From: Meyer L
Point Beach
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
GL-04-002, NRC 2012-0054
Download: ML12178A292 (2)


Text

NEXT June 25,2012 NRC 2012-0054 GL 2004-02 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Commitment Change for the NextEra Energy Point Beach. LLC Generic Letter 2004-02 Plan for Resolution

References:

(1) Nuclear Energy Institute letter to NRC, dated May 4, 2012, GSI-191 - Current Status and Recommended Actions for Closure (ML12142A316)

(2) U.S. Nuclear Regulatory Commission, "Potential lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors," NRC Generic Letter 2004-02, September 13,2004 (ML042360586)

(3) NextEra Energy Point Beach, LLC letter to NRC, dated February 4,201 1, Plan for Completion of Actions for Generic Letter 2004-02, Potential lmpact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC No. MC4705lMC4706) (MLI 10350515)

Via Reference (I), the Nuclear Energy lnstitute (NEI) provided the Nuclear Regulatory Commission (NRC) with the industry's current status and recommended actions for closure to achieve compliance with the provisions of Generic Letter (GL) 2004-02, Potential lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors (Reference 2).

In Reference (3), NextEra Energy Point Beach, LLC (NextEra) committed to develop a plan to achieve final resolution of Generic Safety Issue (GSI)-191, consistent with industry guidance, by June 30,2012. In order to align itself with the industry and the recommended actions contained in Reference (I), NextEra is modifying the commitment to provide the NRC with a GSI-191 resolution path and schedule by December 31, 2012.

NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk Page 2 Summaw of Reaulatorv Commitments The Regulatory Commitment contained in Reference (3) states:

NextEra shall develop a plan to achieve final resolution of GSI-I 91 for PBNP, Units 1 and 2, consistent with future industry guidance and the Reference (4) Staff Requirements Memo, by June 30, 2012.

NextEra is revising the Regulatory Commitment for Units Iand 2 to state:

NextEra will submit a GSI-191 resolution path and schedule for PBNP, Units 1 and 2, consistent with industry guidance, by December 31, 2012.

If you have questions or require additional information, please contact Mr. William Hennessy, Acting Licensing Manager, at 9201755-7656.

In accordance with the provisions of 10 CFR 50.91, a copy of this submittal has been provided to the designated Wisconsin Official.

Very truly yours, NextEra Energy Point Beach, LLC Larry Meyer Site Vice President cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW

Text

NEXT June 25,2012 NRC 2012-0054 GL 2004-02 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Commitment Change for the NextEra Energy Point Beach. LLC Generic Letter 2004-02 Plan for Resolution

References:

(1) Nuclear Energy Institute letter to NRC, dated May 4, 2012, GSI-191 - Current Status and Recommended Actions for Closure (ML12142A316)

(2) U.S. Nuclear Regulatory Commission, "Potential lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors," NRC Generic Letter 2004-02, September 13,2004 (ML042360586)

(3) NextEra Energy Point Beach, LLC letter to NRC, dated February 4,201 1, Plan for Completion of Actions for Generic Letter 2004-02, Potential lmpact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC No. MC4705lMC4706) (MLI 10350515)

Via Reference (I), the Nuclear Energy lnstitute (NEI) provided the Nuclear Regulatory Commission (NRC) with the industry's current status and recommended actions for closure to achieve compliance with the provisions of Generic Letter (GL) 2004-02, Potential lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors (Reference 2).

In Reference (3), NextEra Energy Point Beach, LLC (NextEra) committed to develop a plan to achieve final resolution of Generic Safety Issue (GSI)-191, consistent with industry guidance, by June 30,2012. In order to align itself with the industry and the recommended actions contained in Reference (I), NextEra is modifying the commitment to provide the NRC with a GSI-191 resolution path and schedule by December 31, 2012.

NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk Page 2 Summaw of Reaulatorv Commitments The Regulatory Commitment contained in Reference (3) states:

NextEra shall develop a plan to achieve final resolution of GSI-I 91 for PBNP, Units 1 and 2, consistent with future industry guidance and the Reference (4) Staff Requirements Memo, by June 30, 2012.

NextEra is revising the Regulatory Commitment for Units Iand 2 to state:

NextEra will submit a GSI-191 resolution path and schedule for PBNP, Units 1 and 2, consistent with industry guidance, by December 31, 2012.

If you have questions or require additional information, please contact Mr. William Hennessy, Acting Licensing Manager, at 9201755-7656.

In accordance with the provisions of 10 CFR 50.91, a copy of this submittal has been provided to the designated Wisconsin Official.