Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARRA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-22-0291, Report of Changes to Emergency Plan Implementing Procedures2022-10-17017 October 2022 Report of Changes to Emergency Plan Implementing Procedures RA-20-0071, Emergency Plan Implementing Procedure RP/0/A/5700/026, Revision 019, Required Actions in the Technical Support Center (Tsc)2020-02-20020 February 2020 Emergency Plan Implementing Procedure RP/0/A/5700/026, Revision 019, Required Actions in the Technical Support Center (Tsc) MNS-18-045, Emergency Plan Implementing Procedure HP/0/B/1009/002, Revision 003, Alternative Method for Determining Dose Rate within the Reactor Building2018-07-24024 July 2018 Emergency Plan Implementing Procedure HP/0/B/1009/002, Revision 003, Alternative Method for Determining Dose Rate within the Reactor Building MNS-18-038, Revision 18-2 to Emergency Plan, and Revision 28 to Emergency Plan Implementing Procedure Ep Grp Maual 1.12018-05-22022 May 2018 Revision 18-2 to Emergency Plan, and Revision 28 to Emergency Plan Implementing Procedure Ep Grp Maual 1.1 MNS-17-039, Emergency Implementing Procedures Plan, Revision 17-12017-09-19019 September 2017 Emergency Implementing Procedures Plan, Revision 17-1 ML17235A6102017-08-0202 August 2017 Emergency Plan Implementing Procedures Index, Revision 019, TR-NUC-MC-006675 RA-17-0037, Transmittal of Emergency Plan Implementing ProceduSR/0/A/2000/003, Revision 142017-07-27027 July 2017 Transmittal of Emergency Plan Implementing ProceduSR/0/A/2000/003, Revision 14 ML17235A6122017-06-20020 June 2017 MNS EPIP Manual ML17166A1362017-06-15015 June 2017 Units 1 & 2, McGuire, Units 1 & 2, Oconee, Units 1, 2 & 3, H. B. Robinson, Unit 2 - Transmittal of Emergency Plan Implementing Procedure AD-EP-ALL-1000, Revision 2 RA-17-0031, Enclosures 1 and 2: 10CFR50.54(q) Summary and Emergency Plan Implementing Procedure AD-EP-ALL-1000, Revision 22017-06-15015 June 2017 Enclosures 1 and 2: 10CFR50.54(q) Summary and Emergency Plan Implementing Procedure AD-EP-ALL-1000, Revision 2 RA-17-003, Brunswick, Units 1 & 2, Catawba, Units 1 & 2, McGuire, Units 1 & 2, Oconee, Units 1, 2 & 3, H. B. Robinson, Unit 2 - Transmittal of Emergency Plan Implementing Procedure AD-EP-ALL-1000, Revision 22017-06-15015 June 2017 Brunswick, Units 1 & 2, Catawba, Units 1 & 2, McGuire, Units 1 & 2, Oconee, Units 1, 2 & 3, H. B. Robinson, Unit 2 - Transmittal of Emergency Plan Implementing Procedure AD-EP-ALL-1000, Revision 2 ML17124A5892017-04-17017 April 2017 Mcquire Nuclear Station - EPIP Manual - Revision 017 ML17124A5282017-04-15015 April 2017 EPIP Manual, Revision 16 ML16351A3192016-12-0707 December 2016 Revision 16-5 to Emergency Plan MNS-16-086, Emergency Plan, Revision 16-42016-12-0707 December 2016 Emergency Plan, Revision 16-4 RA-16-0038, Transmittal of Emergency Plan Implementing Procedures: SR/0/A/2000/003 Revision 10; SR/0/A/2000/004, Revision 7; AD-EP-ALL-0202, Revision 2; AD-EP-ALL-0301, Revision 1; Etqs 7111.0, Revision 10; EMG-NGGC-0004 (Deleted); EMG-NGCC-005 (Supe2016-10-12012 October 2016 Transmittal of Emergency Plan Implementing Procedures: SR/0/A/2000/003 Revision 10; SR/0/A/2000/004, Revision 7; AD-EP-ALL-0202, Revision 2; AD-EP-ALL-0301, Revision 1; Etqs 7111.0, Revision 10; EMG-NGGC-0004 (Deleted); EMG-NGCC-005 (Supers RA-16-0026, Transmittal of Emergency Plan Implementing Procedure SR/0/A/2000/003, Revision 92016-07-14014 July 2016 Transmittal of Emergency Plan Implementing Procedure SR/0/A/2000/003, Revision 9 RA-16-0009, Duke Energy - Transmittal of Emergency Plan Implementing ProceduAD-EP-ALL-0802, Revision 22016-02-15015 February 2016 Duke Energy - Transmittal of Emergency Plan Implementing ProceduAD-EP-ALL-0802, Revision 2 RA-16-0004, Duke Energy - Transmittal of Fleet Emergency Plan Implementing Procedure AD-EP-ALL-0202, Revision 1, Emergency Response Offsite Dose Assessment2016-01-0707 January 2016 Duke Energy - Transmittal of Fleet Emergency Plan Implementing Procedure AD-EP-ALL-0202, Revision 1, Emergency Response Offsite Dose Assessment RA-15-0038, Transmittal of Emergency Plan Implementing Procedure, Revision 7 to SR/0/A/2000/003, Activation of the Emergency Operations Facility2015-08-20020 August 2015 Transmittal of Emergency Plan Implementing Procedure, Revision 7 to SR/0/A/2000/003, Activation of the Emergency Operations Facility RA-15-0019, Duke Energy Carolina LLC Submits Epips, Rev 5 to SR/0/A/2000/003, Activation of the Emergency Operations Facility and Rev 4 to SR/0/A/2000/004, Notification to States and Counties from the Emergency Operations Facility for Catawba, McGuir2015-04-23023 April 2015 Duke Energy Carolina LLC Submits Epips, Rev 5 to SR/0/A/2000/003, Activation of the Emergency Operations Facility and Rev 4 to SR/0/A/2000/004, Notification to States and Counties from the Emergency Operations Facility for Catawba, McGuire MNS-14-016, Emergency Plan, Revision 14-12014-01-30030 January 2014 Emergency Plan, Revision 14-1 ML12311A0282012-10-31031 October 2012 Emergency Preparedness Information Requested by NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1,... ML12152A0922012-05-17017 May 2012 Rev. 007 to Emergency Plan Implementing Procedure Changes HP/0/B/1009/023, Environmental Monitoring for Emergency Conditions. ML12130A2572012-04-17017 April 2012 Emergency Plan Implementing Procedure Changes ML0410501782004-04-0606 April 2004 Change to Emergency Plan Implementing Procedures ML0409003012004-03-18018 March 2004 Changes to Emergency Plan Implementing Procedures ML0405500912004-02-12012 February 2004 Changes to Emergency Plan Implementing Procedures ML0403404642004-01-27027 January 2004 Revision 42 to EPIP Index Pages 1 and 2, and Revision 3 to RP/0/A/5700/026, Operations/Engineering Required Actions in the Technical Support Center (TSC) ML0335704962003-12-17017 December 2003 Change to Emergency Plan Implementing Procedures ML0332906152003-11-20020 November 2003 Revised EPIP Index Pages 1, 2, and 3, and Revision 22A to RP/0/A/5700/012, Activation of the Technical Support Center (Tsc). ML0328101852003-10-0101 October 2003 Revision 003 to SR/0/2000/002, Standard Procedures for EOF Services, and Changes to EPIP Index Pages 1, 2, and 3 ML0320400702003-07-11011 July 2003 Changes to Emergency Plan Implementing Procedures ML0309800322003-04-0101 April 2003 Changes to Emergency Plan Implementing Procedures ML0232502322002-11-14014 November 2002 Changes to Emergency Plan Implementing Procedures ML0232201992002-11-0505 November 2002 Part 1 of 2 McGuire Nuclear Site Emergency Plan Implementing Procedures ML0230802992002-10-28028 October 2002 Duke Power, McGuire Nuclear Station Units 1 & 2, Changes to Emergency Plan Implementing Procedures ML0226900732002-09-17017 September 2002 Emergency Plan Implementing Procedures - HP/O/B/1009/023, Revision 005 Dated 08/15/2002 ML0226600742002-09-12012 September 2002 Changes to Emergency Plan Implementing Procedures ML0217701172002-06-20020 June 2002 Changes to Emergency Plan Implementing Procedures ML0220402072002-06-11011 June 2002 Revised Epips, Including Rev. 31 to Coversheet, Index Pages 1-3, Rev. 20 to RP/O/A/5700/012 & Rev. 12 to RP/O/A/5700/020 ML0213406372002-05-0707 May 2002 Changes to Emergency Plan Implementing Procedures ML0212605822002-04-23023 April 2002 Changes to Emergency Plan Implementing Procedures ML0210704682002-04-0909 April 2002 Transmittal of Emergency Plan Implementing Procedures EPIP Index Pages 1 (SR/0/B/2000/003 Rev. 009), 2 (SR/0/B/2000/004 Rev. 005) & 3 for McGuire Nuclear Station Units 1 & 2 ML0210500382002-04-0202 April 2002 Changes to Emergency Plan Implementing Procedures ML0207803842002-03-0505 March 2002 Changes to Emergency Plan Implementing Procedures ML0207300852002-03-0505 March 2002 Changes to Emergency Plan Implementing Procedures ML0206500602002-02-26026 February 2002 Changes to Emergency Plan Implementing Procedures ML0205603042002-01-16016 January 2002 Part 2 of 2, McGuire Nuclear Station, Units 1 & 2, Changes to Emergency Plan Implementing Procedures, Enclosure 4.9 OSM Immediate & Subsequent Actions 2023-09-20
[Table view] Category:Letter type:RA
MONTHYEARRA-24-0254, Resubmittal of Relief Requested in Accordance with 10 CFR 50.55a(g)(5)(iii) for Volumetric Examination of Class 1 Components2024-10-14014 October 2024 Resubmittal of Relief Requested in Accordance with 10 CFR 50.55a(g)(5)(iii) for Volumetric Examination of Class 1 Components RA-24-0185, Snubber Program Plan - Snubber Program Plan Revision, AD-EG-MNS-16182024-08-28028 August 2024 Snubber Program Plan - Snubber Program Plan Revision, AD-EG-MNS-1618 RA-24-0193, Supplement to Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)2024-08-28028 August 2024 Supplement to Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) RA-24-0137, Relief Requests for Inservice Testing Plan – Fifth Interval2024-07-0101 July 2024 Relief Requests for Inservice Testing Plan – Fifth Interval RA-24-0030, Duke Energy - Annual Radioactive Effluent Release Report - 20232024-04-29029 April 2024 Duke Energy - Annual Radioactive Effluent Release Report - 2023 RA-24-0083, Annual Report of Changes Pursuant to 10 CFR 50.462024-04-25025 April 2024 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-24-0031, Annual Radiological Environmental Operating Report - 20232024-04-23023 April 2024 Annual Radiological Environmental Operating Report - 2023 RA-24-0094, Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Traini2024-04-17017 April 2024 Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Training RA-24-0101, (Mns), Units 1 and 2, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency2024-04-16016 April 2024 (Mns), Units 1 and 2, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations RA-24-0085, Onsite Property Insurance Coverage2024-04-0101 April 2024 Onsite Property Insurance Coverage RA-24-0086, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-04-0101 April 2024 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-24-0067, Independent Spent Fuel Storage Installation (ISFSI)2024-02-29029 February 2024 Independent Spent Fuel Storage Installation (ISFSI) RA-24-0004, End of Cycle 29 (M1R29) Inservice Inspection Summary Report2024-02-21021 February 2024 End of Cycle 29 (M1R29) Inservice Inspection Summary Report RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)2024-01-10010 January 2024 Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval2024-01-0404 January 2024 Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0297, Transmittal of the Duke Energy Corporation Topical Report (Duke QAPD-001-A), Amendments 48, 49 and 502023-11-15015 November 2023 Transmittal of the Duke Energy Corporation Topical Report (Duke QAPD-001-A), Amendments 48, 49 and 50 RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0127, 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record2023-06-28028 June 2023 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations RA-23-0117, Report of Changes to Duke Energy McGuire Emergency Plan Annex2023-05-0101 May 2023 Report of Changes to Duke Energy McGuire Emergency Plan Annex RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-23-0037, Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis)2023-03-30030 March 2023 Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis) RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2023-03-30030 March 2023 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-23-0040, Onsite Property Insurance Coverage2023-03-30030 March 2023 Onsite Property Insurance Coverage RA-23-0036, Biennial Decommissioning Financial Assurance Reports2023-03-30030 March 2023 Biennial Decommissioning Financial Assurance Reports RA-23-0076, Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report2023-03-16016 March 2023 Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report RA-23-0024, Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds2023-02-28028 February 2023 Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds RA-23-0065, Report of Changes to McGuire EAL Technical Basis Document2023-02-23023 February 2023 Report of Changes to McGuire EAL Technical Basis Document RA-18-0090, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-17017 February 2023 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-02-17017 February 2023 Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-02-16016 February 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-23-0025, End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI)2023-02-15015 February 2023 End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI) RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2023-02-0202 February 2023 Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-01-23023 January 2023 Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab2022-12-0505 December 2022 Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab RA-22-0312, Report of Changes to McGuire Emergency Plan Annex2022-10-26026 October 2022 Report of Changes to McGuire Emergency Plan Annex 2024-08-28
[Table view] |