NPL-98-0252, Forwards MOR for Mar 1998 for Point Beach Nuclear Plant, Units 1 & 2 & Revised Corrected MOR for Feb 1998

From kanterella
(Redirected from NPL-98-0252)
Jump to navigation Jump to search
Forwards MOR for Mar 1998 for Point Beach Nuclear Plant, Units 1 & 2 & Revised Corrected MOR for Feb 1998
ML20216D700
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/08/1998
From: Dante Johnson
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20216D705 List:
References
NPL-98-0252, NPL-98-252, NUDOCS 9804150407
Download: ML20216D700 (1)


Text

.

t Wisconsin Electnc

' POWER COMPANY l Point Beach Nuclear Plant (920) 755-2321 6610 Nuclear Rd., Two Rivers. WI 54241 NPL 98-0252 April 8,1998 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Ladies / Gentlemen:

DOCKETS 50-266 AND 50-301 MONTIILY OPERATING REPORTS POINT BEACil NUCI EAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of March,1998. Also enclosed are the corrected Unit 2 February,1998 operating data report and average daily unit power level sheets.

Sincerely,

&=fS Douglas F. Johnson Manager, Regulatory Services & Licensing I lad Attachments .-

cc: J. D. Loock, PSCW NRC Regional Administrator, Region Ill NRC Resident inspector 9804150407 980408 PDR ADOCK 05000266 R PDR

, "$ *.,,, u 0 ;

a m a n-> rn aw,w,

-