Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20108F530 | 20 March 2020 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0129, Rev. 0, Test Stand Deficiency - EMD Fuel Injectors P/N H40084720 | |
ML20024E255 | 9 January 2020 | Engine Systems, Inc., Submittal of Selenium Surge Suppressor, Emo P/N 8403049 | Dedication package |
ML19347A426 | 10 December 2019 | General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) | Post Accident Monitoring |
ML19317D093 | 25 October 2019 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing | |
ML19199A034 | 5 July 2019 | Lake Engineering Co., Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518 | |
ML19190A044 | 7 June 2019 | 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 | Overspeed trip Overspeed |
ML19168A012 | 31 May 2019 | Paragon Energy Solution LLC-10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners | |
ML19168A010 | 31 May 2019 | Curtis-Wright Nuclear Division- Notification Report for Potential Part 21 Update | |
ML19077A096 | 5 March 2019 | Interim Notification Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518 | |
ML17243A136 | 28 August 2017 | Fisher Information Notice, (FIN) 2017-04 - Erroneous Rotary Seating Torque Calculation in Flowscanner Software | |
ML17223A200 | 9 August 2017 | 10 CFR Written Notification for Hex Head Cap Screws Nova Machine Products Part Numbers: BPRT.008227.30, BPRT.008468.30, and BPRT.008342.30 | Non-Destructive Examination |
ML17179A378 | 7 June 2017 | TE Connectivity - Part 21 Transfer of Information TE-023 | |
ML17114A071 | 13 April 2017 | 10 CFR Part 21 Notification of Deviation - Gkt Relay | |
ML17114A070 | 13 April 2017 | Part 21 Notification - Identified Fisher 546S Electro-Pneumatic Transducers Standard Mounting Brackets Failed Seismic Testing Standards | |
ML17104A288 | 13 April 2017 | Emerson Process Management, LLC - Fisher Information Notice, (FIN) 2017-02 | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
ML16321A451 | 21 October 2016 | Part 21 Reporting of Defects and Noncompliance | Commercial Grade |
ML16251A098 | 2 September 2016 | Part 21 - Potential Failure of Battery System Connections | |
ML16243A472 | 25 August 2016 | Part 21 Reporting of Defects and Noncompliance | Commercial Grade |
ML16139A834 | 10 May 2016 | Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 | Commercial Grade |
ML16039A269 | 3 February 2016 | Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna | |
ML15103A244 | 6 April 2015 | Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring | Commercial Grade Dedication |
ML15022A650 | 20 January 2015 | Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification | |
ML14274A052 | 22 September 2014 | Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities | |
ML14105A018 | 11 April 2014 | Part 21 - Model 1154HP Transmitters with Integral 1159 Remote Diaphragm Seals May Exhibit Degraded Functional Reliability | |
ML14094A445 | 1 April 2014 | Notification of Part 21 Report on Defective Raw Material Used to Manufacture Valve Stems | |
ML14069A468 | 2 March 2014 | Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems | |
ML14042A202 | 5 February 2014 | Part 21 Report Regarding Unqualified Material Used in Electrical Penetration Assemblies | Stress corrosion cracking |
ML13277A010 | 23 September 2013 | Interim Report Update for Component ASME Material Supplied by Mirion Technologies (Conax Nuclear), Inc. (Mtcn), as Part of Containment Electric Penetration Assemblies (EPA) | Stress corrosion cracking |
ML13246A084 | 23 August 2013 | Notification of Potential Defect & Interim Report Regarding a Potential Defect of Materials Supplied to Operating Us Nuclear Power Plants by Mirion Technologies (Conax Nuclear) Inc. (Mtcn) with Containment Electric Penetration Assemblies | |
ML13238A253 | 21 August 2013 | Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders | |
ML13165A342 | 12 June 2013 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML13142A329 | 6 May 2013 | Notification of Potential Part 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0109, Rev. 0 | |
ML13127A014 | 3 May 2013 | Part 21 Report - Fuel Injectors Failed Pressure Test | |
ML13093A153 | 2 April 2013 | Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective Tie Wraps and Holders | |
ML13073A107 | 12 March 2013 | Notification of Potential Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems | |
ML13064A012 | 25 February 2013 | Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve | Anchor Darling |
ML13002A470 | 28 December 2012 | 10 C.F.R. Part 21 Notification to Customers - COM-5 and SSC-T Protective Relays - Telephone Relay Armature Pivot Pin, Resubmitted to Include Attachment 1, Which Was Inadvertently Omitted in the Original Fax | |
ML13002A030 | 21 December 2012 | Part 21 Notification - Defect Discoveredd in COM-5 and SSC-T Protective Relays Distributed by Abb, Inc | |
ML12352A123 | 13 December 2012 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML12348A136 | 13 December 2012 | Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers | |
ML12094A371 | 2 April 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML12066A118 | 2 March 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML12097A316 | 2 March 2012 | Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition | |
ML12058A141 | 23 February 2012 | Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations | |
ML091490488 | 28 May 2009 | Notification of Potential Part 21 Report Re Air Circuit Breaker Deficiency | |
ML090400748 | 5 February 2009 | Update to Part 21 Report Notification, Texas Instruments Operational Amplifier, P/N: OPA 2111 | |
ML082390106 | 25 August 2008 | Notification of Potential Part 21 on Failure of F and G Switches | Test box |
ML080990634 | 4 April 2008 | Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade Items | Commercial Grade |