NRC 2016-0006, License Amendment Request 277. Revision to Staff Augmentation Times in the Emergency Plan, Supplemental Response to Request for Additional Information No. 5 -Correction to Table 5.1

From kanterella
(Redirected from NRC 2016-0006)
Jump to navigation Jump to search

License Amendment Request 277. Revision to Staff Augmentation Times in the Emergency Plan, Supplemental Response to Request for Additional Information No. 5 -Correction to Table 5.1
ML16040A175
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/09/2016
From: Woyak B
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2016-0006
Download: ML16040A175 (5)


Text

February 9, 2015 NRC 2016-0006 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 Point Beach Nuclear Plant Units 1 and 2 Docket No. 50-266 and 50-301 Renewed License No. DPR-24 and DPR-27 License Amendment Request 277. Revision to Staff Augmentation Times in the Point Beach Nuclear Plant Emergency Plan Supplemental Response to Request for Additional Information #5 - Correction to Table 5.1 Reference 1: NextEra Energy Point Beach, LLC letter to NRC, dated January 26, 2016, License Amendment Request 277, Revision to Staff Augmentation Times in the Point Beach Nuclear Plant Emergency Plan Supplemental Response to Request for Additional Information #5 In Reference 1, NextEra Energy Point Beach, LLC (NextEra) submitted a supplemental response to request for additional information (RAI) #5 for License Amendment Request 277, Revision to Staff Augmentation Times in the Point Beach Nuclear Plant Emergency Plan.

The Shift Technical Advisor (STA) was inadvertently omitted from Table 5.1, "Minimum Staffing For Emergencies," of Enclosure 2, Attachments 1 and 2 of Reference (1). Enclosure 1, Attachments 1 and 2 of this letter replaces Table 5.1.

This letter contains no new regulatory commitments and no revisions to existing commitments.

Very truly yours, NextEra Energy Point Beach, LLC Bryan Woyak Licensing Manager Enclosures cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

ENCLOSURE1,ATTACHMENT1 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST 277 REVISION TO STAFF AUGMENTATION TIMES IN THE PBNPEMERGENCYPLAN REVISION TO MARKED-UP COPY OF TABLE 5.1 OF EMERGENCY PLAN 5.0 1 Page follows

POINT BEACH NUCLEAR PLANT EP 5.0 EMERGENCY PLAN MANUAL NNSR Revision 6-l- 62 DRAFT ORGANIZATIONAL CONTROL OF EMERGENCIES July 22, 2015 TBD 8.0 BASES B-1 PBNP Staffing Analysis perfmmed and approved on 11/06/2013 (Rev 2) in accordance with NEI 10-05 (Rev 0), Assessment of On-Shift Emergency Response Organization Staffing Capabilities.

TABLE5.1 M'. m1mum Staffimg F or Emergenc1es (B-I)

ON SIITFT STAFFING MAJOR FUNCTIONAL POSITION/FUNCTION TITLE Staffing AREA Shift Manager (SM) I Plant Operations and Operating Supervisor (OS) 2 Assessment of Operational Control Operators (CO) 4 Aspects Auxiliary Operators (AO) 5 (I FBL + 2 FBM) (Note I)

Shift Technical Advisor (STA) I Notification/ Communicator Note2 Communications Security 8hlft Supervisor (S&S}

I

-- (State and Local Notifications)

Support Staff Radiochemistry Technician I Dose Assessment I Radiation Protection Technologist +2 Fire Brigade Additional FBMs and/or AOs (Note I) 2 TOTALS !820 FBL- Fire Brigade Leader FBM- Fire Brigade Member Note I: Total staffing for AOs/FBMs is 7. This includes a minimum of 5 AOs plus 2 additional FBMs which may be AOs.

Note 2: This position may be filled by the OS, AO, or STA.

AUGMENTATION STAFFING MAJOR FUNCTIONAL POSITION TITLE 31!60 61!90 AREA MINUTES MINUTES Emergency Director tEGFJ (TSC) I +

Emergency Direction and TSC Manager I Control EOFManager I Assistant EOF Manager l EALMonitor l Operations Coordinator I +

En.,ineerina Coordinator + +

Reactor Enaineer I Mechanical Engineer l Electrical Engineer I OSC Coordinator I +

Rad/Chem Coordinator I Operations Leader (OSC) I +

Radiation Protection Leader (OSC) 1 +

Plant System Engineering I Radiation Protection Technician (OSC) 4 Repair and Corrective Actions I&C Leader (OSC) + I Protective Actions I&C Technician (OSC) I Mechanical or Eleetrieal Leader (OSC) + I Mechanical (OSC) 1 Electrical Leader (OSC) l Electrician (OSC) 1 Chemistrv Leader l Gh~ Radiochemistry Technician (OSC) I Resource Coordinator (EOF) I Dose/PAR Coordinator (EOF) + l OSRPF Coordinator l +

Field Team Leader l +

Field Monitoring Team #I 2 +

Field Monitoring Team #2 2 +

Communications ERF Communicator (TSC) I +

ERF Communicator (EOF) I ENS Communicator (TSC) I +

State/County Communicator (EOF) I TOTALS 627 MIO Page 18 of25

ENCLOSURE1,ATTACHMENT2 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST 277 REVISION TO STAFF AUGMENTATION TIMES IN THE PBNPEMERGENCYPLAN REVISION TO CLEAN COPY OF TABLE 5.1 OF EMERGENCY PLAN 5.0 1 Page follows

POINT BEACH NUCLEAR PLANT EP 5.0 EMERGENCY PLAN MANUAL NNSR Revision 62 ORGANIZATIONAL CONTROL OF EMERGENCIES TBD 8.0 BASES B-1 PBNP Staffing Analysis performed and approved on 11/06/2013 (Rev 2) in accordance with NEI 10-05 (Rev 0), Assessment of On-Shift Emergency Response Organization Staffing Capabilities.

TABLE 5.1 M'. mimum Staffimg For Emergenc1es (B-1)

ON SHIFT STAFFING MAJOR FUNCTIONAL POSITION/FUNCTION TITLE Staffing AREA Shift Manager (SM) 1 Plant Operations and Operating Supervisor (OS) 2 Assessment of Operational Control Operators (CO) 4 Aspects Auxiliary Operators (AO)

(l FBL + 2 FBM) (Note 1) 5 Shift Technical Advisor (STA) 1 Notification/ Communicator Note2 Communications Security Supervisor

  • 1 (State and Local Notifications)

Support Staff Radiochemistry Technician 1 Dose Assessment l Radiation Protection Technologist 2 Fire Brigade Additional FBMs and/or AOs (Note 1) 2 TOTALS 20 FBL- Fire Brigade Leader FBM - Fire Brigade Member Note 1: Total staffing for AOs/FBMs is 7. This includes a minimum of 5 AOs plus 2 additional FBMs which may be AOs.

Note 2: This position may be filled by the OS, AO, or STA.

AUGMENTATION STAFFING MAJOR FUNCTIONAL POSITION TITLE 60 90 AREA MINUTES MINUTES Emergency Director (TSC) I Emergency Direction and TSCManager 1 Control EOFManager 1 Assistant EOF Manaaer I EAL Monitor I Operations Coordinator I Reactor Engineer I Mechanical Engineer I Electrical Engineer I OSC Coordinator 1 Rad/Chem Coordinator 1 Operations Leader (OSC) I Radiation Protection Leader (OSC) I Radiation Protection Technician (OSC) 4 I&C Leader (OSC) I Plant System Engineering I

!&C Technician (OSC) 1 Repair and Corrective Actions Protective Actions Mechanical Leader (OSC) I Mechanical (OSC) 1 Electrical Leader (OSC) I Electrician (OSC) I Chemistry Leader I Radiochemistry Technician (OSC) 1 Resource Coordinator (EOF) 1 Dose/PAR Coordinator (EOF) I OSRPF Coordinator I Field Team Leader 1 Field Monitoring Team# 1 2 Field Monitoring Team #2 2 Communications ERF Communicator (TSC) I ERF Communicator (EOF) 1 ENS Communicator (TSC) I State/County Communicator (EOF) I TOTALS 27 10 Page 18 of25

February 9, 2015 NRC 2016-0006 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 Point Beach Nuclear Plant Units 1 and 2 Docket No. 50-266 and 50-301 Renewed License No. DPR-24 and DPR-27 License Amendment Request 277. Revision to Staff Augmentation Times in the Point Beach Nuclear Plant Emergency Plan Supplemental Response to Request for Additional Information #5 - Correction to Table 5.1 Reference 1: NextEra Energy Point Beach, LLC letter to NRC, dated January 26, 2016, License Amendment Request 277, Revision to Staff Augmentation Times in the Point Beach Nuclear Plant Emergency Plan Supplemental Response to Request for Additional Information #5 In Reference 1, NextEra Energy Point Beach, LLC (NextEra) submitted a supplemental response to request for additional information (RAI) #5 for License Amendment Request 277, Revision to Staff Augmentation Times in the Point Beach Nuclear Plant Emergency Plan.

The Shift Technical Advisor (STA) was inadvertently omitted from Table 5.1, "Minimum Staffing For Emergencies," of Enclosure 2, Attachments 1 and 2 of Reference (1). Enclosure 1, Attachments 1 and 2 of this letter replaces Table 5.1.

This letter contains no new regulatory commitments and no revisions to existing commitments.

Very truly yours, NextEra Energy Point Beach, LLC Bryan Woyak Licensing Manager Enclosures cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

ENCLOSURE1,ATTACHMENT1 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST 277 REVISION TO STAFF AUGMENTATION TIMES IN THE PBNPEMERGENCYPLAN REVISION TO MARKED-UP COPY OF TABLE 5.1 OF EMERGENCY PLAN 5.0 1 Page follows

POINT BEACH NUCLEAR PLANT EP 5.0 EMERGENCY PLAN MANUAL NNSR Revision 6-l- 62 DRAFT ORGANIZATIONAL CONTROL OF EMERGENCIES July 22, 2015 TBD 8.0 BASES B-1 PBNP Staffing Analysis perfmmed and approved on 11/06/2013 (Rev 2) in accordance with NEI 10-05 (Rev 0), Assessment of On-Shift Emergency Response Organization Staffing Capabilities.

TABLE5.1 M'. m1mum Staffimg F or Emergenc1es (B-I)

ON SIITFT STAFFING MAJOR FUNCTIONAL POSITION/FUNCTION TITLE Staffing AREA Shift Manager (SM) I Plant Operations and Operating Supervisor (OS) 2 Assessment of Operational Control Operators (CO) 4 Aspects Auxiliary Operators (AO) 5 (I FBL + 2 FBM) (Note I)

Shift Technical Advisor (STA) I Notification/ Communicator Note2 Communications Security 8hlft Supervisor (S&S}

I

-- (State and Local Notifications)

Support Staff Radiochemistry Technician I Dose Assessment I Radiation Protection Technologist +2 Fire Brigade Additional FBMs and/or AOs (Note I) 2 TOTALS !820 FBL- Fire Brigade Leader FBM- Fire Brigade Member Note I: Total staffing for AOs/FBMs is 7. This includes a minimum of 5 AOs plus 2 additional FBMs which may be AOs.

Note 2: This position may be filled by the OS, AO, or STA.

AUGMENTATION STAFFING MAJOR FUNCTIONAL POSITION TITLE 31!60 61!90 AREA MINUTES MINUTES Emergency Director tEGFJ (TSC) I +

Emergency Direction and TSC Manager I Control EOFManager I Assistant EOF Manager l EALMonitor l Operations Coordinator I +

En.,ineerina Coordinator + +

Reactor Enaineer I Mechanical Engineer l Electrical Engineer I OSC Coordinator I +

Rad/Chem Coordinator I Operations Leader (OSC) I +

Radiation Protection Leader (OSC) 1 +

Plant System Engineering I Radiation Protection Technician (OSC) 4 Repair and Corrective Actions I&C Leader (OSC) + I Protective Actions I&C Technician (OSC) I Mechanical or Eleetrieal Leader (OSC) + I Mechanical (OSC) 1 Electrical Leader (OSC) l Electrician (OSC) 1 Chemistrv Leader l Gh~ Radiochemistry Technician (OSC) I Resource Coordinator (EOF) I Dose/PAR Coordinator (EOF) + l OSRPF Coordinator l +

Field Team Leader l +

Field Monitoring Team #I 2 +

Field Monitoring Team #2 2 +

Communications ERF Communicator (TSC) I +

ERF Communicator (EOF) I ENS Communicator (TSC) I +

State/County Communicator (EOF) I TOTALS 627 MIO Page 18 of25

ENCLOSURE1,ATTACHMENT2 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST 277 REVISION TO STAFF AUGMENTATION TIMES IN THE PBNPEMERGENCYPLAN REVISION TO CLEAN COPY OF TABLE 5.1 OF EMERGENCY PLAN 5.0 1 Page follows

POINT BEACH NUCLEAR PLANT EP 5.0 EMERGENCY PLAN MANUAL NNSR Revision 62 ORGANIZATIONAL CONTROL OF EMERGENCIES TBD 8.0 BASES B-1 PBNP Staffing Analysis performed and approved on 11/06/2013 (Rev 2) in accordance with NEI 10-05 (Rev 0), Assessment of On-Shift Emergency Response Organization Staffing Capabilities.

TABLE 5.1 M'. mimum Staffimg For Emergenc1es (B-1)

ON SHIFT STAFFING MAJOR FUNCTIONAL POSITION/FUNCTION TITLE Staffing AREA Shift Manager (SM) 1 Plant Operations and Operating Supervisor (OS) 2 Assessment of Operational Control Operators (CO) 4 Aspects Auxiliary Operators (AO)

(l FBL + 2 FBM) (Note 1) 5 Shift Technical Advisor (STA) 1 Notification/ Communicator Note2 Communications Security Supervisor

  • 1 (State and Local Notifications)

Support Staff Radiochemistry Technician 1 Dose Assessment l Radiation Protection Technologist 2 Fire Brigade Additional FBMs and/or AOs (Note 1) 2 TOTALS 20 FBL- Fire Brigade Leader FBM - Fire Brigade Member Note 1: Total staffing for AOs/FBMs is 7. This includes a minimum of 5 AOs plus 2 additional FBMs which may be AOs.

Note 2: This position may be filled by the OS, AO, or STA.

AUGMENTATION STAFFING MAJOR FUNCTIONAL POSITION TITLE 60 90 AREA MINUTES MINUTES Emergency Director (TSC) I Emergency Direction and TSCManager 1 Control EOFManager 1 Assistant EOF Manaaer I EAL Monitor I Operations Coordinator I Reactor Engineer I Mechanical Engineer I Electrical Engineer I OSC Coordinator 1 Rad/Chem Coordinator 1 Operations Leader (OSC) I Radiation Protection Leader (OSC) I Radiation Protection Technician (OSC) 4 I&C Leader (OSC) I Plant System Engineering I

!&C Technician (OSC) 1 Repair and Corrective Actions Protective Actions Mechanical Leader (OSC) I Mechanical (OSC) 1 Electrical Leader (OSC) I Electrician (OSC) I Chemistry Leader I Radiochemistry Technician (OSC) 1 Resource Coordinator (EOF) 1 Dose/PAR Coordinator (EOF) I OSRPF Coordinator I Field Team Leader 1 Field Monitoring Team# 1 2 Field Monitoring Team #2 2 Communications ERF Communicator (TSC) I ERF Communicator (EOF) 1 ENS Communicator (TSC) I State/County Communicator (EOF) I TOTALS 27 10 Page 18 of25