 September 2023 | NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR | FLEX |
ML23264A014 | 14 September 2023 | NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR | |
ML23249A208 | 6 September 2023 | NRR E-mail Capture - Change in Estimated Review Schedule and Level of Effort for Hatch 'Revise TS Table 1.1-1 (Modes)' LAR (L-2022-LLA-0120) | |
ML23243A986 | 31 August 2023 | NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) | FLEX |
ML23269A041 | 22 August 2023 | Code Case N-752 Audit; August 22, 2023, E-mail Providing Additional Information Regarding Design and Quality Program Requirements | Aging Management Flow Accelerated Corrosion License Renewal |
ML23223A014 | 10 August 2023 | NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers | Exemption Request |
ML23219A160 | 7 August 2023 | 003 Radiation Safety Baseline Inspection Information Request | Process Control Program |
ML23198A155 | 17 July 2023 | NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 | |
ML23171B052 | 20 June 2023 | NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) | |
ML23172A013 | 20 June 2023 | Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies | Surveillance Frequency Control Program |
ML23153A189 | 2 June 2023 | Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies | Surveillance Frequency Control Program |
ML23151A348 | 30 May 2023 | Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | Incorporated by reference |
ML23144A086 | 24 May 2023 | Acceptance of Requested Licensing Action Proposed Relief Request (RA-23-0018) to Use ASME Code Case 853 | Stress corrosion cracking |
ML23142A273 | 22 May 2023 | Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | Incorporated by reference |
ML23135A092 | 11 May 2023 | NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016) | Incorporated by reference |
ML23125A145 | 5 May 2023 | Change in Estimated Review Schedule and Level of Effort for Proposed Alternative to Use Code Case N-752 | |
ML23124A121 | 4 May 2023 | Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | |
ML23095A005 | 4 April 2023 | 002 Radiation Safety Baseline Inspection Information Request | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML23086C036 | 27 March 2023 | Request for Additional Information Steam Generator Tube Inspection Report (03R31) | |
ML23075A023 | 15 March 2023 | NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 | Earthquake |
ML23073A025 | 13 March 2023 | NRR E-mail Capture - Fyi - Closeout the Evacuation Time Estimate (ETE) Reviews for SNC Fleet | |
ML23073A228 | 13 March 2023 | Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review | |
ML23067A216 | 7 March 2023 | NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code | |
ML23065A092 | 5 March 2023 | NRR E-mail Capture - Revised Estimate Hours and Completion Date - Hatch RPV Head Closure Bolts LAR (L-2022-LLA-0120) | |
ML23060A093 | 1 March 2023 | NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR | |
ML23059A228 | 28 February 2023 | NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) | Earthquake |
ML23058A056 | 27 February 2023 | Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation | Surveillance Frequency Control Program Operational leakage |
ML23048A151 | 16 February 2023 | Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) | |
ML23039A171 | 8 February 2023 | NRR E-mail Capture - Acceptance Review for Technical Support Center (TSC) Relocation (L-2023-LLA-0006) | |
ML23038A183 | 7 February 2023 | Request for Additional Information Alternative Request (RA-22-0174) to Use ASME Code Case N-752 | |
ML23033A095 | 2 February 2023 | NRR E-mail Capture - (External_Sender) Re for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs | |
ML23033A028 | 30 January 2023 | NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR | |
ML23026A013 | 19 January 2023 | NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR | |
ML23018A187 | 17 January 2023 | 2023 HNP CGD Inspection Information Request | Commercial Grade Dedication |
ML23018A035 | 17 January 2023 | NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) | |
ML23031A155 | 17 January 2023 | 1/17/2023 Email from John Moses, Deputy Director, Division of Rulemaking, Environmental, and Financial Support, to Diane Curran, Counsel to Beyond Nuclear and the Sierra Club, Request for Extension of Scoping Comment Period for Oconee EIS | |
ML23006A066 | 5 January 2023 | NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise NFPA-805 License Amendment Request | Fire Protection Program |
ML22355A208 | 21 December 2022 | NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel 'Rpv Head Studs' LAR | Incorporated by reference |
ML23006A025 | 13 December 2022 | NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - TSTF-208 License Amendment Request | |
ML22342B147 | 8 December 2022 | NRR E-mail Capture - Acceptance Review for LAR Re NAPS Post LOCA Buffer Change (L-2022-LLA-0162) | |
ML22341A121 | 6 December 2022 | NRR E-mail Capture - Recap of Takeaways from Hatch Audit on Dec 1, 2022 |