ML12355A050

From kanterella
Jump to navigation Jump to search
SNCH082-RPT-01, Ver. 1.0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 11
ML12355A050
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/26/2012
From: Stewart W
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-12-2268 SNCH082-RPT-01, Ver. 1.0
Download: ML12355A050 (53)


Text

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 6 Status: Y[ N[-] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. IR l1-S004 Equip. Class,.4 Equipment Description 575-120/208VAC XFMR ID....

Location; Bldg. DIESEL Floor El. 130 Room, Area SwitchcqearRoom IE Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be. used torecord the results of judgments: and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y0 NE of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YI NO U- N/AEl
3. Is the anchorage free of corrosion that is more than-mild surface, YN NEI UOZ N/AEl oxidation?

There is mild surface oxidation on the welds. Since oxidation is only on the surface, the welds are not degraded. Therefore,judged not to be a concern.

4. Is the anchorage, free of visible cracks in the concrete near the anchors? YN NEI UO N/AI-
5. Is the anchorage configuration consistent with plant documentation? Y19 NEI UI N/AU (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SEWS Package JR]I-S004 (dated 10/20/88) andCalculation SCNH-98-070 Rev. 0

6. Based on the above anchorage evaluations, is the anchorage free of YN NO UU potentially adverse seismic conditions?

This. component has been inspectedto the extent practical. All visible anchors, hardwareand surfaces were inspected. The anchoragefor this item is visible without openingthe component. To inspect the componentfurther would require disassembly. Since the anchorageis visible, the inspection meets the requirements of the guidance document.

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 40 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet6 of 6 Status: Y-'.Ný] ,UI--l Seismic Walkdown Checklist (SWC)

Equipment ID No. IRTI-SO04 Equip. Class, Equipment Description 575-1i20208VAC XFMR 1D Interaction Effects

7. Are soft trgetsI fee from impact by nearby equipment or structures? Y NEi UE N/AE3
8. Are overhead equipment, distribution Systems, ceiling tiles and lighting. YZ NEI UE1 N/AE0, and mas'hnry:block walls not likelyto collapse onto the equipment?:
9. Do attached.lines have adequate flexibi.ity.toavoiddnage? ytR, Nr;,VOr-AO.:i[]

There:is a 2" conduit approximately 1/16'from the transformier. The, conduit.is rigidly Iattached'to.the transformjervandis supportedfrom the wall,above the transformer,so: the conduit andthe transformerwill move together, so there will not be any differentialmovement.

Therefoire, there is5 no potentially adverse seismic:condition.

YN NEI UE/

10. Based on the above seismicinteraction evaluiations, is equipment free of potentially adverse seismicinteraction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI U adversely affect the, safety fu* ction s of the equipment?

£omments (Additional pages may be added as necessary)

See Component1R24-SO25 for Area Walk-by Checklist.

Evaluated by: John.McFadand" Date: 09/24/2012:

JeffHotton 09/24/2012 Page 41 of 436

Cl)

U

.- 1 T Ii 5. 0.

U 0

-4

-4 0

C U.

03 0Z 0

T ~ri CD Q*

N) Cl)

U)

G) z 0

cn r-t-(A zr m

CA Li

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 6 Figure 2 - Equipment Elevation (IRI I-S004)

Page 43 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 6 Figure 3 - Surface Oxidation at Welds (I RI 1-S004)

Page 44 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of 6 Figure 4- Gap Between Transformer and Conduit (IRI 1-S004)

Page 45 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet i of 5 Status: YM NO] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No., IRII-S039 Equip. Class2 EquipmentiDescription 45KVA 600-120/208V XFMR Location: Bldg.. REACTOR Floor El. 130 Room, Area RIO9A Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the fOllowing questions may be used torecord the results of judgments and findings. Additional space is providedat the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI UE N/AD]
3. Is the. anchorage free of corrosion that is more than mild surface YN NEI UL-J N/AE3 oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI UE! N/Al]
5. Is the anchorage configuration consistent with plant documentation? Y9 NEI UEI N/Al]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SEWS package (datedlO2611988) supplied anchoragedetails

6. Based on the above anchorage evaluations, is the anchorage free of YV NCi UEi potentially adverse seismic conditions?

This component has been inspected to the extent practical. All visible anchors, hardwareand surfaces were inspected. The anchoragefor this item is visible without opening.the component.

To inspect the component further would requiredisassembly. Since the anchorageis visible, the inspection meets the requirementsof the,guidance document.

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 46 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 5 Status: YE N[-] Ul-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. iR11-S039 Equip. Class' 4 Equipment Description 45KVA 600-120/208VXFMR Interaction,Effects

7. Are soft targets free, from impact by nearby equipment or structures? YN ND UOL N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN ND UD N/AD and masonry block walls not likely to. collapse onto the equipment?
9. Do :attached lines have adequate flexibility to avoid damage? YZ NDI UD N/AD There is a 2" dia. RGS conduit which spans vertically from transformer 1R1 1-S039, sweeps North and then descends.to MCC 1R24-S01 1. It is supported with a "U" shapedconnector to the cable tray above. It is determined tohave adequate flexibility in its length and available support. It is judged to be seimically adequate. See photograph3.
10. Based on the above seismic interaction evaluations, is equipment free YZ NO UO of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic, conditions that could YZ NDI U[]

adversely affect the safety functions, of the equipment?

COmments (Additional pages may be added as necessary)

See Area Walk-By Checklist (AWC) for 1R24-S01 1 for notes applicableto this component's AWC.

Evaluated by: Juan Vizcava Date: 09/05/2012 U'

Patrick Kelly 09/05/2012 Page 47 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 5 Status: YN N[- U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. IRI 1-S039 Equip. Class, 4 Equipment Description 45KVA 600-120/208V XFMR Photographs 1: Equipment MPL# (IRI 1-S039)

Page 48 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 5 2: Equipment Elevation (IR1 1-S039)

Page 49 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 5 3: Conduit Between IR1I-S039 and 1R24-SO01 (IRI 1-S039)

Page 50 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet:i of 7 Status: YN NE] U[]

Seismic Walkdown Checklist (SWC)

EquipmentID No. 1RIl-S041 Equip. Class' 4 Equipment Description 600-1201208VAC XFMR 1B Location: Bldg. CONTROL Floor El. 130 Room, Area Room C112 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions maybe used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN NEI of the 50% of SWEL items requiring such verification)?

This component has been inspected to the extent practical. All visible anchors,hardware andsurfaces were inspected. The anchoragefor this item is visible without openingthe component. To inspect the componentfurther would require disassembly. Since the anchorageis visible, the inspection meets the requirements of the guidance document,

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI U[" N/Al]

There is a loose nut on the back left anchor boltfor the transformer.

This condition is addressedandfound to be acceptable in the referencedSEWSpackage, so there is no potentially adverse seismic condition.

3. Is the anchorage free of corrosion that is more than mild surface YZ NI U0I N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the a~nchors? YZ NO Ul] N/AE
5. Is the anchorage configuration consistent with plant documentation? YZ NEI UE1 N/AU3 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SEWS Package JRll-S041 (dated 10/18/88)

6. Based on the above anchorage evaluations, is the anchorage free of YN N[] UU" potentially adverse seismic conditions?

There are holes in the top of the front transformercase that do not have screws. The, holes are drilledby the manufacturerto provide optionsfor thefront panelplacement andtarenot used in the current configuration. There are no missingscrews, so there is no potentially adverse seismic condition.

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 51 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 7 Status: YN N[] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1R6I-S041 Equip. Class' 4 Equipment Description 600-120/208VAC XFMR1B Interaction Effects 7.- Are soft targets free from impact by nearby equipment or structures? YI N[I U-] N/AU 8.. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NiO U"] N/A]

and masonry block walls not likely to collapse onto the equipment?

The seismic capacity of the Concrete Block Walls C130-9A and C130-11B, surroundingthe Transformer were verified using DrawingH-40383 Rev. 2 and Hatch Unit 2 UFSAR Table 3.8-20.

9. Do attached lines have adequate flexibility to avoid damage? YN Ni] U-] N/AU
10. Based on the above seismic interaction evaluations, is equipment free Y0 NO U-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ N[-] UL adversely affect the safety functions of the equipment?

Comments (Additional pages may beadded as necessary)

There is a coil of rope left behind transformer JRI-S041 (CR 524319). The rope is relatively light and is not close to anything except the angle supportsfor the transformer,but not the transformer itself,so there is no potentiallyadverse seismic condition. The rope shouldbe moved to the equipment storage areaset up on the other side of the room.

Evaluatedby:John McFarland Date: 09/25/2012 Jeff Horton 09/25/2012 Page 52 of 436

00 Co 0

m H

CD CD ~5.

.4 .4 Cl)

U m

0.

0

.4 C~ -~

C) z 0

Nj m

S F. Cl)

I-i C) C) 0n CD c-n

.0 C.)

z0 z

C) 00 Mi r+~

6 m

0 0

z ZI ,0,

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 7 Figure 2 - Equipment Elevation (1RI I -S04 1)

Page 54 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 7 Figure 3 - Loose Anchor Bolt Nut (I R 1-S041)

Page 55 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of 7 Figure 4- Holes in Transformer Cover Panel (IPR1 1-S041)

Page 56 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 7 of 7 Figure 5 - Abandoned Rope Coil (I R1 1-S041)

Page 57 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet I of 3 Status: YZ N-] U[]

Seismic Walkdown Checklist (SWC)

Equipment IDNo. 1SIl-S009 Equip. Class' Equipment Description 4160/600V STA SERV XFMR 1F Location: Bldg. DIESEL FloorEl. 130 Room, Area, SwitchqearRoom 1F Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may beused to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraoe.

1. Is the anchorageconfiguration verification required (i.e., is the item one YK NEI of the 50% of SWEL items requiring.such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI UI-I N/AU
3. Is the anchorage free of corrosion that is more than mild surface YZ NO UED N/AUl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI UD N/AU
5. Is the anchorage configuration consistent with plant documentation? YED NEI Ul0 N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage was compared against SQUG package dated 10/22/88.

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI UE3 potentially adverse seismic conditions?

' Enter the equipment class name from Appendix B.:Classes of Equipment.

Page 58 of 436

  • ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2"of 3 Status: YC N]RU[]

seismic Walkdown Checklist (SWC)

,EquipmenntjD No. ISIL-S009 Equip.,

Equipment Description 4'1601600V STA SERV XFf iF1.

IR Interaction Effects

7. Are soft targets free from impact by nearby equipment or.structures? ýY0 NIl UO WN/AM
8. Are overhead equipment; distribution systems,cei.ing-tiles and lighting, Y[@ NEI U!] MN/AO and masonry block*wallsnot likely to collapseonto the equipment?

9.. Do attached lines have adequate .flexibility to avoid damage? Y0 NE] U0 N/AD 10.. Based on the above seismic interaction evaluations, is equipment free Y(@ NUCIU of potentially adverse seismic interaction effects?

Other Adverse Conditions j11..Have you looked'forand found noother seismicconditions thatcould Y01 NEI WUt adversely. affect the. safety functions of the equipment?

Comme~nts(Additional pages may be added as necessary)

This component has been inspected to the,:extent practical.. All visible anchors,:hardwareand surfaces were inspeoted. The anchoragefobr this: item is visible Without: opening the component. To inspect the component further would requiredisassembly. Since the anchorageis visible, the inspection~meets the requirements of the guidance document.

Evaluated by: WESLEY W S - Date:' 9/12/2012 KURSA T KINALl 9 12212. ___

Page 59 of 436

ATTACHMENT 3: SEISMIC WALKOOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 3 Status: Y* NM] U[]

Seismic Walkdown Checklist (SWC)

Equipment IDNo. ISI 1-S009 - Equip. Class1 Equipment Description 41601600 V STA SERV XFMR 1F Photographs Page 60 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet i of 5 Status: YM N[] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. ISI 1-SO12 Equip. Class, Equipment Description 4160/600V STA SERV XFMR If-2 Location: Bldg. DIESEL Floor El. 130 Room, Area Switchgear IF Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the endof this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YED NEl of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or lOose hardware? YN NEI UE]- N/AL The back cover of the equipment has a screw which is not fully engaged. SWEs judged this not to be a seismic concern due to the presence of multiple screws in the back.
3. Is the anchorage free of corrosion that is more than mild surface YZ NI Ut] N/AL]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? Y21 NEIl UI- N/AID
5. Is the anchorage configuration consistent with plant documentation? YN NEI U[] N/Al]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

The anchoragewas checked against.Dwg..B-43471 Sh. 1, Rev. 0. The item was an IPEEE outlier. SWEs confirmed that the improvements shown in Dwg. B-43471 were made to the anchorage of this item per DCR 90-011 dated 12/31/91.

6. Based on the above anchorageevaluations, is the anchorage free of YZ N[3 U[]

potentially adverse seismic conditions?

1 Enter the equipment class name from Appendix B: Classes o.f Equipment.

Page 61 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2of 5 Status:, Y N[] U[]

Seismic Walkdown Checklist (SWC)

EquipmentiDoNo. IS11-SO12 Eqip. Classe Equipment Descrip~tion 41601660V STA SERVXFMR 11Z Interaction Effects'

7. Are' soft targets free from impact by nearby equipment or structures?; Y0c NE150 N/AE]
8. Are overhead'equipmnent, distribution systems, ceiling tiles andiAighting, Y[ N 10 N!AL]

U and masonry block-walls not likely to collapseonto the equipment?

9. Do attached lines have~adequate: flexibility to avoid damage? Y¥1* NO U-] N/AL]
10. Based onwthe above seismic interaction evaluations, is equipment free YZ NEI UE ofpotentially: adverse seismic interaction effects?

Other Adverse Conditions

11. Have you !ooked.for and found no.other seismic conditions that could Y1 NO .U50 adversely:affect.the safety functions of the equipment?

Comments (Additionalpages may be added asnecessary)

This comprnpiint has beeninspectedto the extent practical, All visible anchors,ha'i&vare and surfaces wereinspected. The anchoragefor this item-is visible without~openingthe component.. To1 inspect the.component further w'ould require disassembly. Since' the anhohrage is visible, the inspection meets the requirements of the guidance document.

See Component 1SH-S009for Area Walk-by Checklist.

Ev.atuated by: KURSAT KINALI k Date:; '9/26/2012, WESLEYý WILLIAMS /,~ 9/26/2012.

Page 62 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 5 Status: YN NEI U-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1SIl-S012 Equip. Class, Equipment Description 4160/600V STA SERV XFMR IF 2 Photographs Photographs Page 63 of 436

. ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 5 Page 64 of 436

4 ,. ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 5 Page 65 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 3 Status: Y NEI UlI Seismic Walkdown Checklist (SWC)

Equipment lD No. 1E41-COOI Equip. Class' 5 Equipment Description HPCI MAIN &BOOSTER PUMP Location: Bldg. REACTOR Floor El. 87 Room, Area HPCI Room Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI U-" N/AL]
3. Is the anchorage free of corrosion'that is more than mild surface YN NEI UEI N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI UE- N/AU-
5. Is the anchorage configuration consistent with plant documentation? YEI NE UE N/AO (Note: This question only applies if the item is one of.the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NE UE1 potentially adverse seismic conditions?

IEnter the equipmentclass name from Appendix B: Classes of Equipment.

Page 66 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 3 Status: YZ Nn] UI-Seismic Walkdown Checklist (SWC)

Equipment ID No. IE41-COOl Equip. Class]

Equipment Description. HPCI MAIN & BOOSTER Pump Interaction Effects

7. Are soft targets free. from impact by nearby equipment or structures? YN NilI U[] N/AD]
8. Are, overhead equipment, distribution systems, ceiling tiles and lighting, Ys ND] Ur] N/AIZ and masonry block walls not likely to collapse onto the equipment?
9. -Do attached lines have adequate flexibility to avoid damage? YN Nil U-1 N/AL]
10. Based on the above seismic interaction, evaluations, is equipment free Y19 NlO UI of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y9 Nil UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

None.

Evaluated by: KURSAT KINALI /4 a__ I )ate: 9110/2012 WESLEY WILLIAMS V 9/110/2012 Page 67 of 436

ATTACHMENT 3: SEISMIC WALKODOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 Of 3 Status: Y[ N[-] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1E4 1-CO0l Equip. Class, Equipment Description HPCI MAIN & BOOSTER PUMP Photographs Page 68 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet i of 6 Status: YN NE] U-]

Seismic Walkdown Checklist (SWC)

Equipment lID No. 1E51-COOI . Equip. Class' Equipment Description RCIC Pump Location: Bldg, REACTOR Floor El. 87 Room, Area SWDia-gonal Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing, Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions, may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.eý., is the item one YED NEl of the 50% of SWEL items requiring such verification)?
2. Is the. anchorage free of bent, broken, missing or loose hardware? YN NE UO N/AE]

The thread engagement on the southeast bolt of the pump support shows approximatelyone threadexposed above the nut rather than the minimum of two threads (see Figure3). The SWE's have judged that there is sufficient thread engagement between the bolt and the nutfor seismic restraint.

3. Is the anchorage free of corrosion that is more than mild surface Y0 NE UE, N/AE oxidation?

4ý Is the anchorage free of visible cracks in the concretenear the anchors? YZ NEI UE[ N/A[]

5. Is the anchorage configuration consistent with plant documentation? YN NEI UE- N/AE1 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required,)

DrawingS15415A (Dated08/25/70)

6. Based on the above anchorage evaluations, is the anchorage free of YI NEI UE-potentiallyadverse seismic conditions?

1Enterl the equipment class name'from Appendix B: Classes of Equipment.

Page 69 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of.6 Status:: YZ N[-] UE-]

Seismic Walkd'own Checklist (SWC)

Equipment ID No.. 1E51-COOI _ Equip. Class1 Equipment Description RCIC Pump Interaction Effects

7. Are soft targets free, from impact by nearby equipment or structures? YN NEI UD N/AD
8. Are overheadequipment, distributionsystems, ceiling tiles and lighting, Y- ND UD* N/AD and masonry block walls not.likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NDI UD N/AD-
10. Based on the above seismic interaction evaluations, is equipment free Y! NO U-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZý NDI U1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

There is a small accumulation of grayish-whitepowder on the northwest section of the concrete padof the pump support (seeFigure 4). The powder is most likelyfrom the insulationofpipes above,the pump pad and isjudgedto not be a concern.

Evaluated by: John McFarlan Date: 09106/2012 Jeff Horton 09/06/2012 Page 70 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 6 Status: YI N] U"-

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1E51-C001 Equip. Class' 5 Equipment Description RCIC Pump Photographs Figure 1 - Equipment ID No (IE51-COO1)

Page 71 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 6 A

Page 72 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 6 Figure 3 - Bolt Threads Above Nuts (1E5 1-C001)

Page 73 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of 6 Figure 4 -Powder Residue on Concrete Pad (IE51-COO0)

Page 74 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 4 Status: YZ Nn UL-Seismic Walkdown Checklist, (SWC)

Equipment ID No. 1E21-COOIB .Equip. Class' Equipment Description Core Spray Pump B Location: Bldg. REACTOR Floor El. 87 Room, Area NE Diagonal Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist.for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YNI NO U-IJ N/AU
3. Is the anchorage free of corrosion that ýis more than mild surface YI NO UO'I N/AU1 oxidation?

4., Is the anchorage free of visible cracks in, the concrete near the anchors? YZ NO UEJ N/AU

5. Is the: anchorage configuration consistentwith plant documentation? Y, NO U- N/A[

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

DrawingH-15138 Rev. 6

6. Based on the above anchorage evaluations, is the anchorage free of YZ NJ UUU potentially adverse seismic conditions?

I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 75 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCHO82-RPT-01, VERSION 1.0 Sheet 2 of 4 Status: YZ, NO] Ui-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1E21-COOB - Equip. Class'5 Equipment Description Core Spray Pump B Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y0 NEil U] N/AU-
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NEI UU- N/Ar-and masonry block walls,not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y0 NEI UD' N/An
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UE, of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y19 NDil UL1 adverselyaffect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

None Evaluated by: John McFarland Date: 09/12/2012 Jeff Horton 09/12/2012 Page 76 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: YZ N[-] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1E21-COO1B Equip. Classý Equipment Description Core Spray Pump B Figure 1 - Equipment ID No (1E21-COO1B)

Page 77 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 4 Figure 2 - Equipment Elevation (1 E2 l-CO01 B)

Page 78 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 4 Status: YN N[-] UM]

Seismic Walkdown Checklist (SWC)

Equipment ID No, 1C41-C001A Equip. Class' 5' Equipment Description SBLC INJECTION PUMPA Location: Bldg. REACTOR FloorEl. 203 Room, Area R413 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the. end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YI NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI US N/All
3. Is the anchorage free of corrosion that is more than mild surface YN NEI US- N/AS oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI US- N/AS
5. Is the anchorage configuration consistent with plant documentation? Y[ NEI US- N/AS-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage was compared againstdwg HI-1 5367 Rev. Il dated 2/19/71.

6. Based on the: above anchorage evaluations, is the anchorage free of VER NO US-potentially adverse seismic conditions?

I Enterthe equipment class name from Appendix B: Classes of Equipment.

Page 79 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 4 Status: YN NEI U[]

Seismic Walkdown Checklist (SWC)

Equipment ID) No. 1C41-COO1A - Equip. Class, Equipment Description SBLC INJECTION PUMP A Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UD] N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yo NEI U- N/ADl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y23 NDI UD N/AD
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UD of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ ND UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

None.

Evaluated by: Kursat Kinali Date: 9/6/12 Wesley Williams 4 .4- 9/6/12 Page 80 of 436

  • ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: YN NE] ur]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1C41-COOIA Equip. Class, Equipment Description SBLC INJECTION PUMP A Photographs Page 81 of 436

,* ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 4 Page 82 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 7 Status: YZ N-' U-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. _1C41-CO01B Equip. ClassI 5 Equipment Description SBLC Injection Pump B Location; Bldg. REACTOR Floor El. 203 Room, Area Stand By Liquid ControlArea (RH-R3)

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be, used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.,

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI UI0 NIAll]

The thread engagement on the southwest bolt of the pump support shows approximatelyone threadexposed above the nut ratherthan the minimum, of two threads. The SWE's have judged that there is sufficient threadengagement between the bolt and the nut for seismic restraint,so there is no potentiallyadverse seismic condition.

3. Is the anchorage free of corrosion that is more than mild surface YN NEI UEl N/AU-oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI U[J N/AEl
5. Is the anchorage configuration consistent with plant documentation? YN NEIl UE- N/AUI (Note: This question only applies if the item is one of the:50% for which an anchorage configuration verification is required.)

DrawingH-15367 Rev. 11

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI UE]

potentially adverse seismic conditions?

Enter the equipment classname from Appendix B: Classes of Equipment.

Page 83 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 7 Status: YN Nn] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1C41-COOIB Equip. Class, Equipment Description SBLC Injection Pump B Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI U[Z N/A-
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI Ur' N/AZ and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y0 NEI Uil N/AD
10. Based on the above seismic interaction evaluations, is equipment free YU NEI U-1 of potentially adverse seismic. interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that~could Y! NEI U0 adversely affect the safety functions of the equipment?

There are several threadedholes in the pump frame that do not have anchorbolts. Based on a.review of the frame and Drawing,H-1 5367 Rev. H1, it is determinedthat the holes arefor lifting lugs, and that.no anchorsare missing. Therefore, there is no potentiallyadverse seismic condition.

Comments (Additional pages may be added as necessary)

There is an oil absorbenttowel left loose on thefloor inside the knee wall near the ladderaccess to the pump. The towel is very small and light, and is located in the concrete trench aroundthe pump area,so there is no potentialfor the towel to have any impact on nearby equipment. Therefore, the SWEs havejudged that there is no potentially adverse seismic condition, See Component 1C41-CO01Afor Area Walk-by Checklist.

Evaluated by: John McFarlandtýý Date: 09/12/2012 Jeff Horton 09/1212012 Page 84 of 436

ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 7 Status: YO Nn] U[]

Seismic Waikdown Checklist (SWC)

Equipment lID No. 1C41-COO1B Equip. Class, Equipment Description SBLC Injection Pump B Photographs Figure 1 - Equipment ID No (1C41-COOIB)

Page 85 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 7 Figure 2 - Equipment Elevation (1C41 -COOI B)

Page 86 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 7 Figure 3 - Bolt with One Exposed Thread (IC4I-COI0B)

Page 87 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of 7 Figure 4- Lifting Lug Location (1C41-COO1 B)

Page 88 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 7 of 7 Figure 5 - Loose Absorbent Towel (1C41-C001 B)

Page 89 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 3 Status:. YZ NE1 U[-]

Seismic WalkdOwn Checklist (SWC)

Equipment ID No. 1E41-C002-3 Equip. Class' 5 Equipment Description HPCi TURB AUX OIL PUMP Location: Bldg.. REACTOR Floor El. 87 Room, Area HPCI Room Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist-may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification requited (iLe., is the item one YN NEl of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NE ULJ N/AUl
3. Is the anchorage freeof corrosion that is more than mild surface YZ NEI Ur- N/AU oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YI NE UD[ N/AU
5. is the anchorage configuration consistent with plant documentation? YC9 NE UD N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required)

Anchorage was compare againstSQUG Package (it was not dated).

6. Based on the~above anchorage evaluations, is the:anchorage free of potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classesof Equipment.

Page 90 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCHO82-RPT-01, VERSION 1.0 Sheet 2 of 3 Status: YM Nn-] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID E No. E41-Cc02-3 Equip. Class Equipment Description. HPCI TUR8 AUX OIL PUMP Interaction Effects

7. Are soft targets free from impact.by nearby equipment or structures? Y21 Ni] U- N/A"
8. Are overhead equipment,: distribution systems, ceiling tiles and lighting, Yo N'] U'- N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YIN N] U[-] N/AU

.10. Based on.the above seismic interaction evaluations, is equipment free YN NEI Ur of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and, found no other seismic conditions.that could Y0 NE] U-]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Walk-by was completed with componentpackage 1E4 1-COO 1.

Evaluated, by: Wesley-William AA,2 Ii Date:, 9/10/12 Kursat Kinali~i _.,.

9/10/12 Page 91 of 436

  • ATTACHMENT 3: SEISMIC WALKODOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 3 Status: Y0 Nn- Ur]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1E41-C002-3 ,Equip. C Equipment Description HPCI TURB AUX OIL PUMI p Photographs Page 92 of 436