PNO-IV-79-009:on 791016,reporter Interviewed Plant Manager Re Repts of Radioactive Leakage instances:790926,leakage Past Packing on Two Primary Sys Valves Into Bldg & 791012, Shutdown Cooling Heat Exchanger Leak to Svc Water Sys
ML20125B897
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/17/1979
From: Madsen G, Westerman T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
References
PNO-IV-79-009, PNO-IV-79-9, NUDOCS 7912310069
Download: ML20125B897 (1)


_ . _ . __ ___

., PRELIKD*ARY NOTIFICATION October 17, 1979 FRELD'.INAKY NOTIFICATION OF t. u;I OR UNUSUAL OCCURRENCE - PNO-IV-79-09 Ihis orelimin rv notification cons _titutes EAFJ.Y notice of eventd of POSSIBl.E

!.1f ety or public interest sir _1f_1cance. The informa, tion __ presented is as l initially receiged without verification or evaluatio_n and is basienlly al' I

that is knou 1tby 1E staff on this date.

FACILITY: Arkansas Power and Light Co.

Arkansas Nuclear One Unita 1 and 2 Docket Nos. 50-313, 50-368 E

SC3JE,CT: PRISS EEI. EASE CONCERNING RADI0 ACTIVE LEAKAGE FROM AF1WSAS NUCLEAR ONE Tne Arkansas Nuclear One General l'innt Manager was interviewed on October 16, 1979 by an Arkansas Gazette reporter concerning reports of radioactive leakage from the Arkansas Nuclear One site. There were two instances cited. One occurred on September 26, 1979 when there had been leakage past the packing on two of the primary system sample valves inco che Unit 1 Auxiliary Building.

The second event occurred on October 12, 1979 when there had been Shutdown Cooling heat Exhanger Isakage into the Service Water System, ne NRC Resident Inspector had been infor=ed of both instances. Neither the Facility Technical Specffication or Regulatory L1=1cs were exceeded in either instance.

An article was subsequently published in the Arkansas Gszette on October 17, 1979. The Keglun 17 (Texas) Resident Inspcctot was netified that the interview of the General Plant Mansger had taken place on October 16, 1979 at 7:30 p.m.

CST.

'~

ne Arkansas Kuclear One Unit 1 1s a B&W pressurized water reactor. Unit 2 is a CE pressuri:ed water reactor.

Coutset: T. T. Wester:::an, RIT 334-2781; C. L. Madsen RIV 334-2781 nistribution: Transmitted 11 St, -

Chairman Hendrie Co==1ssioner Bradford S. J. Chilk, SEcr Com:1ssioner Kennedy Commissioner Ahearne C. C. Karanerer, CA Co issioner Gilinsky ACRS (For Distribution)

Transmitted: MNBB P. Bldg. IE:XOOS 2*3 5 (IE:EQ Dir.

L. V. Gossick. EDO H. R. Denton H. L. Ornstein, EDO R. C. DeYoung, NRR J. J. Touchard, PA E. J. Mattson, NRR Landow (6 min /page';

N. M. Haller, MFA D. Vassallo NRR J. J. Ctaraings. OIA R. G. Ryan. OS? D. Eisenhut, NRR

u. K. Shapar. ELD SS Bldg. _ _ _ _ _ _ _ _

(MAIL)

W. J. Dircks, NMSS R. Minogue, SD

3. Levine, RES IZ:IOOS PRELIMINARY NOTIFICATION 90003121 0 $? W -A

(

_ _ _ _ _ . _ _ _ _ _ _ .