ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)

Equipment lID No. 1T48-NOO9A Equip. Class, Equipment Description TORUS WATER TEMP ELEME NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1of 4 Status: Y* NF-UI"J VT Location: Bldg. REACTOR Floor El. 87 Room, Area TORUS (BAY 1)

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Equipment is inline mounted to the Torus.

2. Is the anchorage free of bent, broken, missing or loose hardware?

Equipment is welded at penetration 1 T23-209A.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YEI NZ Y[0 NEI U-] N/AL]

YS N[I] U-N/AE]

YL] NE UI-N/A[

YEI NEI UII N/AS YZ NO U]

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 325 of 436

ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)

Equipment ID No. I T48-NO09A Equip. Class, Equipment, Description TORUS WATER TEMP ELEMOt NO. SNCHO82-RPT-01, VERSION 1.0 Sheet 2 Of 4 Status: Y0 NEI U[-]

IT Interaction Effects

7. Are soft targets-free from impact by nearby equipment or structures?

YZ NEI UIZ N/AI1:

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y9 NEI UlE N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?

There are. flex conduits from the equipment to the junction box mounted to the floor.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y0 NO UEr N/A-3 Y[

NO UE1 Other Adverse Conditions 1l.L Have you looked for and found no other seismic conditions that could Y0 NEI UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

None.

Evaluated Date: 09/27/2012 Patrick Kelly 09/2-7/2012 Page 326 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: YZ N[-] U0-Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T48-NOO9A Equip. Class' 19 Equipment Description TORUS WATER TEMP ELEMENT Photographs 1: Equipment MPL # (1T48-NO09A)

Page 327 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 4 2: Equipment Elevation (1T48-NO09A)

Page 328 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 5 Status: Y* NR] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T41-NO20A Equip. Class' 19 Equipment Description CS/RHR Pump Room Cooler TE Location: Bldg. REACTOR FloorEl. 110 Room, Area SEDiagonal Manufacturer,'Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraie

1. Is the anchorage configuration verification required(i.e., is the item one ofthe 50% of SWEL items requiring such verification)?

YO-N

2. Is the anchorage free of bent,, broken, missing or loose hardware?

The component is welded to a wide flange beam, so there is no anchorage.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

There is mild surface oxidation on the two top welds. Since oxidation is only on the surface, the welds are not degraded. Therefore, judged not to be a concern.

4. Is the anchorage free of visible cracks in the concrete near the anchors?

The component is welded to a wide flange beam, so there is no concrete.

5. Is the anchorage configuration consistent with plant documentation?

(Note: This question.only applies if the item, is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YE] NEI UI-N/AI YN NE] UE-N/A-'

YE] NiO UE] N/AZ YE] NEI UE-N/AO YO NEI Ui I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 329 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 5 Status: Y] N[-] U[].

Seismic Walkdown Checklist (SWC)

EquipmentID No. IT41-NO20A Equip. Class,]

Equipment.Description CS/RHR:PumoP Room Cooler TE Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

YN NEl UL-- N/AU

8. Are overhead equipment, distribution systems, ceiling'tiles and lighting, YN Ni] UI1 N/Al]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have:adequate flexibilityto avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free

.of potentially adverse seismic interaction effects?

YZ NI] UI1 N/Al]

YI NEl UEJ Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[

NEI-UEJ adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

See Component 1 T41-BOO2A for Area Walk-by Checklist.

Evaluated by: John McFarland Jeff Horton Page 330 of 436 Date: 0912612012 09/2612012

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 5 Status: YZ N[] UR-Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T41-NO20A Equip. Class' 19 Equipment Description CS/RHR Pumn Room Cooler TE Photographs Figure 1 - Equipment ID No (IT41-N020A)

Page 331 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 5 Figure 2 - Equipment Elevation (1T41-N020A)

Page 332 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 5 Figure 3 -Mild Surfaee Oxidation (IT41-NO20A)

Page 333 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet I of 5 Status: YN N-] UI-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T41-NO21A Equip. ClassW 19:

Equipment Description CS/RHR Pump Room Cooler TE, Location: Bldg. REACTOR Floor El. 114 Room, Area NE Diagonal Manufacturer, Model,. Etc. (optional but recommended)

Instructions for Completing Checldist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora e

1. Is the anchorage configuration verification required (i.e,, is the item one of the 50% of SWEL items requiring such verification)?

YE NZ

2. Is the anchorage free of bent, broken, missing or loose hardware?

The component is welded to a wide flange beam, so there is no anchorage.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?

The component is welded to a wide flange beam, so there is no concrete.

5. Is the, anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is: required.)

6. Based on the above anchorage evaluations, isthe anchorage free of potentially adverse seismic conditions?

YE NEI UE1 N/A9 Y0 NEI UE1 N/AEl YE NE UE-N/AI YEi NE UE] N/AN YZ NEI UE-I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 334 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 5 Status: Y1Z NO U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T41-NO21A Equip. Classi Equipment Description CS/RHR Pump Room Cooler TE Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

YN N[I U[] N/AL]

Theflexible line coming from the component is close to a flex conduit running to a nearby Unistrut support. Both lines are small and light and wellsupported at both ends. The 1 " gap between the lines is judged to be sufficient to prevent impact between the lines, so there is no potentially adverse seismic condition.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y8 NEI U-' N/AL]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?

YN NEl UF] N/AL]

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YZ NEI UEj

.Other Adverse Conditions 1. Have you looked for and found no other seismic conditions that could YN NEL Ur]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

None Evaluated by: John McFarland Jeff Horton Date: 09/26/2012 09/26/2012 Page 335 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 5 Status: YN NEI UEI Seismic Walkdown Checklist (SWC)

Equipment ID No. IT41-NO21A Equip. Class' 1g Equipment Description CSIRHR Pump Room Cooler TE Photographs Figure 1 - Equipment ID No (1T4 1-N02 IA)

Page 336 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 5 Figure 2 - Equipment Elevation (1T41-N02IA)

Page 337 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 5 Figure 3 -Gap Between Flexible Lines (iT41-NO2I A)

Page 338 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet i of 4 Status: YZ NR UE]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T41-N022A Equip. Class, 19 Equipment Description RCIC Pump Room Cooler TE Location: Bldg. REACTOR Floor El. 87 Room, Area SW Diagonal Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each.of the following questions may be used to record the results ofjudgments and findings. Additional. space is provided at the, end of this checklist for documenting other comments.

Anchoraige 1..Is the anchorage configuration verification required (i.e., is the item One of the 50% of SWEL items requiring such verification)?

Y[I NO

2. Is the anchorage free of bent, broken, missing or loose-hardware?
3. Is.the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?

The component is: welded to a steel beam and has no anchor bolts.

5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based. on the above anchorage evaluations, is the anchorage free of potentiallyadverse seismic conditions?

YZ NEI-UE1 N/AD YZ NEI U'- N/AU-YO NEI UE" N/AU YU NO U" N/As Y* NU uU I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 339 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 4 Status: YN N-] U-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T41-NO22A Equip. Class' Equipment, Description RCIC Pump Room Cooler TE Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Y0 NI] UF] N/AOl

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YED NiO UU] N/AF1 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction, evaluations, is equipment free of potentially adverse seismic interaction effects?

YN NO U-] N/AO YZ NO U-Other Adverse Conditions

11. Have you looked, for and found no other seismic conditions that could YN NI U[-O adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

See Component JE51-CO01 for Area Walk-by Checklist. Component 1T41-NO22A is hung on the south wall at approximately the 102' elevation rather than on the northeast wall as indicated on drawing H-16240. CR 515915 has been issued to revise, the subject drawing to indicat the correct location of the instrument.

Evaluated by: John McFadand Jeff Horton 4141,1-Date: 09/06/2012 09/06/2012 Page 340 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: YE NE] Ur-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T41-N022A Equip. Class, Equipment Description RCIC Pump Room Cooler TE Photographs Page 341 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 4 Figure 2 - Equipment Elevation (1T41-N022A)

Page 342 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO, SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 7 Status: YZ Ns] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1H21-P173 Equip. Class" Equipment Description SHUTDOWN INSTRUMENT PAiNEL Location: Bldg. REACTOR Floor El. 130 Room, Area 109A Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each, of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchoragezconfiguration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Panel opened per work order SNC426989.

2. Is the anchorage free of bent, broken, missing or loose hardware?

3.- Is the anchorage free of-corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage is consistent with SEWS package dated 10/26/11988.

Originally identified as an A-46 and IPEEE outlier due to an unsecured file cabinet located next to panel. Walkdown verified that the file cabinet was no longer located near panel,

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YN NEI YN NE] UE-N/AL]

YN NE] U[- N/At]

YZ NE] UE-N/AE]

YZ NEI Ut] N/AD1 YI NE1 UEJ

'Enter the~equipment class name from Appendix B: Classes of Equipment.

Page 343 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 7 Status: YZ NE-] U-]

Seismic Walkdown Checklist (SWC)

EquipmentID No.

1H421-PM73 Equip. Classl Equipment Description SHUTDOWN INSTRUMENT PAiNEL Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?

A nut is missing for the U bolt on the grounding bar for conduit MC5153 which,frames into top of panel. Contact is being made between. the conduit and grounding bar and the conduit. This is not a seismic concern.

Conduit at northeast comer of panel at top is not fastened to the grounding bar. This is not a seismic concern.

There is a cantilevered strut support which is unused (see photograph 3). It is very close to the. conduits coming out of panel, which could impact them during a seismic event. The conduit will protect the cables from being damaged and is not considered'a seismic concern. The spatial interaction is judged.to be seismically adequate.

1 0.. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y0 NO U-] N/AFI YZ NEI U] N/AL.

YZ NEI UO N/AD YZ NEI Ur Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZJ NiO UI-adversely affect the safety functions of the equipment?

Components inside panel were.inspected visually in accordance with the direction provided in the FAQ related to opening panels Comments (Additional pages may be added as necessary)

A box of lamps is stored inside the panel-(see photograph 4) and there are two loose screws lying on the concrete surface (see photograph 5). CR 520076 has been wirtten to resolve these issues.

Evaluated by: Juan Vizcaya Date: 09/18/2012 Patrirk Kfllv' 0911812'012 v........

Page 344 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 7 Status: YS NEI UF]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1H21-P173 Equip. Class' 20 Equipment Description SHUTDOWN INSTRUMENT PANEL Page 345 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 7 2: Equipment Elevation (1H21-P173)

Page 346 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 7 3: Strut Support Adjacent to Conduits (1H21-P173)

Page 347 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of 7 N*

4: Box Stored Inside Panel (IFH21-PI73)

Page 348 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 7 of 7 5: 2 Loose Screws on Concrete Surface (I H21 -P173)

Page 349 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 5 Status: YO NF-U--]

,Seismic Walkdown Checklist (SWC)

Equipment ID No. IH21-P202 Equip. Class, 20 Equipment DescriptiOn DG IC RELAY PANEL 1A Location: Bldg. DIESEL Floor El. 130 Room, Area SWITCHGEARROOM 1G Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklistfor documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Panel opened per work order SNC426989.

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4., Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the. 50% for which an anchorage configuration verification is required.)

Plate connection between 1R24-SO27 and 1H21-P202 is welded, not bolted. SEWS package dated 10/25/1988 allows either method.

Orginally identified as an A-46 and IPEEE outlier due to potential impact to adjacent panels. DCR 90-015 detailed plates to be installed

,to connect the top of 1H21-P202 to the adjacent panels. The walkdown verified these plates were installed.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YN NEI YO Ni UEZ N/AEl YID NEI UE1 N/AlZ YI NEI U-] N/Ar-YN NEI Ur1 N/AD YI NEI Uil I Enter the equipment class namefrom Appendix B: Classes of Equipment.

Page 350 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 5 Status: YN NE] U[-]

Seismic Walkdown Checklist (SWC)

Equipment ID No.

E H21-P202 Equip. Class:

Equipment Description DG. I C RELA Y PANEL 1A Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoiddamage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y10 NEI UED N/AE]

YZ NEI Ui N/A[-]

YI NO U-] N/AI-1 YO NEL UI]

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Hinge on door to panel'is detached from its connection (see photograph 3). The hinge is located at the middle of the door. There are two other hinges at the top and bottom that are, adequately secured. The two hinges is judged to be adequate to operate and support the door.

There are no relays attached to the door and the lightweight of the hinge will not cause any vibration to the panel toeffect relays. It is judged to be seismically adequate. CR 520072 has been written to reinstall the hinge.

Components inside panel were inspected visually in accordance with the direction provided in the FAQ related to opening panels.

YN NO UE]

Comments (Additional pages may be added as necessary)

See 1R24-S027 for A WC information.

Evaluated by: Juan Vizca a Patrick Kelly

(---

Date: 09118/2012 09/18/2012 Page 351 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 5 Status: YM NO] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1H21-P202 Equip. Class' 20 Equipment Description DG IC RELAY PANEL 1A Page 352 of 436 I

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of R 2: Equipment Elevation (1 H21-P202)

Page 353 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet j; of n 3: Damaged Hinge on Panel Door (iH21-P2o2)

Page 354 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet I of 7 Status: YN NE] U-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. lC82-P001 Equip. Class' Equipment Description REMOTE SHUTDOWN PANEL E51 Location: Bldg. REACTOR Floor El. 1582

ýRoom, Area 2R1103 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Panels opened per work order SNC426989.

2. Is the anchorage free of bent, broken, missing or loose hardware?

Anchorage consists of weldsrat base to embedded steel. Welds appear to have burned the panel material (see photograph 3), The burns did not completely go through the material. This is judged to be seismically adequate.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6, Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YEI NO YN NI] UE] N/AL]

YE NEI UI-N/AU]

YN NE] U"] N/AU YE] NEI UE-N/AZ Y0 NEI UE-

"Enter the equipment class name from Appendix B: Classes of Equipment.

Page 355 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0

'Sheet 2 of 7 Status: Y NO U[]

Seismic Walkdowni Checklist (SWC),

Equipment ID No. I C82-POOI Equip. Class' Equipment Description REMOTE SHUTDOWN PANEL E51 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Ceiling light overhead is properlyconnected and is not a seismic concern.

9. Do attached lines have adequate flexibility'to avoid damage?

10-. Based on the above seismic interaction evaluations, is equipment. free

,of potentially adverse seismic interaction effects?

Y19 NEI UI-N/A[l YZ NE, U[] N/AE YIZ NDEl U[] N/AEl YN NEI UE Other Adverse Conditions

11. Have you looked for and found no. other seismic conditions that could adversely affect the safety functions of the equipment?

PB1-511 is located insidepanel I C82-P001 and has three (3) screws missing at the top of the cover (see photograph 4). The cover is small in mass and the screws currently securing it in place are sufficient to hold it in place. It is judged to be seismically adequate. CR 520191 has been written to install the missing screws.

PBI-523 is located inside panel 1C82-P001 and has two (2) missing screws (see photograph 5). CR 520191 has been written to install the missing screws. The component is light weightand the existing screws are sufficient to hold it in place.

There is a fire extinguisher stored approximately l'-O" from the panel.

The extinguisher is supported from a wall support and the seismic accelerations are not sufficient to cause the extinguisher to falL It is judged to be seismically adequate.

Components inside panel were inspected visually in accordance with the direction provided in the FAQ related to opening panels.

Y23NEIUE1 Comments (Additional pages may be added as necessary)

None.

Evaluated by::Juan Vizcaya 7~17 Date: 09/18/2012 09/18/2012 Patrick Kelly F.

I Page 356 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 7 Status: YN Nn] UL-Seismic Walkdown Checklist (SWC)

Equipment ID No. 1C82-PO01 Equip. Class, 20 Equipment Description REMOTE SHUTDOWN PANEL E51 Page 357 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0

,hi-ePt A nf-7 2: Equipment Elevation (1C82-POO1)

Page 358 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 7 inmed from Welded Anchorage (1C82-POOI)

Page 359 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of 7 4: Missing Screws for PB1-511 (1C82-POO1)

Page 360 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 7 of'-

5: Missing Screws for PB 1-523 (1C82-POO1)

Page 361 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0

.Sheet 1 of 6 Status: YZ NE] UF]

Seismic Walkdown Checklist (SWC)

Equipment ID No. IR43-POOIC Equip. Class' 20 Equipment Description DG IC CONT PANEL Location: Bldg. DIESEL Floor El. 130 Room, Area DIESEL GENERATOR ROOM IC Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided, at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e.,. is the item one of the 50% of SWEL items requiring such verification)?

Panel opened per work order SNC426989.

2. Is the anchorage free of bent, broken, missing or loose hardware?

.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?

5, ;Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies: if the item is: one of the 50% for which an anchorage configuration verification is required.)

Anchorage is consistent With calculation SNCH-99-406, Rev. 0.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

The welds exhibited poor installation at the interior corner of the panel (see photograph 3). Calculation SCNH-99-406, Rev. 0 states a 2" and 2 1/2" long weld in this location. The actualflengths were longer than the lengths called out in the calculation. The additional capacity resulting from the longer length exceeds any potential reduction caused by poor installation. It is judged to be seismically adequate.

YE NEI YO NEI U0I N/A[

Y0 NEI Ut] N/AC Y[

NO UL-N/ACl YU NEI U-] N/A[]

Y9 NO UC I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 362 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 6 Status: YM N[E U-'

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1R43-POOIC Equip. Class' 20 Equipment Description DG IC CONT PANEL......

Interaction Effects.

7. Are soft targets free from impact by nearby equipment or structures?

YZ NEI U'] N/AE]

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YER NEI UII N/All and masonry block walls not likely to collapse onto the equipment?

Originally identified as an A-46 and IPEEE outlier due to a ceiling light located directly over panel (see photograph 4) that was not properly wire tied to support at the ceiling. DCR 90-042 installed a wire tie for the light support. The walkdown verified that this wire tie was installed.

9. Do attached lines, have adequate flexibility to avoid damage?,

YN NEI U-] N/AL]

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YE NO UE' Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y9 NEI UI-adversely affect the, safety functions of the equipment?

Components inside the panel were inspected visually in accordance with the direction provided in the FAQ related to opening panels.

Comments (Additional pages may be added as necessary)

See 1R43-S001C: for AWC information.

Evaluated by; Juan Vizcaya Date: 09/18/2012 09/18/2012 Patrick Kelly Page 363 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)

Equipment ID No. 1R43-POO1C Equip. Classi 20 Equipment Description DG 1C CONT PANEL NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 6 Status: YZ NE] U-]

Page 364 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 6 2: Equipment Elevation (1R43-POOIC)

Page 365 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet -q of 6 3: Poor Weld Installation Inside Panel Corner (IR43-POOIC)

Page 366 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 4: Ceiling Light Over Panel (1 R43-POO IC)

Page 367 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 3 Status: Y] N[] U[-]

Seismic Walkdown Checklist (SWC)

Equipment lID No. 1EI I-BOQ1A Equip., Class' 21 Equipment Description IE11-BOG1A HEAT EXCHANGER Location: Bldg. REACTOR Floor El. 107 Room, Area SE Diagonal Manufacturer, Model, Etc. (optional butfrecommended)

Instructions for Completing Checklist This checklist may be used. to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is, provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (Le., is the item one of the 50% of SWEL items requiring such verification)?

YE NEI

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

The anchorage was comparedagainst the SQUG package (not dated).

6. Based on the above anchorage: evaluations, is the anchorage free of potentially adverse seismic conditions?

Y[

Ni] UI] N/A[l YN NEI U-] N/AE]

YE NEI U-] N/AD YI NEI UE] N/AU Y

NI" UD]

1 Enter the equipment class name from Appendix B: Classes of Equipment.

Page 368 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 3 Status: YZ N-] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1EI 1-BOOIA Equip. Class:

Equipment Description 1E11-BOOIA HEAT EXCHANGE.R Interaction Effects

7. Are soft targets free from impact.by nearby equipment or structures?

YO NEI UOI N/A-

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NO UU N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations,.is equipment free of potentially adverse seismic interaction effects?

YN NEI UM N/AU YI NI U'-

Other Adverse Conditions

11. Have you looked:for and found no other seismic conditions that could Y23 NEI Un adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walkby was performed within the packagefor I T41-BOO2A.

Evaluated by:. WESLEY WILLIAMS JL

/

KURSA T KINALI.

Date: 9/25/2012 9/25/2012 Page 369 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 3 Status: YZ N[] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1E11-BOO1A Equip. Class' 21 Equipment Description 1E11-BOOIA HEAT EXCHANGER Photographs Page 370 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 4 Status: YE N[] Ut-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1 T48-AOOI Equip. Class' 21 Equipment Description UNIT I NITROGEN STORAGE TANK, Location: Bldg. YARD Floor El. 130 Room, Area YARD Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used-to record the results ofjudgments and, findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Isthe anchorage configuration, verification required (i.e., is the item one Y[D Ni]

of the 50% of SWEL items requiring such verification)?

2.. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Mild surface: corrosion was observed. This is judged not to be a seismic issue by SWEs. However, CR525159 was initiated to prevent this widespread corrosion issue getting worse than surface corrosion.

YZ NEI U[I N/Al Y9 NE U-I N/A[,l

4. Isthe anchorage free of visible cracks in the concrete near the anchors?

YI NO] UE N/AE-

5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

The anchorage was compared against the SQUG package dated 10/21/88 and Drawing H-15166, Rev. 4.

6. Based on the above anchorage. evaluations, is the anchorage free of potentially adverse: seismic conditions?

YN NEI UE-N/Ar-I YN]

IU]

I Enter the equipment class namefrom Appendix B: Classes of Equipment.

Page 371 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 4 Status: Y[

N[]- U[-I Seismic Walkdown Checklist (SWC)

Equipment ID No. 1 T48-A 001, Equip.

Equipment Description UNIT 1. NITROGEN STOR GE TANK Interaction Effects 7.. Are soft targets free from impact by nearby equipment or structures?.

YZ NEI U-I N/AE

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI Ur-N/AO and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

The SQUG package identified potential seismic interaction with adjacent structures and components. Small structures on each side of the tank were removed. Argon tank nearby was removed. There are no remaining interaction concerns.

YN NEI UED N/AE YZ NE UE Other Adverse Conditions

11. Have you looked for and. found no other seismic conditions that could YI01 N[:] UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

None.

Evaluated by: KURSAT KINALI,

,4*§ WESLEY WILLIAMS Date: 9/26/2012 9/26/2012 Page 372 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: YN NEI U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T48-AOOI Equip. Class' 21 Equipment Description UNIT 1 NITROGEN STORAGE TANK Photographs Page 373 of 436

a 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 4 Page 374 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 3 Status: YZ NE] U[-

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1R43-AO01C Equip. Class' 21 Equipment Description FUEL DAY TANK IC Location: Bldg. DIESEL Floor El. 130 Room, Area Day Tank 1C Room Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the.

SWEL. The space below each of the fol lowing questions may be used to record the results of judgments and findings. Additional space isprovided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification-required (i.e.,. is the item one of the 50% of SWEL items requiring such verification)?

YZ NO

2. Is the anchorage free, of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?

ý4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage was checked against the SQUG package dated 10/28/88.

6. Based on. the above anchorage evaluations, is'the anchorage free of potentially adverse seismic conditions?

YN NEI UC-N/All YZ NEI UI-N/A!]

YN NI] U!] N/A!-

YI NiO U!] N/A!

YV NEI Uil 1 Enter the equipment-class name from Appendix B: Classes of Equipment.

Page 375 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 3 Status: YX NEI UE]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1R43-AO01C Equip. Class1 21 Equipment Description FUEL DAY TANK IC Interaction Effects'

7. Are soft targets free from impact by nearby equipment or structures?

Y0 NEI UE N/AU

8. Are overhead. equipment, distribution systems, ceiling tiles and lighting, Yo NO Ur N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines. have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, 'is equipment free of potentially adverse seismic interaction effects?

YCD NE UT N/AU YZ NEI U-'

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NE U0-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

None.

Evaluated by: WESLEY WILLIAMS KURSAT KINALI Date: 9/1212012 9/1212012 Page 376 of 436

ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 3 Status: YZ NE] U[]

I Seismic Walkdown Checklist (SWC)

Equipment ID No. 1R43-AO01C Equip. Class, 21 Equipment Description FUEL DAY TANK 1C Photographs Page 377 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet i of 4 Status: YN NEI UE--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1R43-AOO3A Equip. Class, Equipment Description AIR, RECEIVER TANK Location: Bldg. DIESEL Floor El. 130, Room, Area DIESEL GENERATOR ROOM 1A Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item. of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YI NEI

2. Is the anchorage free of bent, broken, missing or. loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage is consistent with that outlined in calculation C-1 17.0, Rev.

2.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YZ NEI UI N/AU' Y9 NEI UE-N/AU-Y0 NEI UE] N/AU-YN NEI UE1 N/AU:-

YN NEj UE1

' Enter theequipment class name from Appendix B: Classes of Equipment.

Page 378 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 4 Status: YZ N-] U[-]

Seismic Wakdown Checklist (SWC)E Equipment ID No. 1R43.A0O3A Equip. Class' 21 Equipment Description AIR RECEIVER TANK Interaction Effects

7. Are soft targets free from impact by nearby equipmentor structures?

YZ NEJ UE! N/AE!

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y0 NEI U0I N/AE!

and masonry block walls not likely to collapse onto the. equipment?

Overhead lighting is properly supported with wire ties.

9. Do attached lines have adequate flexibility to avoid damage?

Instrument air tubing frames into the top of the tank and is supported as it descends down the wall. A starting air receiver pipe frames into the north. Both appear to have adequate flexibility.

10. Based on the, above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YZ NEI UE! N/AE!

YO NEI U'I Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UCi adversely affect the safety functions of.the equipment?

Comments (Additional pages may be added as necessary)

See 1R43-FO15A for A WC information.

Evaluated by: Juan Vizcava V

Patrick Kelly Date: 09/26/2012 09/26/2012 Page 379 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: Y0 Nr] uEi Seismic Walkdown Checklist (SWC)

Equipment ID No. 1R43-AOO3A Equip. Class' 21 Equipment Description AIR RECEIVER TANK Photographs

ýkw 1: Equipment MPL # (1R43-AO03A)

Page 380 of 436 I

NO. SNCHO82-RPT-01, VERSION 1.0 Sheet 4 of 4 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 2: Equipment Elevation (1R43-AO03A)

Page 381 of 436