RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)10 January 2024Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)
RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX8 January 2024Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEXPacking leak
Offsite Dose Calculation Manual
Operating Basis Earthquake
Exemption Request
Earthquake
Pressure Boundary Leakage
Grace period
Unidentified leakage
Operational leakage
RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval4 January 2024Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval
RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation4 December 2023Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationExemption Request
RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation16 November 2023RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Fitness for Duty
Contraband
Condition Adverse to Quality
Safeguards Contingency Plan
Preemption Authority
Exemption Request
RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2 November 2023Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear PowerSafe Shutdown
High winds
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Qualified Offsite Circuit
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Large early release frequency
Flooding Focused Evaluation
Earthquake
Commercial Grade
Maintenance Rule Program
Pandemic
Turbine Missile
COVID-19
Offsite Circuit
Seismic Walkdown Report
RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes1 November 2023Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of ChangesExemption Request
Siren
RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes20 September 2023Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of ChangesMet Tower
Exemption Request
RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)20 July 2023Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)Non-Destructive Examination
RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)20 July 2023Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Non-Destructive Examination
Weld Overlay
Finite Element Analysis
RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require7 July 2023Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance RequireIncorporated by reference
Surveillance Frequency Control Program
Operational leakage
RA-23-0127, 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record28 June 202310 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of RecordIncorporated by reference
RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory7 June 2023Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory
RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations30 May 2023Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations
RA-23-0118, Cycle 29, Revision 1, Core Operating Limits Report (COLR)3 May 2023Cycle 29, Revision 1, Core Operating Limits Report (COLR)Boric Acid
Shutdown Margin
RA-23-0117, Report of Changes to Duke Energy McGuire Emergency Plan Annex1 May 2023Report of Changes to Duke Energy McGuire Emergency Plan Annex
RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.4626 April 2023Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46
RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 202226 April 2023Duke Energy Annual Radiological Environmental Operating Report - 2022Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Fukushima Dai-Ichi
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Earthquake
Chernobyl
RA-23-0046, Annual Radioactive Effluent Release Report - 202224 April 2023Annual Radioactive Effluent Release Report - 2022Annual Radioactive Effluent Release Report
RA-23-0037, Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis)30 March 2023Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis)Decommissioning Funding Plan
Authorized possession limits
RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums30 March 202310 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
RA-23-0040, Onsite Property Insurance Coverage30 March 2023Onsite Property Insurance Coverage
RA-23-0036, Biennial Decommissioning Financial Assurance Reports30 March 2023Biennial Decommissioning Financial Assurance Reports
RA-23-0076, Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report16 March 2023Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report
RA-23-0024, Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds28 February 2023Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds
RA-23-0065, Report of Changes to McGuire EAL Technical Basis Document23 February 2023Report of Changes to McGuire EAL Technical Basis DocumentEarthquake
RA-18-0090, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors17 February 2023Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ReactorsSafe Shutdown
High winds
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Fukushima Dai-Ichi
Large early release frequency
Turbine Missile
Seismic Walkdown Report
RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)17 February 2023Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Weld Overlay
Hydrostatic
Finite Element Analysis
Flow Accelerated Corrosion
Stress corrosion cracking
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements16 February 2023Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Stress corrosion cracking
Pressure Boundary Leakage
Unidentified leakage
Operational leakage
RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b16 February 2023License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High winds
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Qualified Offsite Circuit
FLEX
Fukushima Dai-Ichi
Seismically rugged
Surveillance Frequency Control Program
Large early release frequency
Battery sizing
Flooding Focused Evaluation
Earthquake
Commercial Grade
Pandemic
Turbine Missile
COVID-19
Offsite Circuit
Seismic Walkdown Report
Manual Operator Action
RA-23-0025, End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI)15 February 2023End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI)
RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2 February 2023Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XIIncorporated by reference
RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies1 February 2023License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement FrequenciesEnforcement Discretion
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Operational leakage
RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)23 January 2023Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)
RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab5 December 2022Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab
RA-22-0312, Report of Changes to McGuire Emergency Plan Annex26 October 2022Report of Changes to McGuire Emergency Plan Annex
RA-22-0303, End of Cycle 28 (M1 R28) Steam Generator Tube Inspection Report25 October 2022End of Cycle 28 (M1 R28) Steam Generator Tube Inspection ReportNondestructive Examination
RA-22-0291, Report of Changes to Emergency Plan Implementing Procedures17 October 2022Report of Changes to Emergency Plan Implementing Procedures
RA-22-0024, Relief Requested in Accordance with 10 CFR 50.55a(g)(5)(iii) for Volumetric Examination of Class 1 Components21 September 2022Relief Requested in Accordance with 10 CFR 50.55a(g)(5)(iii) for Volumetric Examination of Class 1 Components
RA-22-0253, Independent Spent Fuel Storage Installation (Isfsi), Register Use of Casks25 August 2022Independent Spent Fuel Storage Installation (Isfsi), Register Use of Casks
RA-22-0178, End of Cycle 28 (M1R28) Inservice Inspection Summary Report8 August 2022End of Cycle 28 (M1R28) Inservice Inspection Summary Report
RA-22-0151, Duke Energy Common Emergency Plan, Revision 2, Summary of Changes24 May 2022Duke Energy Common Emergency Plan, Revision 2, Summary of ChangesExemption Request
Minimum staff
Grace period
Siren
RA-22-0148, 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory16 May 202210 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified LaboratoryBlind Performance Test
RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility13 May 2022Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations FacilityHealth Physics Network
High winds
RA-22-0149, Supplement to the Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System28 April 2022Supplement to the Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage SystemExemption Request
RA-22-0028, Annual Report of Changes Pursuant to 10 CFR 50.4627 April 2022Annual Report of Changes Pursuant to 10 CFR 50.46
RA-22-0029, Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 202127 April 2022Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 2021Annual Radioactive Effluent Release Report
RA-22-0127, Interim Part 21 Report of a Deviation or Failure to Comply for Cutler-Hammer Relay8 April 2022Interim Part 21 Report of a Deviation or Failure to Comply for Cutler-Hammer Relay
RA-22-0102, Response to Request for Additional Information (RAI) Regarding Revision 1 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology7 April 2022Response to Request for Additional Information (RAI) Regarding Revision 1 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement MethodologyAffidavit
RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System7 April 2022Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage SystemTornado Missile
Commercial Grade Dedication
Condition Adverse to Quality
Tornado-Generated Missile
Design basis earthquake
Exemption Request
Liquid penetrant