RNP-RA/03-0079, May 2003 Monthly Operating Report for H.B. Robinson, Unit 2

From kanterella
(Redirected from RNP-RA/03-0079)
Jump to navigation Jump to search
May 2003 Monthly Operating Report for H.B. Robinson, Unit 2
ML031620171
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/10/2003
From: Baucom C
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/03-0079
Download: ML031620171 (3)


Text

TS 5.6.4 by ProgressEnergy TRM 6.2 Serial: RNP-RA/03-0079 JUN 10 2003 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications Section 5.6.4, Monthly Operating Reports, and HBRSEP, Unit No. 2, Technical Requirements Manual Selction 6.2, Monthly Operating Report, Progress Energy Carolinas, Inc., also known as Carolina Power & Light Company, submits the attached report of operating statistics and shutdown experience for the month of May 2003.

If you have any questions concerning this matter, please contact me.

Sincerely, C. T. Baucom Supervisor - Licensing/Regulatory Programs CTB/jwv Attachment c: NRC Resident Inspector, HBRSEP L. A. Reyes, NRC, Region II C. P. Patel, NRC, NRR Progress Energy Carolinas, Inc.

Roblnson Nuclear Plant 3581 West Entrance Road HartswIle SC 29550

Attachment to Serial: RNP-RA/03-0079 Page 1 of 2 MONTHLY OPERATING REPORT DOCKET NO. 050-0261 UNIT H. B. ROBINSON STEAM ELECTRIC PLANT (HBRSEP), UNIT NO. 2 DATE 6/2/03 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: MAY 2003

1. DESIGN ELECTRICAL RATING (NET MWE): 765
2. MAX DEPENDABLE CAPACITY (NET MWE): 710 THIS YR TO MONTH DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR CRITICAL 744.00 3623.0 215420.99
4. HOURS GENERATOR ON LINE 744.00 3623.0 212101.26
5. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 23.20
6. NET ELEC. ENERGY GENERATED (MWH) 541560.00 2691709.00 138629167.00

Attachment to Serial: RNP-RA/03-0079 Page 2 of 2 DOCKET NO. 050-0261 UNIT NAME HBRSEP, UNIT NO. 2 DATE 6/2/03 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: MAY 2003 No. Date Type Duration Reason1 Method of Shutting Down Cause / Corrective Actions / Comments F: Forced (Hours) the Reactor or Reducing Power 2 S: Scheduled 1 2 Reason: Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation E-Operator Training & License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

The unit operated at approximately full power for the entire month. Power was reduced for approximately ten (10) hours to perform turbine valve testing.

There were no challenges to the pressurizer safety valves during the month.