NRC 2016-0007, Open Phase Condition Initiative Commitment Change

From kanterella
(Redirected from NRC 2016-0007)
Jump to navigation Jump to search
Open Phase Condition Initiative Commitment Change
ML16074A148
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/14/2016
From: Mccartney E
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2016-0007
Download: ML16074A148 (2)


Text

March 14, 2016 NRC 2016-0007 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Docket 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Open Phase Condition Initiative Commitment Change

Reference:

(1) Next Era Energy Point Beach, LLC Response to Request for Additional Information Regarding NRC Bulletin 2012-01 Design Vulnerability in Electric Power System, dated January 31, 2014 (ML14031A249)

Via Reference (1), NextEra Energy Point Beach, LLC (NextEra) committed to follow the generic schedule provided in Nuclear Energy Institute (NEI) letter to the NRC, Industry Initiative on Open Phase Condition (OPC), dated October 9, 2013. NEI has revised the industry initiative on OPC. NextEra commits to follow Revision 1 of the NEI OPC Initiative dated March 2015, or any subsequent revision issued by NEI on behalf of the industry.

Summary of Regulatory Commitments:

The Regulatory Commitment contained in Reference (1) states:

  • NextEra will follow the generic schedule provided in the Nuclear Energy Institute letter to the NRC, Industry Initiative on Open Phase Condition, dated October 9, 2013.

NextEra is modifying this Regulatory Commitment to state:

  • NextEra commits to adhering to the NEI Open Phase Condition Initiative, Revision 1, dated March 2015, or any subsequent revision issued by NEI. NextEra intends to follow the generic schedule therein.

NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk Page 2 If you have any questions please contact Mr. Bryan Woyak, Licensing Manager, at 920-755-7599.

Very truly yours, NextEra Energy Point Beach, LLC

~Vvtc~

Eric McCartney Site Vice President cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC

March 14, 2016 NRC 2016-0007 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Docket 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Open Phase Condition Initiative Commitment Change

Reference:

(1) Next Era Energy Point Beach, LLC Response to Request for Additional Information Regarding NRC Bulletin 2012-01 Design Vulnerability in Electric Power System, dated January 31, 2014 (ML14031A249)

Via Reference (1), NextEra Energy Point Beach, LLC (NextEra) committed to follow the generic schedule provided in Nuclear Energy Institute (NEI) letter to the NRC, Industry Initiative on Open Phase Condition (OPC), dated October 9, 2013. NEI has revised the industry initiative on OPC. NextEra commits to follow Revision 1 of the NEI OPC Initiative dated March 2015, or any subsequent revision issued by NEI on behalf of the industry.

Summary of Regulatory Commitments:

The Regulatory Commitment contained in Reference (1) states:

  • NextEra will follow the generic schedule provided in the Nuclear Energy Institute letter to the NRC, Industry Initiative on Open Phase Condition, dated October 9, 2013.

NextEra is modifying this Regulatory Commitment to state:

  • NextEra commits to adhering to the NEI Open Phase Condition Initiative, Revision 1, dated March 2015, or any subsequent revision issued by NEI. NextEra intends to follow the generic schedule therein.

NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk Page 2 If you have any questions please contact Mr. Bryan Woyak, Licensing Manager, at 920-755-7599.

Very truly yours, NextEra Energy Point Beach, LLC

~Vvtc~

Eric McCartney Site Vice President cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC