NLS2008060, Transmittal of Response to Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations.

From kanterella
Jump to navigation Jump to search
Transmittal of Response to Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations.
ML082240291
Person / Time
Site: Cooper Entergy icon.png
Issue date: 08/07/2008
From: Vanderkamp D
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2008060, RIS-08-016
Download: ML082240291 (3)


Text

N Nebraska Public Power District "Always there when you need us" NLS2008060 August 7, 2008 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

Subject:

Preparation and Scheduling of Operator Licensing Examinations Cooper Nuclear Station, Docket No. 50-298; DPR-46

Reference:

U. S. Nuclear Regulatory Commission Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations"

Dear Sir or Madam:

The purpose of this letter is to transmit to the U.S. Nuclear Regulatory Commission (NRC) a completed NRC Form 536 for Cooper Nuclear Station as requested in the reference above.

Should you have any questions or require additional information, please contact me at (402) 825-2904 or David Werner, Acting Operations Training Superintendent, at (402) 825-5751.

Sincerely, David W. Van Der Kamp Licensing Manager J0 Attachment cc: Regional Administrator w/attachment Training Manager w/o attachment USNRC - Region IV Cooper Nuclear Station Operations Training Superintendent w/attachment CNS Records w/attachment Cooper Nuclear Station COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098

/40c3 Telephone: (402) 825-3811 / Fax: (402) 825-5211 wwwv.nppd.com

NRC FORM 536 US. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08131/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations, Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch (T-5 F53). U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or b internet EXAMINATION DATA Aandeguato infocollects@nrc.gov. and to the Desk Officer, Office of Information RegulatorAffairs, NEOB-10202, (3150-0131), Office of Management~and Budget, Washington, DC 20503. If a means used to'impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Cooper Nuclear Station 4

A. PROPOSED EXAMINATION PREPARATION SCHEDULE 2

PROPOSED NUMBER CY2009 CY 2010 Cy 2011 . CY 201 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 NUMBER OF REACTOR 8 6 0 OPERATORS NUMBER OF SENIOR REACTOR 0 3 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 4 0 "6 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 000 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 09/14/2009 02/27/2011 ALTERNATE DATE 09/21/2009 03/06/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2011 PROPOSED ------- ........................

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 9 I 10 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER

ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS©D ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS@

Correspondence Number: NLS2008060 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITMENT COMMITTED DATE COMMITMENT NUMBER OR OUTAGE None i i PROCEDURE 0.42 REVISION 22 PAGE 18 OF 25