Edwin I. Hatch, Unit 1, SNCH082-RPT-01, Ver. 1.0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 4 of 11
ML12355A052
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/26/2012
From: Stewart W
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-12-2268 SNCH082-RPT-01, Ver. 1.0
Download: ML12355A052 (56)


Text

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 5 Status: YE N[-] U[]Seismic Walkdown Checklist (SWC)Equipment ID No. 1X41-C002A Equip. Class!Equipment Description DG ROOM 1A FAN Location:

Bldg. DIESEL .Floor El. 150 Room, Area ROOF Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of 'the Seismic Walkdown of an item of equipment on the SWEL. The, space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at. the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.eý, is the item one of the 50% of SWEL items requiring such verification)?

YEr NO 2. Is the anchorage free of bent, broken, missing or loose hardware?Viewed anchorage from underside of roof slab and on the roof.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YED NEI UI- N/AEr YN Ni1 UEI N/AE YZ NEl UE1 N/AE YE NE U- N/AZ YZ NE- UE-IEnter the equipment class name from Appendix B; Classes of Equipment.

Page 145 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0.Sheet 2 Of 5 Status: YE Nn U-J Seismic Walkdown Checklist (SWC)Equipment ID No., 1X41-COO2A

-Equip., Equipment Description DG ROOM 1A FAN Interaction Effects 7. Are soft targets free from: impact by nearby equipment or structures?

YN NiO UI-J N/AFl 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ: N[] UII] N/AL]and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YGI NEIl UEI N/AEl YZ NO UE Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YN NEI UiJ adversely affect the safety functions of the equipment?

Minor concrete surface cracks from the concrete curb~supporting the fan at the roof elevation.

These cracks are not severe in nature and are not judged to be a seismic concern.Comments (Additional pages may be added as necessary)

See 1X41-COO8A for AWC information.

Evaluated Date. 09/24/2012 09/24/2012 Page 146 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 5 Status: YN NEI U[-Seismic Walkdown Checklist (SWC)Equipment ID No. 1X41-COO2A Equip. Class2 9 Equipment Description DO ROOM 1A FAN Photographs 1: Equipment MPL# (IX4I-CO02A)

Page 147 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 2: Equipment Elevation (1X41-C002A)

Page 148 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 5 2: Concrete Surface Cracks at Roof Near Concrete Curb of Fan (lX41-CO02A)

Page 149 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 7 Status: YZ NI U[-]Seismic Walkdown Checklist (SWC)Equipment ID.No. 1X41-COO8A Equip. Class, Equipment Description BATTERY ROOM 1A FAN Location:

Bldg. DIESEL Floor El. 150 Room, Area ROOF Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgmenis and findings.

Additional space is provided at.the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one: of the 50% of SWEL items requiring such verification)?

YEI NO 2. Is the anchorage free of bent, broken, missing or loose hardware?Viewed Fan from below and on the roof.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This% question, only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO NE] UI- N/AEl YO, NI] UIZJ N/AEI YZ NEI U,] N/AE YEI NEI UEJ N/AZ YN NEI U[-]'Enter the equipment class name from Appendix B: Classes of Equipment., Page 150 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 7 Status: YN N[] U[]Seismic Walkdown Checklist (SWC)EquipmentIDNo.

1X41-CO8A Equip. Class, Equipment Description BATTER.YROOM lA FAN Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to co1lapse onto the equipment?
9. Do attached lines have adequate flexibility .to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YN Nil UIJ N/A[E Y1Z NEI U- N/AEl Yi NEI U-- N/AEl Y! NEI UEi Other Adverse Conditions

.11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

The hood at the top of the damper has two bolts on the west side that are not properdy fastened.

The bolt to the north is bent while the bolt to the south is not tight and the hole is oversized (see photographs 4 and 5). Neither bolt has nuts that are fully engaged. The two bolts on the east side are properly fastened.

The hood is not a vital aspect for the operability of the fan ifthe connection were to fail during a seismic event. However, the bolts need to be properly installed.

CR 525153 has been written to install these bolts.YN NEIUE]Comments (Additional pages may be added as necessary)

None.Date: 09/24/2012 Page 151 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 7 Status: YZ N[] UI-Seismic Walkdown Checklist (SWC)Equipment ID No. 1X41-COO8A Equip. Class, 9 Equipment Description BATTERY ROOM 1A FAN Photographs 1: Equipment MPL# (IX41-CO08A)

Page 152 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 2: Equipment Elevation (1X41-CO08A)

Page 153 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet ; of 3: Equipment from Below Roof Slab (IX4I-CO08A)

Page 154 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of 7 4: Bent Bolt for Equipment Hood (IX41-CO08A)

Page 155 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCHO82-RPT-01, VERSION 1.0 SheP-t '7 nf'7 5: Loose Bolt for Equipment Hood (1X41-CO08A)

Page 156 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 4 Status: YN NE] U[]Seismic Walkdown Checklist (SWC)Equipment ID No. 1X41-C009C Equip. Class, Equipment Description INTAKE STRUCTURE VENT FA N IC Location:

Bldg. INTAKE Floor El. 126 Room, Area Pump Room Roof Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may: be used to recordthe results of judgments and findings.

Additional space is. provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Y-I NO 2. Is the anchorage free of bent, broken, missing or loose hardware?On the housing of the fan, there are some holes as can be seen in the pictures.

They are not for structural purposes and the top cover of the housing prevents excessive water intrusion through, these. holes. SWEs judged these holes not to be a seismic concern, and determined that the screws are not needed in these holes.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.):
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YZ NEI UD- N/AD1 YN NEI UD] N/AD-Y0 NEI UD- N/AD YD NDI Ul N/AN YN NEI UED I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 157 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 4 Status: YN NEI U[]Seismic Walkdown Checklist (SWC)Equipment ID No. 1X41-CO09C Equip.Equipment Description INTAKE STRUCTURE VE!VT FAN IC Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Y0 NEI UD. N/ADI 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y10 ND ULJ N/AD and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YN NDI UD- N/AD YI NEI U-]Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YED ND UD1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walkby was performed within the package for 1X41-C009B.

Evaluated by: Date: 9/26/2012 9/26/2012 Page 158 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: Y[ NE] U[]Equipment ID No. IX41-CO09C Equip. Class, 9 Equipment Description INTAKE STRUCTURE VENT FAN I C Photographs Page 159 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 4 , a NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 4 View from underneath inside the pump room Page 160 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Wal kdown Checklist (SWC)Equipment ID No. 1X41-CO09B Equip.Equipment Description INTAKE STRUCTURE VEI NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 5 Status: Y2 NI] U[I]NT FAN 1B Location:

Bldg. INTAKE Floor El. 126 Room, Area. Intake Pump Room Roof Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the. Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions-may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage I.. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?At the louver on the roof, one of the bolts fastening the housing to the concrete pedestal has missing washers. However, this was judged not to be: a seismic concern since washers are not vital for the seismic performance of an anchor bolt. Washers are not required for installations using mild steel bolts and plates without oversized holes.Hole is not oversized based on observation.

Also for the housing of 1X41-COO9B, there are missing screws on the side as shown in the pictures.

This was judged not to be an issue since there is nothing for the screws to attach to at this location.

The holes are not a concern because the overhanging portion ofthe housing prevents the water intrusion.

See attached pictures.3. Isthe anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item isone of the 50% for which an anchorage configuration verification is required.)

Anchorage was compared against Dwg H-12613, Rev. 13 and SQUG package dated 7/22193. The housing at the roof is not a seismically qualified portion of the equipment.

SQUG package only included evaluation of bolts inside the intake.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YE NE YJZ NE UO N/Al Y[ NiOF UO] N/AZl!YE NEI UO- N/AZ YN NO UF- N/AU YN NEI UE-1 Enter the equipment class name from Appendix B: Classes of Equipment.

Page 161 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 5 Status: YN NM] U-]Seismic Walkdown Checklist (SWC)Equipment ID No. E X41-COs9B Equip. Class'Equipment Description INTAKE STRUCTURE VENT FA NIB Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

YS NO UEU N/AEl 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YER NI- UI' N/ACl and masonry block walls not likelyto collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above, seismic interactionevaluations, is equipment free of potentially adverse seismic interaction effects?YI NEl UE- N/A-I YN NE UI-Other Adverse Conditions 1 .Have you looked for and found no other seismic conditions that could YN NEI UE adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

None.Evaluated by: KURSA T KINALI A A'AA121 J, Date: 9/17/2012 9/17/2012 WESLEY WILLIAMS Page 162 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 5 Status: YM NR-] UF]Seismic Walkdown Checklist (SWC)Equipment ID No. 1X41-coo9B Equip. Class' 9 Equipment Description INTAKE STRUCTURE VENT FAN 1B Photographs Page 163 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 5 Page 164 of 436 ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS-dug NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 5 Page 165 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 Of 4 Status:. YZ NR[l UL]Seismic Walkdown Checklist (SWC)Equipment ID No. 1Z41-CO12A Equip. Class 1 Equipment Description DOO4A BOOSTER FAN Location:

Bldg: CONTROL Floor El. 180 Room, Area CONTROL BUILDING ROOF Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used todocument the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage I, Is the anchorage configuration verificationrequired (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YEI NO 2.. is the anchorage free of bent, broken, missing or loose hardware?Fan is located inside of duct work. The anchorage for the duct support to. the concrete roof slab was adequate.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

See response to question 2.4. Is the anchorage free of visible, cracks. in. the concrete near the anchors?See response to question 2.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YZ NE UI- N/A-YO NEI UE- N/AE YZ NO U[3 N/AE]YEI NEI U N/AS YZ NO U-Enter the equipment class name from Appendix B: Classes of Equipment.

Page 166 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 4 Status: YM NE] U-]Seismic Walkdown Checklist (SWC)Equipment ID No. 1Z41-COt12A Equip. Class Equipment Description D004A BOOSTER FAN Interaction Effects 7. Are soft targets free from impact by nearby .equipment or structures?

Steel framing that supports ducts in surrounding area is judged to be adequate to prevent impact to 1Z41-CO12A booster fan.Y[ Nil U'I N/AU 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UL N/AU and masonry block, walls not likely to collapse onto the equipment?

9. Do attached.

lines have adequate flexibility to avoid damage?Flex conduits are coming from duct for equipment and exhibit adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YN NEI UE N/AU1 Yl NEI UEi Other Adverse Conditions
11. Have you looked for and found no. other seismic conditions that could YJ0 NEI UEr adversely affect the -safety functions of the equipment?

Comments (Additional pages may be added as necessary)

See 1P4 1-F422B for A WC information.

Evaluatedby; Juan Vlzcdýa Evaluated by: 4y~jyizg~a Date: 09/26/20 12 Date: 09/26/2012 0912612012 Patrick ellf Page 167 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: YJ N[] U[j]Seismic Walkdown Checklist (SWC)Equipment ID No, 1Z41-CO12A Equip. Class, 9 Equipment Description DOO4A BOOSTER FAN Photographs

! Z41 1: Equipment MPL # (IZ4I-COI2A)

Page 168 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 2: Equipment Elevation (IZ41-CO12A)

Page 169 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)NO. SNCHO82-RPT-01, VERSION 1.0 Sheet 1 of 4 Status: Y2 NE] U[j]Equipment ID No. 1T46-COOIB

.. Equip. Class 1 9 Equipment Description SGST Exhaust Fan Location:

Bldg. REACTOR Floor El.. 164 Room, Area RA-R3 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space beloweach of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided atithe end of this checklist for documenting other comments.AnchOraae 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Y-1 NO 2. Is the anchorage free of bent, broken, missing or loose hardware?Equipment is an inline component, so there is no anchorage.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YE- NEI UEi N/AO YEI NEI UE- N/AO YEI NEI UE]z N/AZ YE NE UEI N/Am YU N[-- UE1 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Page 170 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 4 Status: YZ N[-] U[-Equipment ID No. 1 T46-COOIB Equip. Class, 9 Equipment Description SGST Exhaust Fan Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

YN NEI UE] N/AEl 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI U-I N/AlI and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10; Basedon the above Seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEI UE] N/AE]YN NEI UEr Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YN NEI Ur-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

See Component IT41-FO4OA for Area Walk-by Checklist.

  • : ..Evaluated by: John McFarland Jeff Horton Date: 09/12/2012 09/1212012 Page 171 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: YE NI U[]Seismic Walkdown Checklist (SWC)Equipment ID No. 1T46-COO1B Equip. Class' 9 Equipment Description SGST Exhaust Fan Photographs Figure 1 -Equipment ID No (IT46-COOIB)

Page 172 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 4 Figure 2 -Equipment Elevation (IT46-COO1B)

Page 173 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 6 Status: YN N[] U[-]Seismic Walkdown Checklist (SWC)Equipment ID No. 1Z41-BOO3A Equip. Classi Equipment Description AIR HANDLING UNIT Location:

Bldg. CONTROL Floor El. 180 Room, Area CONTROL BUILDING ROOF Manufacturer, Model, Etc.. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space: is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, rmissing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with.plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage is consistent with calculation SCNH-94-054, Rev. 0 and drawing B-44279, Rev. C.6. Based on the above anchorage evaluations, is.the anchorage free of potentially adverse seismic conditions?

YU NEI UL] N/AL]YN NEI Ut] N/A-!YZ NEI] Ul] N/AL]YN NEI U] NWAD]YZ NEI UE]Enter the equipment class name, from Appendix B: Classes of Equipment.

Page 174 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 6 Status:, Y NEI U[].Seismic Walkdown Checklist (SWC)Equipment ID No. 1Z41-BOO3A Equip. Class'Equipment Description AIR HANDLING UNIT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. ]Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YEI NEI UL] N/AE-YZ NEI un N/AEl YN NEI UE- N/AE!Y[ NEI UE1 Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

There is insulation removed from a pipe attached to the equipment which was not replaced and stored imporperly (see photograph 3).This is not a seismic concem. CR 524535 has.been written to replace the insulation:

properly.There is a steel frame supporting a large insulated duct from the air handler that exhibits corrosion that is more than mild (see photograph 4). The corroded steel does not extend beyond the immediate surface.The remaining steel does not exhibit the same: corrosive appearance.

The weight of the duct and insulation is low with respect to the steel frame's capacity byjudgement.

In its current condition, the support is judged to be seismically adequate.YN NEI UE" Comments (Additional pages may be added as necessary)

SQUG walkdown identified equipment to have steel tabs welded to the existing steel frame for the equipment, which were to be anchored to the concrete roof This was observed to be installed during the walkdown.See. Z41-FOO9B for AWC information.

Evaluated by- Juan Vizcav Patrick Ke/Date: 09126/2012 09126/2012 Page 175 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 6 Status: Y0 N[-] U[]Seismic Walkdown Checldist (SWC)Equipment ID No. 1Z41-BOO3A Equip. Class 1 10 Equipment Description AIR HANDLING UNIT Photographs 1: Equipment MPL # (1Z41-BO03A)

Page 176 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCHO82-RPT-01, VERSION 1,0 Sheet 4 of 6 2: Equipment Elevation (1Z41-BO03A)

Page 177 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 6 3: Insulation Removed and Improperly Stored (1Z41-B003A)

Page 178 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of 6 4: Corroded Steel Support for Duct (1 Z41-BO03A)

Page 179 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)NO. SNCH082-RPT-01, VERSION 1.0 Sheet I of 3 Status: YZ NEI U]Equipment ID No. 1T41-BOOIA Equip. Class' 10 Equipment Description CRD PUMP ROOM COOLER A Location:

Bldg. REACTOR Floor El. 116' Room, Area NW Diagonal R005 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions maybe used to record the results ofjudgments and findings; Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is. the item one of the 50% of SWEL items requiringisuch verification)?

YI- NN 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage, free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5,. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y0 NEI UE] N/A]YE NO U0 N/AE3 YN NEI UL] N/AL]YE] NEI UO N/Az YN NEI UE]I Enter the equipment class name from Appendix B.:: Classes of Equipment.

Page 180 of 436

.ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 3 Status: YU N-] U[-]Seismic Walkdown Checklist (SWC)Equipmenti EfNo. 1T41-BOOIAs Equip Class, Equipment.Description CRD PUMP ROOM COOLER A Ipteraction Effects 7. Are soft targets free from impact by nearby equipment or structures?

YZ NEI UEI N/ADl 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI UD N/AD and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NDI UD] N/AD Y! NO Ur-Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could YN NDI UD]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

None Date: 9/6/12 Page 181 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 3 Status: Y[ NEI U"]I Seismic Walkdown Checklist (SWC)Equipment ID No. 1T41-BOOIA Equip. Class, 10 Equipment Description CRD PUMP ROOM COOLER A Photographs Page 182 of 436

.ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet i of 7 Status: YN N-] Ur]Seismic Walkdown Checklist (SWC)Equipment IDNo. IT41-BO02A Equip. Class" 10 Equipment Description RHR/CS PUMP ROOM COOLER Location:

Bldg. REACTOR Floor El. 107 Room, Area SE Diagonal Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional.

space is provided at the end of this checklist for documenting other comments.Anchorage 1. is the anchorage configuration verification required (i.e., is the item one Y 0 Nr-]of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

YZ N[ UE] N/AE]Housing of the equipment has 4 screws missing in the back which attach the housing to the interior frame. There are 18 screws present.Therefore, this is judged not to be a seismic concem.CR523730 was initiated to replace these screws.SWEs judged this not to be a seismic concern due to the presence of multiple screws present Three bolts on the side (next to the staircase, underneath the edge) are missing. CR518594 was initiated to replace these bolts.S WEs judged this not to be a seismic concern due to the presence of more than 10 bolts (side and back).Bolts attaching the unit to the below steel members were found bent and holes were found without bolts.Per the SQUG evaluation and Drawing B-43459, Rev. D, the original anchor bolts have been replaced with four Welded steel tube members. The bolts were allowed to be removed orabandoned in place. The original anchorage was also identified as an IPEEE vulnerability.

It was verified that theý 4 steel tube.members are present and welded to below framing and the equipment.

Two loose bolts were found on the back of the equipment attaching the framing to the support. One of these bolts is near a welded portion, so it can not be tightened, this is okay due to the existing weld. This was judged not be a seismic concern due to the sheer number of existing bolts/scres present.Four long bolts underneath the cooler fan were observed.

However, they were qualified by the SQUG walkdown package dated 11/5/88.The anchors were verified to match the information in the SQUG package (See Sheet 7).1 Enter the equipment class name from Appendix B: Classes of Equipment.

Page 183 of 436

.ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 7 Status: Y0 NM- U-il Seismic Walkdown Checklist (SWC)Equipment ID No. 1 T41-BOO2A Equip. Class, Equipment Description RHR/CS PUMP ROOM COOLEi 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

There is mild surface corrosion on the channels on the back of the equipment However, this is judged not be a seismic issue since it is only mild surface corrosion.

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage was compared against the SQUG package dated 11/5188 and Drawing B-43459, Sheet 1, Rev. 0.6. Based' on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YZ NEI U[] N/All YO NEI UL] N/A[l YN NEI UEL N/AL]YS NE UEr Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

YE NCI UE- N/AE3 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y0 NE] U[] N/AF]and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibilityto avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YIK. NEI UL] N/AE]Y0 NEl UF'Page 184 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)Equipment IDNo. 1T41-BOO2A Equip. Class' 10 Equipment Description RHR/CS PUMP ROOM COOLER NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 7 Status: YO N-] U[]Other Adverse Conditions
11. Have you looked for and found no other seismic conditions thatcould adversely affect the safety functions of the equipment?

YN NEI U0 Comments (Additional pages may be added as necessary), None.Of Evaluated~by:

KURSAT KINALI Date: 9/2612012 WESLEY WILLIAMS ., 9/26/2012 Page 185 of 436

  • ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)Equipment ID No. I T41-BO02A Equip. Class, Equipment Description RHFICS PUMP ROOM COOLE1 NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 7 Status: Y1 N[] U[]Photographs Page 186 of 436

, ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 7 Page 187 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of 7 Page 188 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 7 of 7 Page 189 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 3 Status: YN N-] U[-]Seismic Walkdown Checklist (SWC).Equipment IDNo. 1T41-BO05B Equip. Class' 10 Equipment Description HPCl ROOM COOLER, Location:

Bldg. REACTOR FloorEl. 87 Room, Area HPCI Room Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may beused to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YO NEI 2. Is the-anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. is the anchorage configuration consistent with plant documentation?(Note: This question.

only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Compared against the earlier SQUG package dated 6/28/89.6. Based on the above anchorage evaluations,'isthe anchorage free of potentially adverse seismic conditions?

YN NEI U- N/AU YZ NEI UE' N/AO YS NEI UE- N/AU YZ NC UF' N/AU Y0 NEI U17 I Enter the equipment class name from Appendix B: Classes of.Equipment.

Page 190 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 3.Status: YN NEI U[-Seismic Walkdown Checklist (SWC)EquipmentID No. 1T41-B005B Equip. Class" 10 Equipment Description HPCI ROOM COOLER Interaction Effects 7. Are soft targets free from :impact by nearby equipment or structures?

Y9 NEI UE- N/AU1 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE UE1 N/AU and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEl UE3 N/AUl YN NI UE-Other Adverse ,Conditions
11. Have you looked for and found no other seismic conditions that could YI NEI UE-adversely affectathe safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walk by was performed within the package for 1E41-COOI.

Date: 9/10/2012 Page 191 of 436

  • ATTACHMENT 3: SEISMIC WALKODOWN CHECKLISTS

~ Seismic Walkdown Checklist (SWC)Equipment ID No. 1141-00050B-Equip.Equipment Description HPCI ROOM COOLER NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 3 Status: YN N[--] U-]Photographs Page 192 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet. i of 4 Status:- Y[K Nil] U[]Seismic Walkdown Checklist (SWC)Equipment ID No. 1T46-DOOIA Equip. Class' 10 Equipment Description SBGT FILTER TRAIN Location:

Bldg. REACTOR Floor El., 158 Room, Area Standby Gas Tank Room Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YI- NZ 2. Is the anchorage free of bent, broken, missing or loose hardware?1 of the 16 bolts on the single train anchorage is too short, does not go through the nut completely.

The equipment is wide and heavy, therefore little or no tension load is anticipated in the anchor bolts.Remaining bolts on the same side of the equipment are adequate to take any shear if needed. Therefore, the SWEs judged that the overall equipment anchorage is seismically adequate.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent With plant.documentation?(Note: This question only applies if the item isone of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage:

evaluations, is the anchorage free of potentiallyadverse seismic conditions?

YZ NO U[- N/AEl YED NEI UD- N/A-D YZ NEI UD- N/AE!YO] N[D U- N/AZNO UDU I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 193 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 4 Status:: YM NO-] U[]Seismic Walkdown Checklist (SWC)Equipment ID No. 1T46-DOOIA

-Equip.,I Equipment Description SBGT FIL TER, TRAIN Interaction Effects 7. Ate soft, targets free from impact by nearby equipment or structures?

YN NEII UE1 N/AEl 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YI N[-] UI- N/AOl and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, .is~equipment free of potentially adverse seismic interaction effects?YN NEI UFJ N/AEl YN NO UEl Other Adverse Conditions
11. Have you looked for and found no other seismic conditionsthat-could YZ NEI Ul adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

None Evaluated by: KURSAT KINALI mýAi Date: 9/7/2012 9/712012 MIKE STEELE Page 194 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)Equipment ID No. 1T46-DOOIA Equip. Class, 10 Equipment Description SBGT FILTER TRAIN NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: YN N[I] UE]Photographs Page 195 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 4 Page 196 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 7 Status: YEI NE Uf-]Seismic Walkdown Checklist (SWC)Equipment ID No. 1Z41-BOO8A Equip. ClassL-1-r-PRJc lVc,/zo12.

Equipment Description BOO3A CONDENSING UNIT Location:

Bldg. CONTROL Floor El. 180 Room, Area CONTROL BUILDING ROOF Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraae 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?There are compression washers and double nuts missing at the south side of 1Z4 1-BOO8A (see photographs 3 and 4). The missing hardware is on the outer portion of the support pedestal.

The inside hardware is presenL The unit is supported vertically by the pedestal and the inside connections prevent uplift and vibration mitigation as intended.

It is judged to be seismically adequate, however, the redundancy of the second hardware set should be replaced.

CR 525669 has been written to replace the missing hardware.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Vendor drawing SX-19845, Rev. I was used to assist in the consistency check during the walkdown.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

See response to question 2.Y-I NO Y[" NO U[' N/AD3 YIR NDI UD1 N/AD YN NEI U" N/AD YO NEI UDI N/AO YDI NO UO 1Enter the equipment class name from Appendix B: Classes of Equipment.

Page 197 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 7 Status: YE] NED U[]Seismic Walkdown Checklist (SWC)P.JC It./to/zon-Equipment]DNo.

1Z41-BOOBA Equip. Class, 2 II Equipment Description BOO3A CONDENSING UNIT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

YN NE UD N/AO 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y0 NE] U[] N/A[-and masonry block walls not likely to collapse onto the equipment?

A steel frame around the perimeter of 1Z41-BOO8A supports an insulated pressure root pipe (see photograph 5). The steel frame is judged to be adequate to prevent the pipe from falling on the equipment.

9. Do attached lines have adequate flexibility to avoid damage? Y[ NEI U] N/Al]10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YO NEOIUl Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y0 NOl Ul]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Per SQUG A-46 outlier recommendations, grout was installed in bolt sleeve as verified during walkdown.See 1P41-F422B for AWC information.

Evaluated by: Juan Vizcaya Patrick Kelly Date: 09/2612012 09126/2012 Page 198 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 7 Status: YCi NZ Uf Seismic Walkdown Checklist (SWC)EquipmentIDNo.

1Z41-BOO8A Equip.

4 iI k, Equipment Description BOO3A CONDENSING UNIT Photographs 1: Equipment MPL # (1Z41-BO08A)

Page 199 of 436 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 7 2: Equipment Elevation (1Z41-BO08A)

Page 200 of 436