SNCH082-RPT-01, Ver. 1.0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 4 of 11
ML12355A052
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/26/2012
From: Stewart W
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-12-2268 SNCH082-RPT-01, Ver. 1.0
Download: ML12355A052 (56)


Text

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 5 Status: YE N[-] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1X41-C002A Equip. Class!

Equipment Description DG ROOM 1A FAN Location: Bldg. DIESEL . Floor El. 150 Room, Area ROOF Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of 'the Seismic Walkdown of an item of equipment on the SWEL. The, space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at. the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.eý, is the item one YEr NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YED NEI UI- N/AEr Viewed anchoragefrom underside of roof slab and on the roof.
3. Is the anchorage free of corrosion that is more than mild surface YN Ni1 UEI N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEl UE1 N/AE
5. Is the anchorage configuration consistent with plant documentation? YE NE U- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NE- UE-potentially adverse seismic conditions?

IEnter the equipment class name from Appendix B; Classes of Equipment.

Page 145 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0

.Sheet 2 Of 5 Status: YE Nn U-J Seismic Walkdown Checklist (SWC)

Equipment ID No., 1X41-COO2A - Equip.,

Equipment Description DG ROOM 1A FAN Interaction Effects

7. Are soft targets free from: impact by nearby equipment or structures? YN NiO UI-J N/AFl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ: N[] UII] N/AL]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YGI NEIl UEI N/AEl
10. Based on the above seismic interaction evaluations, is equipment free YZ NO UE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI UiJ adversely affect the safety functions of the equipment?

Minor concrete surface cracks from the concrete curb~supportingthe fan at the roof elevation. These cracks are not severe in nature and are not judged to be a seismic concern.

Comments (Additional pages may be added as necessary)

See 1X41-COO8A for AWC information.

Evaluated Date. 09/24/2012 09/24/2012 Page 146 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 5 Status: YN NEI U[-

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1X41-COO2A Equip. Class2 9 Equipment Description DO ROOM 1A FAN Photographs 1: Equipment MPL# (IX4I-CO02A)

Page 147 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 2: Equipment Elevation (1X41-C002A)

Page 148 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 5 2: Concrete Surface Cracks at Roof Near Concrete Curb of Fan (lX41-CO02A)

Page 149 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 7 Status: YZ NI U[-]

Seismic Walkdown Checklist (SWC)

Equipment ID.No. 1X41-COO8A Equip. Class, Equipment Description BATTERY ROOM 1A FAN Location: Bldg. DIESEL Floor El. 150 Room, Area ROOF Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgmenis and findings. Additional space is provided at.the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one: YEI NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NE] UI- N/AEl Viewed Fan from below and on the roof.
3. Is the anchorage free of corrosion that is more than mild surface YO, NI] UIZJ N/AEI oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI U,] N/AE
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UEJ N/AZ (Note: This%question, only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YN NEI U[-]

potentially adverse seismic conditions?

'Enter the equipment class name from Appendix B: Classes of Equipment.,

Page 150 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 7 Status: YN N[] U[]

Seismic Walkdown Checklist (SWC)

EquipmentIDNo. 1X41-CO8A Equip. Class, Equipment Description BATTER.YROOM lA FAN Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN Nil UIJ N/A[E
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y1Z NEI U- N/AEl and masonry block walls not likely to co1lapse onto the equipment?
9. Do attached lines have adequate flexibility .to avoid damage? Yi NEI U-- N/AEl
10. Based on the above seismic interaction evaluations, is equipment free Y! NEI UEi of potentially adverse seismic interaction effects?

Other Adverse Conditions

.11. Have you looked for and found no other seismic conditions that could YN NEIUE]

adversely affect the safety functions of the equipment?

The hood at the top of the damperhas two bolts on the west side that are not properdy fastened. The bolt to the north is bent while the bolt to the south is not tight and the hole is oversized (seephotographs4 and 5). Neither bolt has nuts that are fully engaged. The two bolts on the east side are properly fastened. The hood is not a vital aspect for the operabilityof the fan ifthe connection were to fail during a seismic event. However, the bolts need to be properly installed. CR 525153 has been written to install these bolts.

Comments (Additional pages may be added as necessary)

None.

Date: 09/24/2012 Page 151 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 7 Status: YZ N[] UI-Seismic Walkdown Checklist (SWC)

Equipment ID No. 1X41-COO8A Equip. Class, 9 Equipment Description BATTERY ROOM 1A FAN Photographs 1: Equipment MPL# (IX41-CO08A)

Page 152 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 2: Equipment Elevation (1X41-CO08A)

Page 153 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet ; of 3: Equipment from Below Roof Slab (IX4I-CO08A)

Page 154 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of 7 4: Bent Bolt for Equipment Hood (IX41-CO08A)

Page 155 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCHO82-RPT-01, VERSION 1.0 SheP-t '7nf'7 5: Loose Bolt for Equipment Hood (1X41-CO08A)

Page 156 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 4 Status: YN NE] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1X41-C009C Equip. Class, Equipment Description INTAKE STRUCTURE VENT FAN IC Location: Bldg. INTAKE Floor El. 126 Room, Area Pump Room Roof Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may: be used to recordthe results of judgments and findings. Additional space is.provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y-I NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UD- N/AD1 On the housing of the fan, there are some holes as can be seen in the pictures. They are not for structuralpurposes and the top cover of the housing prevents excessive water intrusion through,these.holes. SWEs judged these holes not to be a seismic concern, and determined that the screws are not needed in these holes.
3. Is the anchorage free of corrosion that is more than mild surface YN NEI UD] N/AD-oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y0 NEI UD- N/AD
5. Is the anchorage configuration consistent with plant documentation? YD NDI Ul N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.):
6. Based on the above anchorage evaluations, is the anchorage free of YN NEI UED potentially adverse seismic conditions?

I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 157 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 4 Status: YN NEI U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1X41-CO09C Equip.

Equipment Description INTAKE STRUCTURE VE!VT FAN IC Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y0 NEI UD. N/ADI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y10 ND ULJ N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NDI UD- N/AD
10. Based on the above seismic interaction evaluations, is equipment free YI NEI U-]

of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YED ND UD1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walkby was performed within the package for 1X41-C009B.

Evaluated by: Date: 9/26/2012 9/26/2012 Page 158 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: Y[ NE] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. IX41-CO09C Equip. Class, 9 Equipment Description INTAKE STRUCTURE VENT FAN I C Photographs Page 159 of 436

4 , a ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 4 View from underneath inside the pump room Page 160 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 5 Status: Y2 NI] U[I]

Seismic Wal kdown Checklist (SWC)

Equipment ID No. 1X41-CO09B Equip.

Equipment Description INTAKE STRUCTURE VEINT FAN 1B Location: Bldg. INTAKE Floor El. 126 Room, Area. Intake Pump Room Roof Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the. Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions-may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I.. Is the anchorage configuration verification required (i.e., is the item one YE NE of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YJZ NE UO N/Al At the louver on the roof, one of the bolts fastening the housing to the concrete pedestal has missing washers. However, this was judged not to be: a seismic concern since washers are not vital for the seismic performance of an anchorbolt. Washers are not requiredfor installationsusing mild steel bolts and plates without oversized holes.

Hole is not oversized based on observation.

Also for the housing of 1X41-COO9B, there are missing screws on the side as shown in the pictures. This was judged not to be an issue since there is nothing for the screws to attach to at this location. The holes are not a concern because the overhangingportion ofthe housing prevents the water intrusion. See attachedpictures.

3. Isthe anchorage free of corrosion that is more than mild surface Y[ NiOF UO] N/AZl!

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NEI UO- N/AZ
5. Is the anchorage configuration consistent with plant documentation? YN NO UF- N/AU (Note: This question only applies if the item isone of the 50% for which an anchorage configuration verification is required.)

Anchorage was comparedagainstDwg H-12613, Rev. 13 and SQUG package dated 7/22193. The housing at the roof is not a seismically qualifiedportion of the equipment. SQUG package only included evaluation of bolts inside the intake.

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI UE-potentially adverse seismic conditions?

1 Enter the equipment class name from Appendix B: Classes of Equipment.

Page 161 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 5 Status: YN NM] U-]

Seismic Walkdown Checklist (SWC)

Equipment IDE No. X41-COs9B Equip. Class' Equipment Description INTAKE STRUCTURE VENT FANIB Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YS NO UEU N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YER NI- UI' N/ACl and masonry block walls not likelyto collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YI NEl UE- N/A-I
10. Based on the above, seismic interactionevaluations, is equipment free YN NE UI-of potentially adverse seismic interaction effects?

Other Adverse Conditions 1 . Have you looked for and found no other seismic conditions that could YN NEI UE adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

None.

Evaluated by: KURSA T KINALI AA

'AA121 J, Date: 9/17/2012 WESLEY WILLIAMS 9/17/2012 Page 162 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 5 Status: YM NR-] UF]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1X41-coo9B Equip. Class' 9 Equipment Description INTAKE STRUCTURE VENT FAN 1B Photographs Page 163 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 5 Page 164 of 436

ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 5

-dug Page 165 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 Of 4 Status:. YZ NR[l UL]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1Z41-CO12A Equip. Class1 Equipment Description DOO4A BOOSTER FAN Location: Bldg: CONTROL Floor El. 180 Room, Area CONTROL BUILDING ROOF Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used todocument the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I, Is the anchorage configuration verificationrequired (i.e., is the item one YEI NO of the 50% of SWEL items requiring such verification)?

2.. is the anchorage free of bent, broken, missing or loose hardware? YZ NE UI- N/A-Fan is located inside of duct work. The anchoragefor the duct support to.the concrete roof slab was adequate.

3. Is the anchorage free of corrosion that is more than mild surface YO NEI UE- N/AE oxidation?

See response to question 2.

4. Is the anchorage free of visible, cracks. in.the concrete near the anchors? YZ NO U[3 N/AE]

See response to question 2.

5. Is the anchorage configuration consistent with plant documentation? YEI NEI U N/AS (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NO U-potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 166 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 4 Status: YM NE] U-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1Z41-COt12A Equip. Class Equipment Description D004A BOOSTER FAN Interaction Effects

7. Are soft targets free from impact by nearby .equipment or structures? Y[ Nil U'I N/AU Steel framing that supports ducts in surroundingarea is judged to be adequate to prevent impact to 1Z41-CO12A booster fan.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UL N/AU and masonry block,walls not likely to collapse onto the equipment?
9. Do attached. lines have adequate flexibility to avoid damage? YN NEI UE N/AU1 Flex conduits are coming from duct for equipment and exhibit adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free Yl NEI UEi of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no. other seismic conditions that could YJ0 NEI UEr adversely affect the -safety functions of the equipment?

Comments (Additional pages may be added as necessary)

See 1P41-F422B for A WC information.

Evaluatedby; Juan Vlzcdýa Evaluated 4y~jyizg~a by: Date: 09/26/2012 09/26/20 12 Patrick ellf 0912612012 Page 167 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: YJ N[] U[j]

Seismic Walkdown Checklist (SWC)

Equipment ID No, 1Z41-CO12A Equip. Class, 9 Equipment Description DOO4A BOOSTER FAN Photographs

! Z41 1: Equipment MPL # (IZ4I-COI2A)

Page 168 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 2: Equipment Elevation (IZ41-CO12A)

Page 169 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCHO82-RPT-01, VERSION 1.0 Sheet 1 of 4 Status: Y2 NE] U[j]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T46-COOIB .. Equip. Class1 9 Equipment Description SGST Exhaust Fan Location: Bldg. REACTOR Floor El.. 164 Room, Area RA-R3 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space beloweach of the following questions may be used to record the results ofjudgments and findings. Additional space is provided atithe end of this checklist for documenting other comments.

AnchOraae

1. Is the anchorage configuration verification required (i.e., is the item one Y-1 NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE- NEI UEi N/AO Equipment is an inline component, so there is no anchorage.
3. Is the anchorage free of corrosion that is more than mild surface YEI NEI UE- N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI NEI UE]z N/AZ

.5. Is the anchorage configuration consistent with plant documentation? YE NE UEI N/Am (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YU N[-- UE1 potentially adverse seismic conditions?

1 Enter the equipment class name from Appendix B: Classes of Equipment.

Page 170 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 4 Status: YZ N[-] U[-

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T46-COOIB Equip. Class, 9 Equipment Description SGST Exhaust Fan Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UE] N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI U-I N/AlI and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UE] N/AE]

10; Basedon the above Seismic interaction evaluations, is equipment free YN NEI UEr of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI Ur-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

See Component IT41-FO4OAfor Area Walk-by Checklist.

Evaluated by: John McFarland Date: 09/12/2012 Jeff Horton 09/1212012 Page 171 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: YE NI U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T46-COO1B Equip. Class' 9 Equipment Description SGST Exhaust Fan Photographs Figure 1 - Equipment ID No (IT46-COOIB)

Page 172 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 4 Figure 2 - Equipment Elevation (IT46-COO1B)

Page 173 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 6 Status: YN N[] U[-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1Z41-BOO3A Equip. Classi Equipment Description AIR HANDLING UNIT Location: Bldg. CONTROL Floor El. 180 Room, Area CONTROL BUILDING ROOF Manufacturer, Model, Etc.. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space: is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, rmissing or loose hardware? YU NEI UL] N/AL]
3. Is the anchorage free of corrosion that is more than mild surface YN NEI Ut] N/A-!

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI] Ul] N/AL]
5. Is the anchorage configuration consistent with.plant documentation? YN NEI U] NWAD]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage is consistent with calculation SCNH-94-054, Rev. 0 and drawing B-44279, Rev. C.

6. Based on the above anchorage evaluations, is.the anchorage free of YZ NEI UE]

potentially adverse seismic conditions?

Enter the equipment class name, from Appendix B: Classes of Equipment.

Page 174 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 6 Status:, Y NEI U[]

.Seismic Walkdown Checklist (SWC)

Equipment ID No. 1Z41-BOO3A Equip. Class' Equipment Description AIR HANDLING UNIT Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YEI NEI UL] N/AE-
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI un N/AEl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NEI UE- N/AE!
10. ]Based on the above seismic interaction evaluations, is equipment free Y[ NEI UE1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI UE" adversely affect the safety functions of the equipment?

There is insulation removed from a pipe attachedto the equipment which was not replaced and stored imporperly (see photograph 3).

This is not a seismic concem. CR 524535 has.been written to replace the insulation:properly.

There is a steel frame supporting a large insulatedduct from the air handlerthat exhibits corrosion that is more than mild (see photograph 4). The corrodedsteel does not extend beyond the immediate surface.

The remaining steel does not exhibit the same: corrosiveappearance.

The weight of the duct and insulation is low with respect to the steel frame's capacitybyjudgement. In its currentcondition, the support is judged to be seismically adequate.

Comments (Additional pages may be added as necessary)

SQUG walkdown identified equipment to have steel tabs welded to the existing steel frame for the equipment, which were to be anchored to the concrete roof This was observed to be installed during the walkdown.

See. Z41-FOO9B for AWC information.

Evaluated by- Juan Vizcav Date: 09126/2012 Patrick Ke/ 09126/2012 Page 175 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 6 Status: Y0 N[-] U[]

Seismic Walkdown Checldist (SWC)

Equipment ID No. 1Z41-BOO3A Equip. Class1 10 Equipment Description AIR HANDLING UNIT Photographs 1: Equipment MPL # (1Z41-BO03A)

Page 176 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCHO82-RPT-01, VERSION 1,0 Sheet 4 of 6 2: Equipment Elevation (1Z41-BO03A)

Page 177 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 6 3: Insulation Removed and Improperly Stored (1Z41-B003A)

Page 178 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of 6 4: Corroded Steel Support for Duct (1Z41-BO03A)

Page 179 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet I of 3 Status: YZ NEI U]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T41-BOOIA Equip. Class' 10 Equipment Description CRD PUMPROOM COOLER A Location: Bldg. REACTOR Floor El. 116' Room, Area NW DiagonalR005 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions maybe used to record the results ofjudgments and findings; Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is. the item one YI- NN of the 50% of SWEL items requiringisuch verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y0 NEI UE] N/A]
3. Is the anchorage, free of corrosion that is more than mild surface YE NO U0 N/AE3 oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI UL] N/AL]

5,. Is the anchorage configuration consistent with plant documentation? YE] NEI UO N/Az (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI UE]

potentially adverse seismic conditions?

I Enter the equipment class name from Appendix B.:: Classes of Equipment.

Page 180 of 436

. ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 3 Status: YU N-] U[-]

Seismic Walkdown Checklist (SWC)

Equipmenti EfNo. 1T41-BOOIAs Equip Class, Equipment.Description CRD PUMP ROOM COOLER A Ipteraction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UEI N/ADl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI UD N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NDI UD] N/AD
10. Based on the above seismic interaction evaluations, is equipment free Y! NO Ur-of potentially adverse seismic interaction effects?

Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could YN NDI UD]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

None Date: 9/6/12 Page 181 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 3 Status: Y[ NEI U"]

I Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T41-BOOIA Equip. Class, 10 Equipment Description CRD PUMPROOM COOLER A Photographs Page 182 of 436

. ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet i of 7 Status: YN N-] Ur]

Seismic Walkdown Checklist (SWC)

Equipment IDNo. IT41-BO02A Equip. Class" 10 Equipment Description RHR/CS PUMP ROOM COOLER Location: Bldg. REACTOR Floor El. 107 Room, Area SE Diagonal Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional. space is provided at the end of this checklist for documenting other comments.

Anchorage

1. is the anchorage configuration verification required (i.e., is the item one Y 0 Nr-]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ N[ UE] N/AE]

Housing of the equipment has 4 screws missing in the back which attach the housing to the interiorframe. There are 18 screws present.

Therefore, this is judged not to be a seismic concem.CR523730 was initiatedto replace these screws.SWEs judged this not to be a seismic concern due to the presence of multiple screws present Three bolts on the side (next to the staircase,underneaththe edge) are missing. CR518594 was initiatedto replace these bolts.S WEs judged this not to be a seismic concern due to the presence of more than 10 bolts (sideand back).

Bolts attachingthe unit to the below steel members were found bent and holes were found without bolts.Perthe SQUG evaluation and DrawingB-43459, Rev. D, the originalanchorbolts have been replaced with four Welded steel tube members. The bolts were allowed to be removed orabandonedin place. The originalanchorage was also identified as an IPEEEvulnerability.It was verified that theý 4 steel tube.

members are present and welded to below framing and the equipment.

Two loose bolts were found on the back of the equipment attaching the framing to the support. One of these bolts is near a welded portion, so it can not be tightened, this is okay due to the existing weld. This was judged not be a seismic concern due to the sheer number of existing bolts/screspresent.

Fourlong bolts underneath the cooler fan were observed. However, they were qualified by the SQUG walkdown package dated 11/5/88.

The anchors were verified to match the information in the SQUG package (See Sheet 7).

1 Enter the equipment class name from Appendix B: Classes of Equipment.

Page 183 of 436

. ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 7 Status: Y0 NM- U-il Seismic Walkdown Checklist (SWC)

Equipment ID No. 1 T41-BOO2A Equip. Class, Equipment Description RHR/CS PUMP ROOM COOLEi

3. Is the anchorage free of corrosion that is more than mild surface YZ NEI U[] N/All oxidation?

There is mild surface corrosionon the channels on the back of the equipment However, this is judged not be a seismic issue since it is only mild surface corrosion.

4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UL] N/A[l
5. Is the anchorage configuration consistent with plant documentation? YN NEI UEL N/AL]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage was compared againstthe SQUG package dated 11/5188 and DrawingB-43459, Sheet 1, Rev. 0.

6. Based' on the above anchorage evaluations, is the anchorage free of YS NE UEr potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YE NCI UE- N/AE3
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y0 NE] U[] N/AF]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibilityto avoid damage? YIK. NEI UL] N/AE]
10. Based on the above seismic interaction evaluations, is equipment free Y0 NEl UF' of potentially adverse seismic interaction effects?

Page 184 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 7 Status: YO N-] U[]

Seismic Walkdown Checklist (SWC)

Equipment IDNo. 1T41-BOO2A Equip. Class' 10 Equipment Description RHR/CS PUMP ROOM COOLER Other Adverse Conditions

11. Have you looked for and found no other seismic conditions thatcould YN NEI U0 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary),

None.

Of Evaluated~by: KURSAT KINALI Date: 9/2612012 WESLEY WILLIAMS . , 9/26/2012 Page 185 of 436

  • ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 7 Status: Y1 N[] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. I T41-BO02A Equip. Class, Equipment Description RHFICS PUMP ROOM COOLE1 Photographs Page 186 of 436

, ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 7 Page 187 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of 7 Page 188 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 7 of 7 Page 189 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 3 Status: YN N-] U[-]

Seismic Walkdown Checklist (SWC).

Equipment IDNo. 1T41-BO05B Equip. Class' 10 Equipment Description HPCl ROOM COOLER, Location: Bldg. REACTOR FloorEl. 87 Room, Area HPCIRoom Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may beused to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?
2. Is the-anchorage free of bent, broken, missing or loose hardware? YN NEI U- N/AU
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UE' N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YS NEI UE- N/AU
5. is the anchorage configuration consistent with plant documentation? YZ NC UF' N/AU (Note: This question. only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Compared againstthe earlierSQUG package dated 6/28/89.

6. Based on the above anchorage evaluations,'isthe anchorage free of Y0 NEI U17 potentially adverse seismic conditions?

I Enter the equipment class name from Appendix B: Classes of.Equipment.

Page 190 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 3.

Status: YN NEI U[-

Seismic Walkdown Checklist (SWC)

EquipmentID No. 1T41-B005B Equip. Class" 10 Equipment Description HPCIROOM COOLER Interaction Effects

7. Are soft targets free from :impact by nearby equipment or structures? Y9 NEI UE- N/AU1
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE UE1 N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NEl UE3 N/AUl
10. Based on the above seismic interaction evaluations, is equipment free YN NI UE-of potentially adverse seismic interaction effects?

Other Adverse ,Conditions

11. Have you looked for and found no other seismic conditions that could YI NEI UE-adversely affectathe safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walk by was performed within the package for 1E41-COOI.

Date: 9/10/2012 Page 191 of 436

  • ATTACHMENT 3: SEISMIC WALKODOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 3 Status: YN N[--] U-]

~ Seismic Walkdown Checklist (SWC)

Equipment ID No. 1141-00050B- Equip.

Equipment Description HPCI ROOM COOLER Photographs Page 192 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet. i of 4 Status:- Y[K Nil] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T46-DOOIA Equip. Class' 10 Equipment Description SBGT FILTER TRAIN Location: Bldg. REACTOR Floor El., 158 Room, Area Standby Gas Tank Room Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. is the anchorage configuration verification required (i.e., is the item one YI- NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NO U[- N/AEl 1 of the 16 bolts on the single train anchorageis too short, does not go through the nut completely. The equipment is wide and heavy, therefore little or no tension load is anticipatedin the anchorbolts.

Remaining bolts on the same side of the equipment are adequate to take any shearif needed.Therefore, the SWEs judged that the overall equipment anchorageis seismically adequate.

3. Is the anchorage free of corrosion that is more than mild surface YED NEI UD- N/A-D oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI UD- N/AE!
5. Is the anchorage configuration consistent With plant.documentation? YO] N[D U- N/AZ (Note: This question only applies if the item isone of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage: evaluations, is the anchorage free of YI* NO UDU potentiallyadverse seismic conditions?

I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 193 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 4 Status:: YM NO-] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T46-DOOIA - Equip.,I Equipment Description SBGT FIL TER, TRAIN Interaction Effects

7. Ate soft, targets free from impact by nearby equipment or structures? YN NEII UE1 N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YI N[-] UI- N/AOl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NEI UFJ N/AEl
10. Based on the above seismic interaction evaluations, .is~equipment free YN NO UEl of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditionsthat-could YZ NEI Ul adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

None

ýAi Evaluated by: KURSAT KINALI m Date: 9/7/2012 MIKE STEELE 9/712012 Page 194 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: YN N[I] UE]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1T46-DOOIA Equip. Class, 10 Equipment Description SBGT FILTER TRAIN Photographs Page 195 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 4 Page 196 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 7 Status: YEI NE Uf-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1Z41-BOO8A Equip. ClassL-1-r- PRJc lVc,/zo12.

Equipment Description BOO3A CONDENSING UNIT Location: Bldg. CONTROL Floor El. 180 Room, Area CONTROL BUILDING ROOF Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraae

1. Is the anchorage configuration verification required (i.e., is the item one Y-I NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y[" NO U[' N/AD3 There are compression washers and double nuts missing at the south side of 1Z4 1-BOO8A (see photographs3 and 4). The missing hardware is on the outerportion of the supportpedestal. The inside hardware is presenL The unit is supportedverticallyby the pedestal and the inside connectionsprevent uplift and vibration mitigation as intended. It is judged to be seismically adequate,however, the redundancy of the second hardwareset should be replaced. CR 525669 has been written to replace the missing hardware.
3. Is the anchorage free of corrosion that is more than mild surface YIR NDI UD1 N/AD oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI U" N/AD
5. Is the anchorage configuration consistent with plant documentation? YO NEI UDI N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Vendor drawing SX-19845, Rev. I was used to assistin the consistencycheck during the walkdown.

6. Based on the above anchorage evaluations, is the anchorage free of YDI NO UO potentially adverse seismic conditions?

See response to question 2.

1Enter the equipment class name from Appendix B: Classes of Equipment.

Page 197 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 7 Status: YE] NED U[]

Seismic Walkdown Checklist (SWC)

P.JC It./to/zon-Equipment]DNo. 1Z41-BOOBA Equip. Class, 2 II Equipment Description BOO3A CONDENSING UNIT Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NE UD N/AO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y0 NE] U[] N/A[-

and masonry block walls not likely to collapse onto the equipment?

A steel frame aroundthe perimeterof 1Z41-BOO8A supports an insulated pressure root pipe (see photograph 5). The steel frame is judged to be adequate to prevent the pipe from falling on the equipment.

9. Do attached lines have adequate flexibility to avoid damage? Y[ NEI U] N/Al]
10. Based on the above seismic interaction evaluations, is equipment free YO NEOIUl of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y0 NOl Ul]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Per SQUG A-46 outlierrecommendations,grout was installedin bolt sleeve as verified during walkdown.

See 1P41-F422Bfor AWC information.

Evaluated by: Juan Vizcaya Date: 09/2612012 Patrick Kelly 09126/2012 Page 198 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 7 Status: YCi NZ Uf Seismic Walkdown Checklist (SWC)

EquipmentIDNo. 1Z41-BOO8A Equip. Class,.*4.

4 iI k, %I/*I2ot'i-Equipment Description BOO3A CONDENSING UNIT Photographs 1: Equipment MPL # (1Z41-BO08A)

Page 199 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 7 2: Equipment Elevation (1Z41-BO08A)