Semantic search

Jump to navigation Jump to search
 SiteStart dateTitleTopic
ML24036A2785 February 2024SRM-M240125: Joint Meeting of the Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC)
ML23286A2782 February 2024Watermarked - DG-5075 - Cyber Security 10-13-23Ultimate heat sink
Anticipated operational occurrence
Cyber Security
Power change
Cyber attack
ML24019A13119 January 2024M240125: Staff Slides - Joint Meeting of the Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) (Part 1)
ML24019A13319 January 2024M240125: Agenda - Joint Meeting of the Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) (Part 1)
ML23346A222Farley22 December 2023Transmittal of Dam Inspection Report - Public
NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point StationNine Mile Point
07201036
14 December 2023Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point StationSafe Shutdown
Health Physics Network
Grab sample
Offsite Dose Calculation Manual
Emergency Lighting
Severe Accident Management Guideline
Minimum staff
Scaffolding
Siren
Overexposure
ML23333A087Comanche Peak13 December 2023Transmittal of Dam Safety Inspection Report - PublicSafe Shutdown
ML23338A2454 December 2023Annual Policy Letter Notification of Initial Reciprocity Filing of NRC Form 241 Requirement for Calendar Year 2024High winds
Stolen
Backfit
ML23335A0231 December 2023Office of the Inspector General, U.S. Nuclear Regulatory Commission, Defense Nuclear Facilities Safety Board Semiannual Report to Congress - April 1, 2023 Through September 30, 2023Safe Shutdown
Exemption Request
Nuclear Energy Innovation and Modernization Act
Pandemic
Coronavirus
COVID-19
Stolen
ML23243A935Indian Point30 November 2023Enclosure 1: Issuance IP LAR for Unit 2s Renewed Facility Licenses and PDTSs to Reflect Permanent Removal of Spent Fuel from SFPsHigh Radiation Area
Preemption Authority
License Renewal
ML23342A12729 November 202310 CFR 2.206 Petition - OEDO-23-00103 - Spent Fuel Pool Density in Extended LOOP - E-mail Closure Letter to Petitioner - 11-29-2023Ultimate heat sink
FLEX
Earthquake
ML23284A17129 November 2023OEDO-23-00103 - Closure Letter - 2.206 Petition for Spent Fuel Transfer to Dry StorageUltimate heat sink
FLEX
Earthquake
ML23100A117Indian Point17 November 2023NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License ConditionCyber Security
Preemption Authority
ML22307A045Indian Point17 November 2023Enclosure 1 - Amendment No. 297 to Rfl No. DPR-26 for Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements with Spent Fuel Transfer to Dry StorageHigh Radiation Area
Offsite Dose Calculation Manual
License Renewal
ML23317A227Mcguire
McGuire
17 November 2023William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary
ML23291A080Zion16 November 2023Issuance of Conforming Amendments Regarding Direct Transfer of DPR-39 and DPR-48 Facility Operating Licenses from Zionsolutions, LLC to Constellation Energy Generation LLC
L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock PointPalisades
Indian Point
Pilgrim
Big Rock Point
13 November 2023Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point
ML23304A3180520005031 October 2023LLC, Revision 1 to Standard Design Approval Application, Part 2, Chapter 1, Introduction and General Description of the PlantSafe Shutdown
Boric Acid
Fitness for Duty
Shutdown Margin
Ultimate heat sink
Non-Destructive Examination
Offsite Dose Calculation Manual
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Multiple Spurious Operation
Incorporated by reference
FLEX
Process Control Program
Severe Accident Management Guideline
Earthquake
Fire Protection Program
ML23292A248Perry19 October 2023Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared BatLicense Renewal
ML23276B45619 October 2023Research Information Letter 2023-05, Proceedings the Eighth Annual Proceedings of the Eighth Annual Probabilistic Flood Hazard Assessment Research WorkshopSafe Shutdown
High winds
Ultimate heat sink
Mission time
Enforcement Discretion
Probabilistic Risk Assessment
FLEX
Job Performance Measure
Large early release frequency
Earthquake
Machine learning
ML23318A208Diablo Canyon13 September 2023Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations, July I, 2022 - June 30, 2023 - Volume 2 (Exhibits)Safe Shutdown
Boric Acid
Fitness for Duty
Packing leak
Ultimate heat sink
Mission time
Offsite Dose Calculation Manual
Commercial Grade Dedication
Weld Overlay
Contraband
Enforcement Discretion
Probabilistic Risk Assessment
Coatings
Cyber Security
FLEX
B.5.b
Aging Management
Fukushima Dai-Ichi
Significance Determination Process
Annual Radioactive Effluent Release Report
Design basis earthquake
Foreign Material Exclusion
Annual Radiological Environmental Operating Report
Operability Determination
License Renewal
Exemption Request
Subsequent License Renewal
Earthquake
Maintenance Rule Program
Pandemic
Coronavirus
Chernobyl
COVID-19
Through-Wall Leak
Fire Protection Program
Scaffolding
Grace period
Backfit
Power change
Fatality
Operability Assessment
Siren
ML23208A17812 September 2023Status and Closeout of Recommendation 4; Office of the Inspector Generals Audit OIG-21-A-14
LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust AgreementPeach Bottom
Salem
Hope Creek
8 September 2023and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement
ML23211A001Hermes7 September 2023Enclosure - Consideration of New Information Regarding Kairos Hermes 2 on the Cumulative Impacts for Kairos Hermes Test ReactorEnvironmental Justice
ML23233A15921 August 2023OIG-23-A-09 Audit of the U.S. Nuclear Regulatory Commission'S Voluntary Leave Transfer Program, Dated August 21, 2023Coronavirus
COVID-19
NUREG-2191, Dfc, Vol 2, Rev 1, Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, Draft Report for Comment, Tracked Changes Version31 July 2023NUREG-2191 Dfc, Vol 2, Rev 1, Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, Draft Report for Comment, Tracked Changes VersionSafe Shutdown
Boric Acid
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Zebra Mussel
Incorporated by reference
Condition Adverse to Quality
Aging Management
Foreign Material Exclusion
Moisture barrier
License Renewal
Subsequent License Renewal
Earthquake
Control of Heavy Loads
Biofouling
EVT-1
Liquid penetrant
Pressure Boundary Leakage
Pressure boundary leak
Through-Wall Leak
Through-Wall Leakage
Fire Protection Program
Dissimilar Metal Weld
Scaffolding
Grace period
Power Uprate
ML23202A06721 July 2023NRR E-mail Capture - 2.206 Petition Initial Assessment - Transfer Spent Fuel to Dry Storage (OEDO-23-00103, L-2023-CRS-0000)Ultimate heat sink
FLEX
Earthquake
ML23191A537North Anna10 July 2023Fws to NRC, Federal Agency Coordination Under the Endangered Species Act, Section 7 for 'North Anna Power Station, Units 1 and 2, Subsequent License Renewal' and Concurrence with Nlaa Determination for Nleb
ML23192A023Diablo Canyon3 July 20237-3-23 Petitioners Excerpts of Record Volume 2 (9th Cir.)(Case No. 23-852)Safe Shutdown
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Nondestructive Examination
Incorporated by reference
Aging Management
Design basis earthquake
License Renewal
Exemption Request
Earthquake
Nuclear Energy Innovation and Modernization Act
COVID-19
Fuel cladding
Biofouling
Generic Issues Program
Backfit
Power Uprate
Overexposure
Affidavit
ML23150A05113 June 2023Draft ISG - Use of Decommissioning Trust Fund During Operations for Major Radioactive Component DisposalDecommissioning Funding Plan
Exemption Request
ML23165A215Vogtle13 June 2023Enclosure 1: Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Revision 12Safe Shutdown
Boric Acid
Fitness for Duty
High winds
Reactor Vessel Water Level
Loop seal
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Post Accident Monitoring
Internal Flooding
Hydrostatic
Enforcement Discretion
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Squib
Cyber Security
Emergency Lighting
Incorporated by reference
Test box
Main transformer failure
Significance Determination Process
Job Performance Measure
Scram Discharge Volume
Process Control Program
Safeguards Contingency Plan
Hemyc
License Renewal
Earthquake
Control of Heavy Loads
Power-Operated Valves
Pandemic
Power Operated Valves
Chernobyl
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Fatality
Power Uprate
Failure to Scram
Depleted uranium
ML23163A1506 June 2023OIG-21-A-14 Status of Recommendations: Audit of the U.S. Nuclear Regulatory Commission'S Oversight of the Adequacy of Decommissioning Trust Funds, Dated June 6, 2023
L-23-065, Annual Financial ReportBeaver Valley
Davis Besse
Perry
22 May 2023Annual Financial Report
ML23164A15217 May 2023Transcript of Advisory Committee on Reactor Safeguards - Joint Plant Operations, Radiation Protection & Fire Protection and Digital I&C Subcommittee Meeting, May 17, 2023, Pages 1-344 (Open)Safe Shutdown
Ultimate heat sink
Enforcement Discretion
Cyber Security
Chernobyl
Power change
Machine learning
ML23146A042Trojan10 May 2023Portland General Electric Co., Submittal of Annual Financial Report for Year 2022
ML23146A043Trojan10 May 2023Portland General Electric Co., Annual Financial Report for Year 2022Pandemic
COVID-19
ML23157A101Yankee Rowe4 May 2023Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) for the Yankee Nuclear Power Station Independent Spent Fuel Storage InstallationDecommissioning Funding Plan
Decommissioning Funding Assurance Status Report
Exemption Request
ML23137A144072000113 May 2023Sacramento Municipal Utility District (Smud) - Submittal of 2022 Annual Financial ReportHigh winds
Pandemic
COVID-19
ML23137A155La Crosse2 May 2023Possession-Only License DPR-45 - Financial Statement and Auditors' Report
ML23086C067Calvert Cliffs
07200078
24 April 2023Issuance of Amendment Nos. 345 and 323 Deletion of License Conditions Related to Decommissioning TrustFire Protection Program
CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License AmendmentsBeaver Valley
Davis Besse
Perry
Comanche Peak
07201043
07200069
14 April 2023ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License AmendmentsSafe Shutdown
Probabilistic Risk Assessment
Cyber Security
Decommissioning Funding Plan
Large early release frequency
Safeguards Contingency Plan
License Renewal
Fire Protection Program